Greenstream pipeline
Page Module:Infobox/styles.css has no content.
| Greenstream | |
|---|---|
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. Location of Greenstream (in green) | |
| Script error: No such module "Infobox mapframe". | |
| Location | |
| Country | Libya, Italy |
| General direction | south-north |
| From | Wafa, Libya |
| Passes through | Mediterranean Sea |
| To | Gela, Italy |
| General information | |
| Type | natural gas |
| Partners | Eni, National Oil Corporation |
| Operator | Agip Gas BV |
| Commissioned | 2004 |
| Technical information | |
| Length | Script error: No such module "ConvertIB". |
| Maximum discharge | 11 billion cubic meters per year |
| Diameter | Script error: No such module "ConvertIB". |
Script error: No such module "Check for conflicting parameters".
The Greenstream pipeline, part of the Western Libyan Gas Project, is a natural gas submarine pipeline running from western Libya to the island of Sicily in Italy.
History
The idea of natural gas from Libya to Italy originating from the 1970s. Feasibility studies were carried out in the 1980s and 1990s. Construction of the pipeline started in 2003.[1] The pipeline's main contractor was Saipem, that used for pipeline laying the Castoro Sei and Crawler vessels. The shore approach and landfall works were done by Boskalis Offshore.[2]
The supplies started on 1 October 2004 and the pipeline was inaugurated on 7 October 2004 by Silvio Berlusconi and Muammar Gaddafi.[1][3]
Technical features
The Greenstream pipeline is 540 kilometres (340 mi) long and it runs from Mellitah in Libya to Gela, in Sicily, Italy.[3] It is located in water depths exceeding 1,100 metres (3,600 ft).[4] It includes also the Mellitah compressor station and the Gela reception terminal. The pipeline is supplied from the Bahr Essalam offshore field, Bouri Field and Wafa field near Algerian border, 530 kilometres (330 mi) from Mellitah. The construction cost US$6.6 billion.[1] The pipeline has a diameter of 32 inches (810 mm) and an initial capacity of 8 billion cubic meters (bcm) of natural gas per year.[3] Later the capacity was increased to 11 bcm.[5][1]
Ownership
The pipeline is constructed and owned by Agip Gas BV, a joint venture of the Italian energy company Eni and the National Oil Corporation (NOC) of Libya.[3]
See also
Lua error in mw.title.lua at line 404: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
References
Page Template:Reflist/styles.css has no content.
- ^ a b c Page Module:Citation/CS1/styles.css has no content."Libya-Italy Pipeline Gas Sold Out". Alexander's Gas & Oil Connections. 2004-10-08. Archived from the original on 2010-12-15. Retrieved 2009-07-29.
- ^ Page Module:Citation/CS1/styles.css has no content."LibyanGas TransmissionSystem" (PDF). Royal Boskalis. Archived from the original (PDF) on 2014-10-24. Retrieved 2011-09-07.
- ^ a b c d Page Module:Citation/CS1/styles.css has no content."New gas pipeline linking Libya to Italy opened". Entrepreneur Media. 2005-07-18. Retrieved 2009-07-29.
- ^ Page Module:Citation/CS1/styles.css has no content."Case Study: Greenstream pipeline project" (PDF). Pigging Products and Services Association. Retrieved 20 July 2015.
- ^ Page Module:Citation/CS1/styles.css has no content."Eni and NOC Establish the Foundations For Future Joint Oil & Gas Development in Libya". Oilvoice. 2007-10-17. Retrieved 2009-07-29.