Structure gauge

From Wikipedia, the free encyclopedia
(Redirected from Bridge clearance)

Template:Short description Lua error in package.lua at line 80: module 'Module:Sidebar/configuration' not found.

File:2014 Replacement of New Road Bridge, Milton Ernest, Bedfordshire.png
Increasing the structure gauge for a larger loading gauge can involve substantial work. The UK's Midland Main Line being upgraded in 2014.
File:DSC01964 enge Kurve Am Bangert.jpg
In narrow curves, long cars like this Template:Cvt long express train car protrude further into the gauge than on a straight track. (180° curve near Königstein im Taunus)

A structure gauge, also called the minimum structure outline, is a diagram or physical structure that sets limits to the extent that bridges, tunnels and other infrastructure can encroach on rail vehicles. It specifies the height and width of station platforms, tunnels and bridges, and the width of the doors that allow access to a warehouse from a rail siding. Specifications may include the minimum distance from rail vehicles to railway platforms, buildings, lineside electrical equipment cabinets, signalling equipment, third rails or supports for overhead lines.[1]

A related but separate gauge is the loading gauge: a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. The difference between these two gauges is called the clearance. The specified amount of clearance makes allowance for wobbling of rail vehicles at speed or the shifting of vehicles on curves; consequently, in some circumstances a train may be permitted to go past a restricted clearance at very slow speed.

Road traffic application

Script error: No such module "Labelled list hatnote".

The term can also be applied to the minimum size of road tunnels, the space beneath overpasses and the space within the superstructure of bridges, as well as doors into automobile repair shops, bus garages, filling stations, residential garages, multi-storey car parks, overhangs at drive-throughs and warehouses.[citation needed]

Eurocode 1: Actions on structures has a definition of "physical clearance" between roadway surface and the underside of bridge element. The code also defines the clearance that is shorter than the physical clearance to account for sag curves, bridge deflection and expected settlements with a recommendation of minimum clearance of 5 metres (16 ft 5 in).[2] In UK, the "standard minimum clearance" for structures over public highways is 16 feet 6 inches (5.03 m).[3] In United States, the "minimum vertical clearance" of overpasses on Interstate Highway System is 16 feet (4.9 m).[4]

See also

Page Template:Div col/styles.css has no content.

References

  1. ^ Page Module:Citation/CS1/styles.css has no content."Structure Gauge and Kinematic Envelope".
  2. ^ Page Module:Citation/CS1/styles.css has no content.Eurocode 1 - Actions on structures - Part 1-7: General actions - Accidental actions (PDF). The European Union. July 2006. Retrieved 31 August 2023.
  3. ^ Page Module:Citation/CS1/styles.css has no content.Preventing of Strikes on Bridge Over Highways - A Protocol for Highway Managers & Bridge Owners (PDF) (2 ed.). Network Rail on behalf of Bridge Strike Prevention Group. p. 6. Retrieved 29 August 2023.
  4. ^ Page Module:Citation/CS1/styles.css has no content."Right of Passage: The Controversy Over Vertical Clearance on the Interstate System". U.S. Department of Transportation Federal Highway Administration. Retrieved 27 August 2023.

Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.


Template:Asbox