FS Class ETR 470

From Wikipedia, the free encyclopedia
(Redirected from ETR 470)

Template:Short description

Page Module:Message box/ambox.css has no content.

Template:DMCA

Template:DMCA

Page Module:Infobox/styles.css has no content.

ETR 470
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
ETR 470 in the Hellenic Train livery
Stock typeElectric multiple unit
ManufacturerTemplate:Pluralize from textFiat Ferroviaria (now Alstom), Schindler, Vevey Technologies.
DesignerTemplate:Pluralize from textGiorgetto Giugiaro
Built atFiat Ferroviaria, Savigliano (Cuneo) / Alstom (Italy)
Family namePendolino
ReplacedSBB-CFF-FFS RAe TEE II
Constructed1993-1997
Entered service1996
Refurbished2008 & 2018-2022
Scrapped2015 (Switzerland)
Number built9 + 1 prototype
Number in service0 (5 mothballed by Hellenic Train)
Number preserved1 (in Switzerland, for possible museum purposes). Leased to Trenitalia since 31 March 2017 for service on Milano - Gotthard - Zurich / Basel lines.
Number scrapped3 (in Switzerland)
Formation3 first class coaches, 1 restaurant car, 5 second class coaches.
Capacity475 passengers : 151 1st class, 322 2nd class, 2 for disabled persons + 29 in the restaurant coach.
OperatorTemplate:Pluralize from textCisalpino, SBB + Trenitalia, Hellenic Train
Specifications
Train length236.60 m (776 ft 3 in)
Car lengthHead: Template:Cvt
intermediate: Template:Cvt
Maximum speed250 km/h (155 mph)
Weight798 t (785 long tons; 880 short tons)
(normal load)
Power output6,600 kW (8,900 hp) ( hourly ), 5880 kW ( continuous ).
[[Railway electrification|Electric systemTemplate:Pluralize from text]]3 kV DC,
15 kV Page Template:Fraction/styles.css has no content.16+23 Hz AC & 25 kV AC railway electrification Overhead catenary
Current collectionPantograph
Track gauge1,435 mm (Page Template:Fraction/styles.css has no content.4 ft 8+12 in) standard gauge

Script error: No such module "Check for conflicting parameters".

ETR 470 (ElettroTreno 470) is a high-speed tilting electric multiple unit, which is now only operated by the Greek company, Hellenic Train. Introduced in September 1996,[1] nine units were built for the Italo-Swiss firm Cisalpino. They were made by Fiat Ferroviaria[2] (now Alstom), and could tilt up to 8°. Today, there are five trains in Greece.[3]

Prior to their arrival in Greece, they performed services under the name Frecciabianca.[4]

Specifications

They can accommodate a total of 475 passengers, and also have a restaurant.[5] They were designed by the Italian Giugiaro.[6] They were initially designed for 3kV DC and 15kV 16.7 Hz AC operation, had four pantographs, as well as a tilting mechanism, accommodating a tilt of up to 8 degrees.[7]

Interiors

History

The 9 trainsets were built between 1993 and 1996 and were originally owned by the Swiss Cisalpino. In total, they cost 16.85 million euros each.

Part of the Pendolino family, it was an updated version of the ETR 460 adapted for services under lines electrified at 3 kV DC in Italy and at 15 kV 16.7 Hz AC in Switzerland and Germany. ETR 470 trains were used for fast services between Italy and Switzerland.[8]

Nine sets of nine coaches each were built, together with a 3-car prototype ("Train 0") which has never been used for commercial service. Since the dissolution of Cisalpino they were split between SBB (4 sets) and Trenitalia (5 sets). SBB planned to retire its 4 sets in 2014 at the latest.

Because of its long series of breakdowns, the ETR 470 was very poorly received in Switzerland. The maintenance costs were four times higher compared to the ICN.[9] The final decision to retire the trains was taken after one of them caught fire on 17 May 2011 in Ambrì.[9] The spokesperson for the Swiss Association for Transport and Environment described them as "not worthy of the Swiss Federal Railways", while the chief executive of Swiss Federal Railways said he wanted to "put an end to this horror".[9] After unsuccessful attempts by SBB to sell the trains, three Swiss ETR 470 trainsets were scrapped in November 2015.[10] ETR 470 009 owned by SBB has been leased to Trenitalia since 31 March 2017 after an Italian ETR 610 had been seriously damaged in an accident (derailment) in Lucerne on 22 March 2017.

Export

Before 2021, the Italian ETR 470 were used for Frecciabianca high-speed services. It was decided in 2019, that these would be used on the AthensThessaloniki railway line run by Ferrovie dello Stato Italiane subsidiary, Hellenic Train. Units would be converted for use in Greece, the existing 3 kV DC equipment was to be replaced with 25 kV 50 Hz equipment and they were to be fitted with ETCS onboard equipment.[11] In August 2018, a similar ETR 485 unit was transferred to Greece for testing purposes, in anticipation of the ETR 470 fleet's arrival.[12] This unit, though, was not designed for the Greek network and so it was decided instead to launch the ETR 470s, which were originally expected to come in 2019 with the completion of electrification and testing of the ETCS.[13] However, in February 2020, with the Hellenic Train depot not yet ready to receive them delivery was delayed. Instead of arriving in the summer of 2020, delivery was postponed until the end of 2020 or the beginning of 2021.[14] The delivery was delayed even further, so the first unit was scheduled to arrive on 18 January 2021 in Thessaloniki via a route from Piacenza. The first ETR 470 train completed the control tests on 10 January 2021 and departed from Milan for Thessaloniki where it arrived on 16 January 2021, two days ahead of schedule. Three trains arrived in Greece in 2021, the fourth in January 2022.[15] On May 15, 2022 the trains started operating on the connection between Thessaloniki and Athens.[16] Due to extensive maintenance issues, all were removed from service by November 2024.[17]

Liveries

Original livery

The original livery included green, black and blue horizontal stripes and red elements below the front, all on white surface, which covered most of the vehicles.

Second livery

This colouring consists of a blue wavy stripe on the side in silver colour, while the red elements were kept under the front from the previous livery. This livery is still used today, in some variations with the logos of the newer companies (i.e. CIS and FS.)

Third livery

Hellenic train uses ETR 470 trains in Greece in new livery. The car body is painted white with a grey stripe above the battery boxes, while the underskirt and the plows are painted black. A blue half-arrow starts from the first passenger window running down the length of the train and ends at the other end. Also, there is a red line which also runs down the length of the train, follows the cab slope and curves below the windscreen. Last, there is a black triangle that surrounds the side cab windows and a smaller blue triangle below those windows.

See also

References

Page Template:Reflist/styles.css has no content.

  1. ^ Page Module:Citation/CS1/styles.css has no content.Brunhouse, Jay (2001). Traveling Europe's trains (5th ed.). Gretna [La.]: Pelican Publ. ISBN 1-56554-854-X. OCLC 46936207.
  2. ^ Page Module:Citation/CS1/styles.css has no content.Καραγιάννης, Νίκος (5 July 2019). "ΤΡΑΙΝΟΣΕ: Το Pendolino ETR470 στέλνει η Ferrovie στην Ελλάδα;". Ypodomes.com (in Ελληνικά). Retrieved 13 January 2021.
  3. ^ Page Module:Citation/CS1/styles.css has no content."Πιστοποιήθηκε και το πέμπτο τρένο ETR της Hellenic Train". Athens Transport (in Ελληνικά). 14 July 2022. Retrieved 16 July 2022.
  4. ^ Page Module:Citation/CS1/styles.css has no content."Frecciabianca- collegamenti e servizi - Le Frecce - Trenitalia". 26 July 2018. Archived from the original on 26 July 2018. Retrieved 13 January 2021.
  5. ^ Page Module:Citation/CS1/styles.css has no content."Ferrovie.it - Avvicendamenti in vista per gli ETR.470 e 610 Trenitalia". Ferrovie.it (in italiano). Retrieved 13 January 2021.
  6. ^ Page Module:Citation/CS1/styles.css has no content."Giugiaro Design designed the Cisalpino AG and the corporate image". Italdesign. Retrieved 13 January 2021.
  7. ^ Page Module:Citation/CS1/styles.css has no content."Elettrotreno politensione ETR 470 - leferrovie.it". 23 April 2016. Archived from the original on 23 April 2016. Retrieved 13 January 2021.
  8. ^ Page Module:Citation/CS1/styles.css has no content.Müller, Adrian (24 December 2008). "Die SBB verlieren die Geduld / SBB loose patience" (in Deutsch). TA Media. 20 Minuten. Retrieved 22 January 2021.
  9. ^ a b c Page Module:Citation/CS1/styles.css has no content."The Cisalpino nears the end of the line". swissinfo.ch. 2 June 2011. Retrieved 2 December 2014.
  10. ^ Page Module:Citation/CS1/styles.css has no content.Blick (16 November 2015). "SBB entsorgen Pendolino-Züge: "720 Meter Schrott auf letzter Fahrt"".
  11. ^ Page Module:Citation/CS1/styles.css has no content."Cisalpino Pendolinos to work Athens – Thessaloniki line". Railway Gazette International. Archived from the original on 3 July 2019. Retrieved 3 July 2019.
  12. ^ Page Module:Citation/CS1/styles.css has no content.Planinski, Konstantin (20 August 2018). "[SI] ETR 485 31 en route to Greece, Hellenic Train tests starting soon". Railcolor News. Retrieved 18 June 2020.
  13. ^ Page Module:Citation/CS1/styles.css has no content."Η ΤΡΑΙΝΟΣΕ επιμένει για το "Ασημένιο Βέλος": δεν ήταν μόνο (υπουργική) φιέστα". Protagon.gr (in Ελληνικά). Retrieved 13 January 2021.
  14. ^ Page Module:Citation/CS1/styles.css has no content.Newsroom (2 February 2020). "Εργα 18 εκατ. ενόψει των νέων τρένων της ΤΡΑΙΝΟΣΕ | Η ΚΑΘΗΜΕΡΙΝΗ". Retrieved 13 January 2021. {{cite web}}: |last= has generic name (help)
  15. ^ Page Module:Citation/CS1/styles.css has no content.Newsroom (17 January 2022). "Fourth part of high-speed train on its way to Greece". kathimerini.gr. Retrieved 25 May 2022. {{cite web}}: |last= has generic name (help)
  16. ^ Page Module:Citation/CS1/styles.css has no content.Newsroom (6 May 2022). "New trains to take to the tracks on May 15". kathimerini.gr. Retrieved 25 May 2022. {{cite web}}: |last= has generic name (help)
  17. ^ Page Module:Citation/CS1/styles.css has no content."Σιδηρόδρομος: Νέες πολύωρες καθυστερήσεις, ενώ τέθηκε εκτός λειτουργίας το τελευταίο «Ασημένιο Βέλος»". ΕΘΝΟΣ (in Ελληνικά). 21 November 2024. Retrieved 13 January 2026.

Page Template:Sister-inline/styles.css has no content.Script error: No such module "Sister project logo". Media related to Script error: No such module "Commons link". at Wikimedia Commons

Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.