Needham Line

From Wikipedia, the free encyclopedia

Template:Short description

Page Module:Infobox/styles.css has no content.

Needham Line
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
An inbound Needham Line train at Hersey station in 2025
Overview
OwnerMBTA
LocaleGreater Boston
TerminiPage Template:Plainlist/styles.css has no content.
Stations12
Service
TypeCommuter rail
SystemMBTA Commuter Rail
Train number(s)600–693 (weekdays)
5609–5687 (weekends)
Operator(s)Keolis North America
Daily ridership6,064 (2024)[1]
Technical
Line lengthScript error: No such module "ConvertIB".13.7 miles (22.0 km)[2]
Track lengthScript error: No such module "ConvertIB".
Track gaugePage Template:Fraction/styles.css has no content.4 ft 8+12 in (1,435 mm)
Minimum radiusScript error: No such module "ConvertIB".
Operating speedScript error: No such module "ConvertIB".
Highest elevationScript error: No such module "ConvertIB".
Route map
Template:Switcher

Script error: No such module "Check for conflicting parameters".

The Needham Line is a branch of the MBTA Commuter Rail system, running west from downtown Boston, Massachusetts through Roxbury, Jamaica Plain, Roslindale, West Roxbury, and the town of Needham. The second-shortest line of the system at just 13.7 miles (22.0 km) long, it carried 6,064 daily riders in Fall 2024. Unlike the MBTA's eleven other commuter rail lines, the Needham Line is not a former intercity mainline; instead, it is composed of a former branch line, a short segment of one intercity line (running in the reverse of its original direction), and a 1906-built connector.

History

West Roxbury Branch

The Boston and Providence Railroad (B&P) opened its main line from Boston through Toll Gate (Forest Hills) to Providence in 1834. The West Roxbury Branch from Forest Hills to Dedham via West Roxbury was opened on July 14, 1849, by the B&P.[3] South Street (Roslindale), Central (Bellevue), and West Roxbury all opened with the branch; Highland was added around 1855.[4]

Charles River Branch Railroad

Needham Center station in 1904

On June 1, 1853, the Charles River Branch Railroad was extended from Newton Upper Falls into Needham as the first stage of a line to Dover and beyond.[4] The railroad was not able to follow its original plan to go through the East Village, Needham's historical center, because one landowner refused to sell; instead, it was routed to Great Plain station in Great Plain Village further to the east.[5][6] Highlandville (later Needham Heights) opened around 1860.[4] The line was used to haul gravel from Needham quarries to fill in the Back Bay from 1859 to the 1880s.[7][6] The line was extended southwest to Medway in 1861 and to Woonsocket in 1863. In 1886, the Boston and Albany Railroad extended the original Charles River Branch Railroad line from Cook Junction to its own main line at Riverside, forming the complete Highland branch.[4]

Needham cutoff

Needham Junction station, built in 1906

The Needham cutoff opened on November 4, 1906, from West Roxbury to Needham Junction, allowing trains from the former New York and New England Railroad to reach Boston without needing to use the Highland branch.[4] Building the cutoff required a significant length of difficult rock cuts – "one of the heaviest pieces of short railroad construction ever attempted in New England" – reaching a depth of 57 feet (17 m) at Great Plain Avenue.[8] Originally Needham Junction was the only stop on the cutoff; Bird's Hill opened as an infill station in 1917.[4]

The segment from West Roxbury to Dedham was subsequently abandoned; the segment from Needham Junction to Cook Junction saw reduced passenger service. Loop service jointly run by the B&A and the New Haven operated over the cutoff and the Highland branch via Needham from 1911 to 1914; after that, most Needham trains originated at Needham Heights or Newton Highlands. Service between Newton Highlands and Newton Upper Falls ended in 1927, and between Needham Heights and Newton Upper Falls in 1932, leaving Needham Heights as the terminus of the line.[4]

Spring Street station on the line to Dedham was closed on July 18, 1938, as part of the 88 stations case. West Roxbury–Dedham service ended effective May 6, 1940.[9]

MBTA era

Highland station in 2012 with its 1980s-built mini-high platform

The West Medway branch shared the line from Forest Hills to Needham Junction until 1938 and from 1940 to 1955; from 1955 to 1967, the line operated as a shuttle from West Medway (Millis after April 1966) to Needham Junction, with the single Budd RDC used for the shuttle being coupled to a Needham Heights train for the remainder of the journey to South Station.[4][10] On April 11, 1966, a two-car inbound train from Needham derailed at Gardner Street in West Roxbury, injuring 61 aboard, due to a tampered switch.[11] The remaining line was purchased by the MBTA from Penn Central on January 27, 1973, along with most of the other southside lines.[10] The stop at Forest Hills, not used since 1940 as the adjacent Washington Street Elevated provided more frequent service, was reopened on June 4, 1973.[10][12]

When the plans to replace the Elevated were drawn up in the 1960s, the new Orange Line was planned to continue past Forest Hills to Needham Heights, replacing the Needham Line. However, as the project was stalled over the next few decades, funding was found only to complete the replacement portion to Forest Hills in 1987, and so the Needham Line was kept as a locomotive-hauled commuter service. During Southwest Corridor construction from 1979 to 1987, the line was closed; upon the initial closure, service levels on the nearby Framingham Line were increased substantially to compensate for the loss of Needham service.[10]

Weekend service and COVID-19 changes

Since the New Haven era, the line has had Saturday service but not Sunday service. Experimental Sunday service was operated from July 11, 1992, until February 14, 1993, along with other new southside weekend service, some of which was made permanent. As part of systemwide service cuts due to budget shortfalls, Saturday service was eliminated on July 7, 2012.[10] Saturday service on the Needham Line, as well as weekend service on the Greenbush Line and Plymouth/Kingston Line, resumed on December 27, 2014.[13] The line was shut down on weekends in September through November 2017 for the installation of Positive Train Control equipment in order to meet a 2020 federal deadline.[14]

Substantially reduced schedules due to the COVID-19 pandemic were in effect from March 16 to June 23, 2020.[10] These temporary systemwide reductions were put in place again on December 14, 2020.[15] Until 2021, the Needham Line plus some parts of the Providence/Stoughton Line were the only MBTA Commuter Rail routes without Sunday service. On January 23, 2021, reduced schedules went into place with no weekend service on seven lines, including the Needham Line.[10]

Service changes on April 5, 2021, added midday service – thus establishing all-day hourly service – as part of a transition to a regional rail model.[16] As part of that schedule change, all Needham Line trains began stopping at Ruggles station after an additional platform there was completed.[17][18] Additionally, the final Needham-bound train on weekdays began operating as a shuttle from Forest Hills station, with a transfer there from a Providence/Stoughton Line train.[19]

Weekend service on the Needham Line and the other six lines resumed on July 3, 2021, with both Saturday and Sunday service.[20] In May 2021, the town had considered having weekend service run only between Needham Junction and South Station to avoid train horns in downtown Needham.[21] As of February 2022, the line has 16 round trips on weekdays and 8 on weekends.[22] By October 2022, the line had 4,881 daily riders – 73% of pre-COVID ridership.[23] This increased to 6,064 daily boardings in 2024.[1]

An infill station at the West Roxbury Education Complex was proposed in 2023 as part of plans to move the John D. O'Bryant School of Mathematics & Science to the site.[24] A station at the adjacent Gardner Street Landfill site (now Millennium Park) had previously been proposed in 1970.[25] The school relocation plan was cancelled in February 2024, but the city indicated it would continue planning the new station.[26]

Station list

Fare zone Location Miles (km)[2] Station Connections and notes
1A Boston 0.0 (0.0) Disabled access Template:Bts Amtrak Amtrak: Template:Lnl, Template:Lnl, Template:Lnl
Template:Ric: Fairmount, Fall River/New Bedford, Framingham/Worcester, Franklin/Foxboro, Greenbush, Kingston, and Providence/Stoughton lines; CapeFLYER (seasonal)
Template:Ric: Template:Ric, Template:Ric (SL1, SL2, SL3, SL4)
Template:Ric: Template:MBTA bus links
Bus transport Intercity buses at South Station Bus Terminal
1.2 (1.9) Disabled access Template:Bts Amtrak Amtrak: Acela, Lake Shore Limited, Northeast Regional
Template:Ric: Framingham/Worcester, Franklin/Foxboro, and Providence/Stoughton lines
Template:Ric: Template:Ric
Template:Ric: Template:MBTA bus links
2.2 (3.5) Disabled access Template:Bts Template:Ric: Franklin/Foxboro and Providence/Stoughton lines
Template:Ric: Template:Ric
Template:Ric: Template:MBTA bus links
Bus transport Template:MBTA other buses
5.0 (8.0) Disabled access Template:Bts Template:Ric: Franklin/Foxboro and Providence/Stoughton lines
Template:Ric: Template:Ric
Template:Ric: Template:MBTA bus links
1 6.4 (10.3) Disabled access Template:Bts Template:Ric: Template:MBTA bus links
7.2 (11.6) Disabled access Template:Bts Template:Ric: Template:MBTA bus links
7.6 (12.2) Disabled access Template:Bts Template:Ric: Template:MBTA bus links
8.0 (12.9) Disabled access Template:Bts Template:Ric: Template:MBTA bus links
2 Needham 10.9 (17.5) Disabled access Template:Bts
12.0 (19.3) Disabled access Template:Bts Template:Ric: Template:MBTA bus links
12.7 (20.4) Disabled access Template:Bts Template:Ric: Template:MBTA bus links
13.7 (22.0) Disabled access Template:Bts Template:Ric: Template:MBTA bus links

References

Page Template:Reflist/styles.css has no content.

  1. ^ a b Template:MBTA Commuter Rail 2024 ridership
  2. ^ a b Template:MBTA Bluebook 2014
  3. ^ Page Module:Citation/CS1/styles.css has no content."Dedham Branch Railroad". Boston Evening Transcript. July 16, 1849. p. 2 – via Newspapers.com.
  4. ^ a b c d e f g h Page Module:Citation/CS1/styles.css has no content.Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 21–24, 29, 43–46. ISBN 9780685412947.
  5. ^ Page Module:Citation/CS1/styles.css has no content.Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. p. 195. ISBN 9780942147087.
  6. ^ a b Page Module:Citation/CS1/styles.css has no content.Clarke, George Kuhn (1911). History of Needham, Massachusetts, 1711-1911. University Press. pp. 413–416, 420, 422 – via Internet Archive.
  7. ^ Page Module:Citation/CS1/styles.css has no content.Newman, William A.; Holton, Wilfred E. (2006). Boston's Back Bay: The Story of America's Greatest Nineteenth-century Landfill Project. Northeastern University Press. pp. 95–111. ISBN 9781555536510.
  8. ^ Page Module:Citation/CS1/styles.css has no content."Last Rail Laid: Work on Boston's Newest Railroad is Progressing Rapidly – The Air Line From West Roxbury to Needham Has Been Cut Through Solid Rock Part of the Way". Boston Daily Globe. 4 February 1906 – via Newspapers.com.
  9. ^ Page Module:Citation/CS1/styles.css has no content."New Schedules of New Haven Start Monday". Boston Globe. May 3, 1940. p. 6 – via Newspapers.com. Open access icon
  10. ^ a b c d e f g Template:NETransit
  11. ^ Page Module:Citation/CS1/styles.css has no content."61 Hurt in Derailment of Needham-Hub Train". Boston Globe. April 11, 1966. pp. 1, 5 – via Newspapers.com.
  12. ^ Page Module:Citation/CS1/styles.css has no content.Plotkin, A.S. (May 31, 1973). "New bridge will be named for Dana, ex-MBTA chief". The Boston Globe. p. 64 – via Newspapers.com.
  13. ^ Page Module:Citation/CS1/styles.css has no content."Commuter Rail: Weekend Service Returning on 3 Lines" (Press release). Massachusetts Department of Transportation. October 7, 2014. Archived from the original on October 13, 2014. Retrieved October 7, 2014.
  14. ^ Page Module:Citation/CS1/styles.css has no content."Commuter Rail Positive Train Control (PTC): Update and Communications Plan for Suspension of Weekend Service" (PDF). Massachusetts Bay Transportation Authority. March 27, 2017. p. 6. Archived from the original (PDF) on March 31, 2017. Retrieved March 30, 2017.
  15. ^ Page Module:Citation/CS1/styles.css has no content."Commuter Rail to Temporarily Operate Reduced Service Schedule Starting December 14" (Press release). Massachusetts Bay Transportation Authority. December 10, 2021.
  16. ^ Page Module:Citation/CS1/styles.css has no content."Reminder: Spring 2021 Commuter Rail Schedules Take Effect April 5" (Press release). Keolis Commuter Services. April 1, 2021. Archived from the original on June 3, 2021. Retrieved June 4, 2021.
  17. ^ Page Module:Citation/CS1/styles.css has no content."Ruggles Elevators and Commuter Rail Platform Now Complete" (Press release). Massachusetts Bay Transportation Authority. April 7, 2021.
  18. ^ Page Module:Citation/CS1/styles.css has no content."Ruggles/Back Bay/South Station: Spring 2021 Schedule" (PDF). Massachusetts Bay Transportation Authority. April 5, 2021.
  19. ^ Page Module:Citation/CS1/styles.css has no content."Needham Line Spring 2021 Schedule" (PDF). Massachusetts Bay Transportation Authority. April 5, 2021.
  20. ^ Page Module:Citation/CS1/styles.css has no content.Coholan, Ryan (May 24, 2021). "Commuter Rail Performance Update" (PDF). Massachusetts Bay Transportation Authority. p. 7.
  21. ^ Page Module:Citation/CS1/styles.css has no content."Notice of Public Hearing Restoration of MBTA Commuter Rail Weekend Service" (Press release). Town of Needham. May 5, 2021.
  22. ^ Page Module:Citation/CS1/styles.css has no content.Belcher, Jonathan (January–February 2022). "MBTA Vehicle Inventory as of February 28, 2022". Rollsign. Vol. 59, no. 1–2. Boston Street Railway Association. p. 17.
  23. ^ Page Module:Citation/CS1/styles.css has no content.Poftak, Steve (October 27, 2022). "GM Report" (PDF). Massachusetts Bay Transportation Authority. p. 6.
  24. ^ Page Module:Citation/CS1/styles.css has no content.Pan, Deanna; Huffaker, Christopher (February 27, 2024). "Mayor Wu, Boston Public Schools call off plans to move the O'Bryant exam school to West Roxbury". The Boston Globe. Archived from the original on March 4, 2024.
  25. ^ Page Module:Citation/CS1/styles.css has no content.Ayres, James B. (June 14, 1970). "W.Roxbury recreation area sought". The Boston Globe. p. 59 – via Newspapers.com.
  26. ^ Page Module:Citation/CS1/styles.css has no content.Wirzbicki, Alan (March 4, 2024). "A new train station in West Roxbury?". The Boston Globe. Archived from the original on March 5, 2024.

Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.

Script error: No such module "Attached KML".

Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.