Construction management

From Wikipedia, the free encyclopedia
(Redirected from Construction Management)

Template:Short description

Page Module:Message box/ambox.css has no content.

Construction management (CM) is a professional service that applies project management techniques to the planning, design, and construction of a project, from its beginning to its completion. The goal of CM is to control a project's scope, time, cost, and quality (sometimes called the project management triangle or "triple constraints") to achieve the owner’s objectives.[1][2]

Practitioners of construction management are called construction managers. They combine knowledge of building science and business management to coordinate and deliver capital projects such as commercial real estate, transportation infrastructure, and military infrastructure.[3] Professional services firms in North America and Europe increasingly provide CM alongside related specialties such as critical path method (CPM) scheduling, delay analysis, and expert witness testimony for construction disputes.[4]

Overview

Construction management focuses on integrating cost, schedule, quality, safety, and scope throughout the project lifecycle. Unlike a general contractor, a CM firm or professional may be engaged as an owner’s representative to advise during feasibility, design, procurement, and construction.

Roles and responsibilities

A construction manager’s responsibilities typically include:

  • Planning and scheduling
  • Budgeting and cost control
  • Contract administration
  • Quality and safety management
  • Communication and stakeholder coordination
  • Documentation and claims management

According to the Construction Management Association of America (CMAA), the seven common categories of responsibility are: Project Management Planning, Cost Management, Time Management, Quality Management, Contract Administration, Safety Management, and CM Professional Practice.[5][failed verification]

Functions

Core functions of construction management include:

  1. Specifying project objectives and plans, including scope, budgeting, scheduling, performance requirements, and selecting participants
  2. Maximizing resource efficiency through procurement of labor, materials, and equipment
  3. Coordinating design, estimating, contracting, and construction
  4. Establishing communication systems and conflict-resolution mechanisms[6]

Procurement

Bids

  • Open bid: Any contractor can submit a bid (common in public projects).
  • Closed bid: Only invited contractors can submit (common in private projects).[7]

Selection methods

  • Low-bid selection: Chooses the lowest price.
  • Best-value selection: Considers price and qualifications.
  • Qualifications-based selection: Considers qualifications only. Often used in early design stages.[7]

Contract types

  • Lump sum – Fixed price for project delivery
  • Cost plus fee – Owner pays cost plus a fee/percentage
  • Guaranteed maximum price – Cost-plus contract with a cap
  • Unit price – Used when scope is uncertain, priced per unit[7]

Project stages

  • Feasibility and design – Programming, schematic design, design development, contract documents[7]
  • Pre-construction – Assigning the project team, site investigation, permitting[7]
  • Procurement – Hiring subcontractors and purchasing materials[7]
  • Construction – On-site work, progress payments, quality control[8]
  • Owner occupancy – Warranty period and closeout[7]

Common issues

  • Dust and mud control[9]
  • Environmental protection (stormwater, endangered species, vegetation, wetlands, cultural artifacts)[7]

Documentation

Project documentation may include diaries, logs, and daily field reports. These records are important for dispute resolution and can be used as evidence in legal proceedings.[7]

Dispute resolution

Methods include mediation, minitrial, and arbitration. Arbitration is binding and typically more costly than mediation.[7]

Education and practice

CM is taught in associate, bachelor’s, master’s, and doctoral programs. Accreditation bodies include ABET, the American Council for Construction Education (ACCE), and the Associated Schools of Construction (ASC). Programs cover management, construction methods, and law.[10][11]

Software

Construction and capital project management software (CPMS) help manage budgets, schedules, documents, and collaboration. Increasingly, cloud platforms allow owners, contractors, and consultants to work together in real time.

Skills required

  • Building science and technology
  • Public safety and risk management
  • Human resources and leadership
  • Cost engineering and mathematics
  • Communication and negotiation

Project delivery methods

See also

References

  1. ^ Patrick, C. (2003). Construction Project Planning and Scheduling (1st ed.). Prentice Hall.
  2. ^ 3rd Forum "International Construction Project Management," Berlin, 26–27 June 2003.
  3. ^ Construction Management: Project Delivery Methods. (2017). LinkedIn Learning. Retrieved November 1, 2023.
  4. ^ Page Module:Citation/CS1/styles.css has no content."Construction Consulting Services Market". IBISWorld. Retrieved 10 September 2025.
  5. ^ Page Module:Citation/CS1/styles.css has no content."Construction Management Association of America". Archived from the original on 24 July 2015. Retrieved 22 July 2015.
  6. ^ Page Module:Citation/CS1/styles.css has no content."What Is Construction Project Management?". September 2008. Archived from the original on 20 April 2010. Retrieved 4 July 2010.
  7. ^ a b c d e f g h i j Page Module:Citation/CS1/styles.css has no content.Barbara J. Jackson (2010). Construction Management Jumpstart (2nd ed.). Indianapolis, Indiana: Wiley.
  8. ^ Page Module:Citation/CS1/styles.css has no content.Minks, William (2011). Construction Jobsite Management.
  9. ^ Wheelwash Ltd. (2025). Construction site planning: Including a wheel washing system.
  10. ^ Page Module:Citation/CS1/styles.css has no content."Standards and criteria for accreditation of post-secondary construction education degree programs" (PDF). ACCE. Archived from the original (PDF) on 2009-03-26. Retrieved 29 May 2006.
  11. ^ Page Module:Citation/CS1/styles.css has no content."America's Best Colleges 2008". US News. Archived from the original on 2007-09-22.
  12. ^ Page Module:Citation/CS1/styles.css has no content.Stagner, Steve. "Design-Build and Alternative Project Delivery in Texas" (PDF). Texas Council of Engineering Companies. Archived from the original (PDF) on 12 September 2011. Retrieved 18 October 2011.
  13. ^ Halpin, Daniel. Construction Management. Hoboken, NJ: Wiley, 2006.
  14. ^ Page Module:Citation/CS1/styles.css has no content.Strang, Warner (2002). "The Risk In CM "At-Risk"" (PDF). CM eJournal. 4 (9): 3–8. Archived from the original (PDF) on 2016-03-04.
  15. ^ Page Module:Citation/CS1/styles.css has no content."Advantages and Disadvantages of Construction Delivery Methods". Sierra Companies. 2013-01-14. Archived from the original on 2015-07-22.
  16. ^ Page Module:Citation/CS1/styles.css has no content."Public Roads - The Fast 14 Project, May/June 2012". Federal Highway Administration. Retrieved 10 September 2025.

Further reading

  • Halpin, Daniel W. Construction Management. Wiley, Third Edition.
  • Rawlinsons, Australian Construction Handbook, annual editions.

Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Template:Construction overview