Antares (rocket)

From Wikipedia, the free encyclopedia
(Redirected from Taurus II)

Template:Short description Lua error in package.lua at line 80: module 'Module:Hatnote list' not found. Script error: No such module "about". Template:DMCA

Page Module:Infobox/styles.css has no content.

Page Module:Infobox/styles.css has no content.Page Module:Infobox/styles.css has no content.Page Module:Infobox/styles.css has no content.
Antares
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
Launch of an Antares 230
FunctionScript error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Project costScript error: No such module "WikidataIB".
Cost per launchScript error: No such module "WikidataIB".
Cost per yearScript error: No such module "WikidataIB".
Size
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
StagesScript error: No such module "WikidataIB".
Capacity Page Module:Infobox/styles.css has no content.
Payload to LEO
AltitudeScript error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.8,000 kg (18,000 lb)[5]
VolumeScript error: No such module "WikidataIB".
Associated rockets
FamilyScript error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
ComparableDelta II, Atlas III, Atlas V, Falcon 9
Launch history
StatusLua error in package.lua at line 80: module 'Module:GetParameters' not found.
Launch sitesScript error: No such module "WikidataIB".
Total launchesScript error: No such module "WikidataIB".
Success(es)Script error: No such module "WikidataIB".
FailureTemplate:Pluralize from textScript error: No such module "WikidataIB".
Partial failureTemplate:Pluralize from textScript error: No such module "WikidataIB".
Notable outcomeTemplate:Pluralize from textScript error: No such module "WikidataIB".
LandingsScript error: No such module "WikidataIB".
First flightScript error: No such module "WikidataIB".
Last flightScript error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Page Module:Infobox/styles.css has no content.
First stage (Antares 100)
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Empty massScript error: No such module "WikidataIB".
Gross massScript error: No such module "WikidataIB".
Propellant massScript error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Specific impulseScript error: No such module "WikidataIB".
Burn timeScript error: No such module "WikidataIB".
PropellantScript error: No such module "WikidataIB".
First stage (Antares 200)
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Empty massScript error: No such module "WikidataIB".
Gross massScript error: No such module "WikidataIB".
Propellant massScript error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Specific impulseScript error: No such module "WikidataIB".
Burn timeScript error: No such module "WikidataIB".
PropellantScript error: No such module "WikidataIB".
First stage (Antares 300)
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Empty massScript error: No such module "WikidataIB".
Gross massScript error: No such module "WikidataIB".
Propellant massScript error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Specific impulseScript error: No such module "WikidataIB".
Burn timeScript error: No such module "WikidataIB".
PropellantScript error: No such module "WikidataIB".
Second stage – Castor 30A/B/XL
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Empty massScript error: No such module "WikidataIB".
Gross massScript error: No such module "WikidataIB".
Propellant massScript error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Lua error in package.lua at line 80: module 'Module:GetParameters' not found.Script error: No such module "WikidataIB".
Specific impulseScript error: No such module "WikidataIB".
Burn timeScript error: No such module "WikidataIB".
PropellantScript error: No such module "WikidataIB".
Template:Edit on Wikidata

Template:Private spaceflight

Antares (/ænˈtɑːrz/), known during early development as Taurus II, is an American expendable medium-lift launch vehicle developed by Orbital Sciences Corporation with financial support from NASA under the Commercial Orbital Transportation Services (COTS) program awarded in February 2008. It was developed alongside Orbital's automated cargo spacecraft, Cygnus, which also received COTS funding. Like other Orbital launch vehicles, Antares leveraged lower-cost, off-the-shelf parts and designs. Since 2018, the rocket has been manufactured by Northrop Grumman.

The first stage is liquid fueled, burning RP-1 (kerosene) and liquid oxygen (LOX). As Orbital had limited experience with large liquid stages, construction was subcontracted for all versions of Antares. The 100 and 200 series were built by the Ukrainian companies Pivdenne and Pivdenmash, using refurbished NK-33 engines from the Soviet N1 program on the 100 series and newly built Russian RD-181 engines on the 200 series after the loss of an Antares 130 vehicle in 2014.[8] After Russia's 2022 invasion of Ukraine ended access to these suppliers, Northrop Grumman announced the 300 series, with a first stage developed by Firefly Aerospace based on the company's MLV rocket using composite structures and seven Miranda engines to increase payload capacity.

The second stage is a solid-fuel motor from the Castor 30 family, derived from the Castor 120 used on the Minotaur-C (the original Taurus I) and ultimately from the Peacekeeper ICBM first stage. While an optional third stage is offered, it has never been used, as the Cygnus spacecraft incorporates its own service module for orbital maneuvers.

Antares made its first flight on April 21, 2013, launching the Antares A-ONE mission from Launch Pad 0A at the Mid-Atlantic Regional Spaceport (MARS) with a Cygnus mass simulator. On September 18, 2013, it successfully launched Orb-D1, the first Cygnus mission to rendezvous with the International Space Station (ISS). After completing the two COTS demonstration flights, Antares and Cygnus were awarded two Commercial Resupply Services contracts covering 25 ISS cargo missions.

The COTS program also supported the development of SpaceX's Dragon spacecraft and Falcon 9 rocket, intended to foster a competitive commercial spaceflight industry. Unlike Falcon 9, which has secured a broad commercial launch market, Antares has been used exclusively for NASA cargo missions, with Cygnus as its sole payload.

History

As the Space Shuttle program neared its end, NASA sought to develop new capabilities for resupplying the International Space Station (ISS). Departing from the traditional model of government-owned and operated spacecraft, the agency proposed a new approach: commercial companies would operate spacecraft, while NASA would act as a customer.

To encourage innovation, NASA offered funding through the Commercial Orbital Transportation Services (COTS) program to support the development of new spacecraft and launch vehicles. On February 19, 2008, NASA announced that it would award Orbital Sciences Corporation a COTS contract worth $171 million. Orbital was expected to invest an additional $150 million, divided between $130 million for the rocket booster and $20 million for the spacecraft.[9]

As part of the COTS program, Orbital would be expected to conduct a successful demonstration of its rocket booster and spacecraft. If both demonstration flights were successful, Orbital would be eligible for a lucrative Commercial Resupply Service contract of $1.9 billion for eight flights to the ISS.[10]

In June 2008, it was announced that the Mid-Atlantic Regional Spaceport, formerly part of the Wallops Flight Facility, in Virginia, would be the primary launch site for the rocket.[11] Launch pad 0A (LP-0A), previously used for the failed Conestoga rocket, would be modified to handle Antares.[12] Wallops allows launches which reach the International Space Station's orbit as effectively as those from Cape Canaveral, Florida, while being less crowded.[9][13] The first Antares flight launched a Cygnus mass simulator.[14]

On December 10, 2009, Alliant Techsystems Inc. (ATK) test-fired their Castor 30 motor for use on the second stage of the Antares rocket.[15] In March 2010, Orbital Sciences and Aerojet completed test firings of the AJ-26 engines.[16]

Originally designated the Taurus II, Orbital Sciences renamed the vehicle Antares, after the star of the same name,[17] on December 12, 2011.

As of April 2012, development costs were estimated at $472 million.[6]

On February 22, 2013, a hot fire test was successfully performed, the entire first stage being erected on the pad and held down while the engines fired for 29 seconds.[14]

Design

An assembled Antares rocket in the Horizontal Integration Facility.

First stage

The first stage of Antares burns RP-1 (kerosene) and liquid oxygen (LOX). As Orbital had little experience with large liquid stages and LOX propellant, the first stage core was designed and is manufactured in Ukraine by Pivdenne Design Office and Pivdenmash[9] and includes propellant tanks, pressurization tanks, valves, sensors, feed lines, tubing, wiring and other associated hardware.[18] Like the Zenit—also manufactured by Pivdenmash—the Antares vehicle has a diameter of 3.9 m (150 in) with a matching 3.9 m payload fairing.[4]

Antares 100 series

The Antares 100-series first stage was powered by two Aerojet AJ26 engines. These began as Kuznetsov NK-33 engines built in the Soviet Union in the late 1960s and early 1970s, 43 of which were purchased by Aerojet in the 1990s. Twenty of these were refurbished into AJ26 engines for Antares.[19] Modifications included equipping the engines for gimballing, adding US electronics, and qualifying the engines to fire for twice as long as designed and to operate at 108% of their original thrust.[1][16] Together they produced 3,265 kilonewtons (734,000 lbf) of thrust at sea level and 3,630 kN (816,100 lbf) in vacuum.[20]

Following the catastrophic failure of an AJ26 during testing at Stennis Space Center in May 2014 and the Orb-3 launch failure in October 2014, likely caused by an engine turbopump,[21] the Antares 100-series was retired.

Antares 200 series

Because of concerns over corrosion, aging, and the limited supply of AJ26 engines, Orbital had selected new first stage engines[16][22] to bid on a second major long-term contract for cargo resupply of the ISS. After the loss of the Antares rocket in October 2014, Orbital Sciences announced that the Russian RD-181—a modified version of the RD-191—would replace the AJ-26 on the Antares 200-series.[23][24] The first flight of the Antares 230 configuration using the RD-181 launched on October 17, 2016, carrying the Cygnus OA-5 cargo to the ISS.

The Antares 200 and 200+ first stages are powered by two RD-181 engines, which provide 440 kilonewtons (100,000 lbf) more thrust than the dual AJ26 engines used on the Antares 100. Orbital adapted the existing core stage to accommodate the increased performance in the 200 Series, allowing Antares to deliver up to 6,500 kg (14,300 lb) to low Earth orbit.[5] The surplus performance of the Antares 200-series will allow Orbital to fulfill its ISS resupply contract in only four additional flights, rather than the five that would have been required with the Antares 100-series.[25][26][27]

While the 200 series adapted the originally ordered 100 Series stages (KB Pivdenne/Pivdenmash, Zenit derived),[28] it requires under-throttling the RD-181 engines, which reduces performance.[26]

The Antares was upgraded to the Antares 230+ for the NASA Commercial Resupply Services 2 contract. NG-12, launched November 2, 2019, was the first NASA CRS-2 mission to ISS using the 230+ upgrades. The most significant upgrades were structural changes to the intertank bay (between the LOX and RP-1 tanks) and the forward bay (forward of the LOX). Additionally, the company is working on trajectory improvements via a "load-release autopilot" that will provide greater mass to orbit capability.[29]

Antares 300 series

In August 2022, Northrop Grumman announced that it had contracted Firefly Aerospace to build the 300-series first stage. They will also be collaborating on the in-development Eclipse launch vehicle. Eclipse and the Antares 300-series will use the same composite structures, and seven Miranda engines. The Template:Cvt of thrust they provide will be substantially greater than that of the previous 200-series first stage. Northrop Grumman indicated the new first stage will substantially increase the mass capability of Antares.[30][31]

The announcement occurred as a result of the 2022 Russian invasion of Ukraine, which jeopardized supply chains for the previous first stages, which had been manufactured in Ukraine and used RD-181 engines from Russia.[32]

Second stage

The second stage is an Orbital ATK Castor 30-series solid-fuel rocket, developed as a derivative of the Castor 120 solid motor used as Minotaur-C's first stage, itself based on a LGM-118 Peacekeeper ICBM first stage.[33] The first two flights of Antares used a Castor 30A, which was replaced by the enhanced Castor 30B for subsequent flights. The Castor 30B produces 293.4 kN (65,960 lbf) average and 395.7 kN (88,960 lbf) maximum thrust, and uses electromechanical thrust vector control.[20] For increased performance, the larger Castor 30XL is available[28] and will be used on ISS resupply flights to allow Antares to carry the Enhanced Cygnus.[20][34][35]

The Castor 30XL upper stage for Antares 230+ is being optimized for the CRS-2 contract. The initial design of the Castor 30XL was conservatively built, and after gaining flight experience it was determined that the structural component of the motor case could be lightened.[29]

Third stage

Antares offers three optional third stages: the Bi-Propellant Third Stage (BTS), a Star 48-based third stage and an Orion 38 motor. BTS is derived from Orbital's GEOStar, a spacecraft bus and uses nitrogen tetroxide and hydrazine for propellant; it is intended to precisely place payloads into their final orbits.[4] The Star 48-based stage uses a Star 48BV solid rocket motor and would be used for higher energy orbits.[4] The Orion 38 is used on the Minotaur and Pegasus rockets as an upper stage.[36]

Fairing

The 3.9-meter (13 ft) diameter, 9.9-meter (32 ft) high fairing is manufactured by Northrop Grumman of Iuka, Mississippi, which also builds other composite structures for the vehicle, including the combined fairing adapter, dodecagon, motor cone, and interstage.[37]

Rear view of Antares

NASA Commercial Resupply Services-2 : Enhancements

On January 14, 2016, NASA awarded three cargo contracts via CRS-2. Orbital ATK's Cygnus was one of these contracts.[38]

According to Mark Pieczynski, Orbital ATK Vice President, Flight Systems Group, "A further improved version [of Antares for CRS-2 contract] is in development which will include: Stage 1 core updates including structural reinforcements and optimization to accommodate increased loads. (Also) certain refinements to the RD-181 engines and CASTOR 30XL motor; and Payload accommodations improvements including a 'pop-top' feature incorporated in the fairing to allow late Cygnus cargo load and optimized fairing adapter structure".

Previously, it was understood that these planned upgrades from the Antares 230 series would create a vehicle known as the Antares 300 series. However, when asked specifically about Antares 300 series development, Mr. Pieczynski stated that Orbital ATK has "not determined to call the upgrades, we are working on, a 300 series. This is still TBD".[39]

In May 2018 the Antares program manager Kurt Eberly indicated that the upgrades will be referred to as Antares 230+.[29]

Use of Antares 330 for future CRS flights was confirmed in reporting from Breaking Defense in June 2024. The 330 will used the same second stage, fairing, avionics and software as prior versions.[40]

Configurations and numbering

Test firing of Castor 30 second stage

The first two test flights used a Castor 30A second stage. All subsequent flights will use either a Castor 30B or Castor 30XL. The rocket's configuration is indicated by a three-digit number, the first number representing the first stage, the second the type of second stage, and the third the type of third stage.[34] A + sign added as suffix (fourth position) signifies performance upgrades to the Antares 230 variant.

Number First digit Second digit Third digit
(First stage) (Second stage) (Third stage)
0 Template:Screen reader-only Template:Screen reader-only No third stage
1 2 × AJ26-62 Castor 30A BTS (3 × BT-4)
2 2 × RD-181 Castor 30B Star 48BV
3 7 × Miranda Castor 30XL Orion 38

Notable missions and anomalies

Antares A-ONE

Script error: No such module "Labelled list hatnote". Originally scheduled for 2012, the first Antares launch, designated A-ONE[41] was conducted on April 21, 2013,[42] carrying the Cygnus Mass Simulator (a boilerplate Cygnus spacecraft) and four CubeSats contracted by Spaceflight Incorporated: Dove 1 for Cosmogia Incorporated (now Planet Labs) and three PhoneSat satellites—Alexander,[43] Graham and Bell for NASA.[44]

Prior to the launch, a 27-second test firing of the rocket's AJ26 engines was conducted successfully on February 22, 2013, following an attempt on February 13 which was abandoned before ignition.[14]

A-ONE used the Antares 110 configuration, with a Castor 30A second stage and no third stage. The launch took place from Pad 0A of the Mid-Atlantic Regional Spaceport on Wallops Island, Virginia. LP-0A was a former Conestoga launch complex which had only been used once before, in 1995, for the Conestoga's only orbital launch attempt.[45] Antares became the largest—and first—liquid-fuelled rocket to fly from Wallops Island, as well as the largest rocket launched by Orbital Sciences.[41]

The first attempt to launch the rocket, on April 17, 2013, was scrubbed after an umbilical detached from the rocket's second stage, and a second attempt on April 20 was scrubbed due to high altitude winds.[46] At the third attempt on April 21, the rocket lifted off at the beginning of its launch window. The launch window for all three attempts was three hours beginning at 21:00 UTC (17:00 EDT), shortening to two hours at the start of the terminal count, and ten minutes later[<span title="Script error: No such module "decodeEncode".">clarification needed] in the count.[45][47]

Cygnus CRS Orb-3

Script error: No such module "Labelled list hatnote". File:Antares Fails to Reach Orbit with Cygnus CRS-3 after Rocket Explodes.webm

Pad 0A after the incident

On October 28, 2014, the attempted launch of an Antares carrying a Cygnus cargo spacecraft on the Orb-3 resupply mission failed catastrophically six seconds after liftoff from Mid-Atlantic Regional Spaceport at Wallops Flight Facility, Virginia.[48] An explosion occurred in the thrust section just as the vehicle cleared the tower, and it fell back down onto the launch pad. The range safety officer sent the destruct command just before impact.[49][50] There were no injuries.[51] Orbital Sciences reported that Launch Pad 0A "escaped significant damage",[50] though initial estimates for repairs were in the $20 million range.[52] Orbital Sciences formed an anomaly investigation board to investigate the cause of the incident. They traced it to a failure of the first stage LOX turbopump, but could not find a specific cause. However, the refurbished NK-33 engines, originally manufactured over 40 years earlier and stored for decades, were suspected as having leaks, corrosion, or manufacturing defects that had not been detected.[53] The NASA Accident Investigation Report was more direct in its failure assessment.[54] On October 6, 2015, almost one year after the accident, Pad 0A was restored to use. Total repair costs were about $15 million.[55]

Following the failure, Orbital sought to purchase launch services for its Cygnus spacecraft in order to satisfy its cargo contract with NASA,[22] and on December 9, 2014, Orbital announced that at least one, and possibly two, Cygnus flights would be launched on Atlas V rockets from Cape Canaveral Air Force Station.[56] As it happened, Cygnus OA-4 and Cygnus OA-6 were launched with an Atlas V and the Antares 230 performed its maiden flight with Cygnus OA-5 in October 2016. One further mission was launched aboard an Atlas in April 2017 (Cygnus OA-7), fulfilling Orbital's contractual obligations towards NASA. It was followed by the Antares 230 in regular service with Cygnus OA-8E in November 2017, with three further missions scheduled on their extended contract.

Launch statistics

Page Template:Column/styles.css has no content.

Page Template:Column/styles.css has no content.

Rocket configurations

  •   Antares 110
  •   Antares 120
  •   Antares 130
  •   Antares 230
  •   Antares 230+
Page Template:Column/styles.css has no content.

Launch outcomes

1
2
3
2013
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25
'26
  •   Failure
  •   Partial failure
  •   Success
  •   Scheduled
Page Template:Column/styles.css has no content.

Operator

1
2
3
2013
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
Page Template:Column/styles.css has no content.

Past launches

Template:Sticky header

Notes:

Future launches

Template:Sticky header

Launch sequence

The following table shows a typical launch sequence of Antares-100 series rockets, such as for launching a Cygnus spacecraft on a cargo resupply mission to the International Space Station.[68] The coast phase is required because the solid-fuel upper stage has a short burn time.[95]

Mission time Event Altitude
T−03:50:00 Launch management call to stations
T−03:05:00 Poll to initiate liquid oxygen loading system chilldown
T−01:30:00 Poll for readiness to initiate propellant loading
T−00:15:00 Cygnus/payload switched to internal power
T−00:12:00 Poll for final countdown and MES medium flow chilldown
T−00:11:00 Transporter-Erector-Launcher (TEL) armed for rapid retract
T−00:05:00 Antares avionics switched to internal power
T−00:03:00 Auto-sequence start (terminal count)
T−00:02:00 Pressurize propellant tanks
T−00:00:00 Main engine ignition
T+00:00:02.1 Liftoff 0
T+00:03:55 Main engine cut-off (MECO) 102 km (63 mi)
T+00:04:01 Stage one separation 108 km (67 mi)
T+00:05:31 Fairing separation 168 km (104 mi)
T+00:05:36 Interstage separation 170 km (106 mi)
T+00:05:40 Stage two ignition 171 km (106 mi)
T+00:07:57 Stage two burnout 202 km (126 mi)
T+00:09:57 Payload separation 201 km (125 mi)

See also

Lua error in mw.title.lua at line 404: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

References

Page Template:Reflist/styles.css has no content.

  1. ^ a b Page Module:Citation/CS1/styles.css has no content.Kyle, Ed (February 19, 2022). "Space Launch Report: Antares (Taurus II)". Archived from the original on April 6, 2022. Retrieved September 24, 2022.
  2. ^ a b Page Module:Citation/CS1/styles.css has no content."Antares (100 Series)". SpaceFlight101. Archived from the original on November 10, 2016. Retrieved May 5, 2016.
  3. ^ a b c Page Module:Citation/CS1/styles.css has no content."Antares 200 Series – Rockets". spaceflight101.com. Archived from the original on January 30, 2021. Retrieved November 7, 2016.
  4. ^ a b c d e Page Module:Citation/CS1/styles.css has no content."Antares Medium-class Launch Vehicle: Fact Sheet" (PDF). Orbital Sciences Corporation. 2013. Archived from the original (PDF) on June 3, 2013. Retrieved April 25, 2013.
  5. ^ a b Page Module:Citation/CS1/styles.css has no content."Antares – Fact Sheet" (PDF). Orbital ATK. 2017. FS007_06_OA_3695_021317. Archived from the original (PDF) on February 13, 2018. Retrieved February 12, 2018.
  6. ^ a b Page Module:Citation/CS1/styles.css has no content.Rosenberg, Zach (April 30, 2012). "Orbital Sciences development costs increase". Flightglobal.com. Archived from the original on June 7, 2023.
  7. ^ Page Module:Citation/CS1/styles.css has no content."Surplus Missile Motors: Sale Price Drives Potential Effects on DOD and Commercial Launch Providers" (PDF). U.S. Government Accountability Office. August 2017. p. 30. GAO-17-609. Archived (PDF) from the original on April 20, 2023.
  8. ^ Page Module:Citation/CS1/styles.css has no content."Russian Rocket Engine Deliveries to the U.S. Evade Sanctions". The St. Petersburg Times (sptimes.ru). August 15, 2014. Archived from the original on August 18, 2014. Retrieved May 2, 2025.
  9. ^ a b c Page Module:Citation/CS1/styles.css has no content.Bergin, Chris (February 25, 2008). "none". Space News. p. 12.
  10. ^ Page Module:Citation/CS1/styles.css has no content.Chris Bergin (December 23, 2008). "SpaceX and Orbital win huge CRS contract from NASA". nasaspaceflight.com. Retrieved February 22, 2015.
  11. ^ Page Module:Citation/CS1/styles.css has no content.Hickey, Gordon (June 9, 2008). "Governor Kaine announces 125 new jobs for Virginia" (Press release). Commonwealth of Virginia from YesVirginia.org. Archived from the original on March 25, 2013. Retrieved May 11, 2010.
  12. ^ Page Module:Citation/CS1/styles.css has no content.Kennedy, Jack (June 13, 2008). "Taurus-2 Launch Pad to be Ready in 18-Months at Wallops Island Spaceport". Spaceports. Blogspot.com.
  13. ^ Page Module:Citation/CS1/styles.css has no content.Glass, Jon W. (February 20, 2008). "Wallops up for big role with firm's NASA contract". The Virginian-Pilot from HamptonRoads.com. Archived from the original on February 25, 2021. Retrieved April 23, 2008.
  14. ^ a b c Page Module:Citation/CS1/styles.css has no content.Bergin, Chris (February 22, 2013). "Hot fire success for Orbital's Antares". NASASpaceFlight.com. Retrieved February 23, 2013.
  15. ^ Page Module:Citation/CS1/styles.css has no content.Beneski, Barron (December 10, 2009). "Second Stage Rocket Motor Of Orbital's Taurus II Launcher Successfully Ground Tested" (Press release). Orbital Sciences Corporation.
  16. ^ a b c Page Module:Citation/CS1/styles.css has no content.Clark, Stephen (March 15, 2010). "Aerojet confirms Russian engine is ready for duty". Spaceflight Now. Archived from the original on March 22, 2010. Retrieved March 18, 2010.
  17. ^ Page Module:Citation/CS1/styles.css has no content.Beneski, Barron (December 12, 2011). "Orbital Selects "Antares" as Permanent Name for New Rocket Created by the Taurus II R&D Program" (Press release). Orbital Sciences Corporation.
  18. ^ Page Module:Citation/CS1/styles.css has no content."Antares User's Guide, Rev. 1.2" (PDF). Orbital Sciences Corporation. December 2009.
  19. ^ Page Module:Citation/CS1/styles.css has no content."Antares First-stage Engines Available Long Term, Aerojet Rocketdyne Chief Says". SpaceNews.com. June 17, 2013.
  20. ^ a b c Page Module:Citation/CS1/styles.css has no content."Antares Medium-Class Launch Vehicle: Brochure" (PDF). Orbital Sciences Corporation. 2013. Archived from the original (PDF) on February 9, 2014. Retrieved April 25, 2012.
  21. ^ Page Module:Citation/CS1/styles.css has no content."SpaceflightNow". Engine turbopump eyed in Antares launch failure. Retrieved June 12, 2017.
  22. ^ a b Page Module:Citation/CS1/styles.css has no content."Orbital's Cygnus – on a SpaceX Falcon 9?". spaceflightinsider.com. November 24, 2014. Archived from the original on December 1, 2020. Retrieved November 28, 2014. Orbital has announced that it is planning to use another engine on Antares and that it will likely not use any more of the 40-year-old AJ-26 engines on the rocket's next flight—which Orbital hopes to conduct in 2016.
  23. ^ Page Module:Citation/CS1/styles.css has no content."Orbital Sciences likely to choose Russian engine for new Antares rocket". TASS. October 31, 2014. Retrieved October 31, 2014.
  24. ^ Page Module:Citation/CS1/styles.css has no content."Orbital Sciences signs contract for new Antares engines". Spaceflight Now. January 22, 2015. Retrieved June 27, 2017.
  25. ^ Page Module:Citation/CS1/styles.css has no content.Morring, Frank Jr. (December 16, 2014). "Antares Upgrade Will Use RD-181s In Direct Buy From Energomash". Aviation Week. Archived from the original on November 29, 2020. Retrieved December 28, 2014.
  26. ^ a b Page Module:Citation/CS1/styles.css has no content.Bergin, Chris (August 7, 2015). "Cygnus set for December Atlas V ride ahead of Antares return". NASASpaceFlight.com. Retrieved August 12, 2015. LSP Vehicle Systems Engineering, Propulsion Engineering, Stress, Avionics and SMA (Safety and Mission Assurance) participated in the Antares Stage 1 CDR for the modifications necessary to integrate the RD-181 engines at both the 230 and 330 thrust levels.
  27. ^ Page Module:Citation/CS1/styles.css has no content."Orbital ATK Team on Track for Fall 2015 Cygnus Mission and Antares Return to Flight in 2016". Orbital ATK. August 12, 2015. Retrieved August 12, 2015.
  28. ^ a b Page Module:Citation/CS1/styles.css has no content."Antares Medium-class Space Launch Vehicle factsheet" (PDF). Orbital Sciences. 2014. Archived from the original (PDF) on January 14, 2015. Retrieved December 28, 2014.
  29. ^ a b c Page Module:Citation/CS1/styles.css has no content.Gebhardt, Chris (June 1, 2018). "Orbital ATK looks ahead to CRS2 Cygnus flights, Antares on the commercial market". NASASpaceFlight.com.
  30. ^ Page Module:Citation/CS1/styles.css has no content."Northrop Grumman Teams with Firefly Aerospace to Develop Antares Rocket Upgrade and New Medium Launch Vehicle". Northrop Grumman Newsroom. Retrieved August 8, 2022.
  31. ^ Page Module:Citation/CS1/styles.css has no content."Northrop Grumman and Firefly to partner on upgraded Antares". SpaceNews. August 8, 2022. Retrieved August 8, 2022.
  32. ^ a b c Page Module:Citation/CS1/styles.css has no content."Antares, Cygnus launch on final CRS1 contract flight; debuting critical new capabilities". NASASpaceFlight.com. April 17, 2019. Retrieved April 17, 2019.
  33. ^ Page Module:Citation/CS1/styles.css has no content."CASTOR 30-A Multi-use Motor". Alliant Techsystems. Archived from the original on July 14, 2014. Retrieved July 10, 2014.
  34. ^ a b Page Module:Citation/CS1/styles.css has no content.Bergin, Chris (February 22, 2012). "Space industry giants Orbital upbeat ahead of Antares debut". NASA Spaceflight. Retrieved March 29, 2012.
  35. ^ Page Module:Citation/CS1/styles.css has no content.Bergin, Chris (March 5, 2013). "CASTOR 30XL prepares for static fire ahead of providing Antares boost". NASA Spaceflight. Retrieved March 7, 2013.
  36. ^ Page Module:Citation/CS1/styles.css has no content."Antares User's Guide" (PDF). 3.0. Northrop Grumman. August 2018. TM-24022. Archived from the original (PDF) on September 6, 2018. Retrieved September 5, 2018.
  37. ^ Page Module:Citation/CS1/styles.css has no content."Antares Launch Vehicle". Applied Aerospace Structures Corporation. Archived from the original on October 24, 2014. Retrieved April 26, 2014.
  38. ^ Page Module:Citation/CS1/styles.css has no content.Warner, Cheryl; Schierholz, Stephanie (January 14, 2016). "NASA Awards International Space Station Cargo Transport Contracts". NASA. Retrieved July 6, 2017.
  39. ^ Page Module:Citation/CS1/styles.css has no content.Gebhardt, Chris (February 3, 2017). "Orbital ATK preps Cygnus flights; Antares enhancements on track for 2019". NASASpaceFlight.com. Retrieved July 6, 2017.
  40. ^ Page Module:Citation/CS1/styles.css has no content."Rocket development builds on tried and true experience for new orbital missions". June 4, 2024.
  41. ^ a b Page Module:Citation/CS1/styles.css has no content.Bergin, Chris (March 17, 2013). "Stars align for Orbital's Antares – A-One debut set for mid-April". NASASpaceFlight.com. Retrieved April 22, 2013.
  42. ^ Page Module:Citation/CS1/styles.css has no content.Clark, Stephen (April 21, 2013). "Antares test launch paves new highway to space station". Spaceflight Now. Retrieved April 22, 2013.
  43. ^ Page Module:Citation/CS1/styles.css has no content.Krebs, Gunter. "PhoneSat v2". Gunter's Space Page. Retrieved April 22, 2013.
  44. ^ Page Module:Citation/CS1/styles.css has no content.Krebs, Gunter. "PhoneSat v1". Gunter's Space Page. Retrieved April 22, 2013.
  45. ^ a b Page Module:Citation/CS1/styles.css has no content.Graham, William (April 21, 2013). "Antares conducts a flawless maiden launch". NASASpaceFlight.com. Retrieved April 22, 2013.
  46. ^ Page Module:Citation/CS1/styles.css has no content.Weil, Martin (April 21, 2013). "Wind postpones rocket launch at Wallops Flight Facility". The Washington Post.
  47. ^ Page Module:Citation/CS1/styles.css has no content.Amos, Jonathan (April 21, 2013). "Orbital's Antares rocket makes test flight". BBC News. Retrieved April 22, 2013.
  48. ^ a b Page Module:Citation/CS1/styles.css has no content."Antares explodes moments after launch". Spaceflight Now. October 28, 2014. Retrieved October 28, 2014.
  49. ^ Page Module:Citation/CS1/styles.css has no content.Queally, James; Hennigan, W. J.; Raab, Lauren (October 28, 2014). "Rocket bound for space station blows up just after liftoff". Los Angeles Times. Retrieved November 8, 2014.
  50. ^ a b Page Module:Citation/CS1/styles.css has no content."ISS Commercial Resupply Services Mission (Orb-3)". Orbital Sciences Corporation. October 30, 2014. Archived from the original on October 13, 2014. no evidence of significant damage
  51. ^ a b Page Module:Citation/CS1/styles.css has no content.Wall, Mike (October 28, 2014). "Private Orbital Sciences Rocket Explodes During Launch, NASA Cargo Lost". Space.com. Purch. Retrieved October 28, 2014.
  52. ^ Page Module:Citation/CS1/styles.css has no content.Foust, Jeff (November 21, 2014). "Virginia May Seek Federal Funds for Wallops Spaceport Repairs". SpaceNews. Retrieved November 5, 2017.
  53. ^ Page Module:Citation/CS1/styles.css has no content.Petersen, Melody (January 3, 2015). "Before explosion, NASA knew aging Soviet engines posed risks". Los Angeles Times. Archived from the original on January 4, 2015. Retrieved January 27, 2018.
  54. ^ a b National Aeronautics and Space Administration – NASA Independent Review Team Orb–3 Accident Investigation Report Executive Summary nasa.gov
  55. ^ Page Module:Citation/CS1/styles.css has no content.Clark, Stephen (October 6, 2015). "Workers complete $15 million in repairs to Antares launch pad". Spaceflight Now. Retrieved November 5, 2017.
  56. ^ Page Module:Citation/CS1/styles.css has no content.Kramer, Miriam (December 9, 2014). "Private Cargo Spacecraft Gets New Rocket Ride After Accident". Space.com. Archived from the original on October 8, 2017. Retrieved November 5, 2017.
  57. ^ Page Module:Citation/CS1/styles.css has no content.Perrotto, Trent J. (April 21, 2013). "NASA Partner Orbital Sciences Test Launches Antares Rocket" (Press release). NASA. Retrieved April 25, 2013.
  58. ^ Page Module:Citation/CS1/styles.css has no content."Antares Cold Flow Testing Begins and Antares A-ONE Gets All Dressed Up". Orbital Sciences Corporation. December 2012. Archived from the original on March 6, 2013. Retrieved March 5, 2013.
  59. ^ a b Page Module:Citation/CS1/styles.css has no content.Pearlman, Robert Z. (December 9, 2013). "Orbital names next space station freighter for late pilot-astronaut". CollectSpace.com. Retrieved December 9, 2013.
  60. ^ Page Module:Citation/CS1/styles.css has no content."Cygnus launch cargo". Spaceflight Now. September 14, 2013. Retrieved September 18, 2013.
  61. ^ Page Module:Citation/CS1/styles.css has no content.Dunn, Marcia (September 22, 2013). "Computer mishap delays space station supply ship Cygnus". The Washington Post. Retrieved September 22, 2013.
  62. ^ Page Module:Citation/CS1/styles.css has no content.Bergin, Chris (September 28, 2013). "Orbital's Cygnus successfully berthed on the ISS". NASASpaceFlight.com. Retrieved October 8, 2013.
  63. ^ Page Module:Citation/CS1/styles.css has no content.Clark, Stephen (May 6, 2013). "First flight of Cygnus cargo craft delayed to September". Spaceflight Now. Retrieved August 7, 2013.
  64. ^ Page Module:Citation/CS1/styles.css has no content."New Science, NASA Cargo Launches to Space Station Aboard Orbital-1 Mission" (Press release). NASA. January 9, 2014. Retrieved September 2, 2018.
  65. ^ Page Module:Citation/CS1/styles.css has no content.Bergin, Chris (February 22, 2012). "Space industry giants Orbital upbeat ahead of Antares debut". NASA Spaceflight. Retrieved March 29, 2012.
  66. ^ Page Module:Citation/CS1/styles.css has no content."ISS Commercial Resupply Services Mission (Orb-1)". Orbital Sciences Corporation. January 12, 2014. Archived from the original on February 8, 2014.
  67. ^ Page Module:Citation/CS1/styles.css has no content.Rawcliffe, Britt (July 11, 2014). "After delays, Orbital Sciences Corporation's Antares rocket set to launch". Spaceflight Insider. Retrieved July 11, 2014.
  68. ^ a b Page Module:Citation/CS1/styles.css has no content."Orbital-2 Mission to the International Space Station: Media Press Kit" (PDF) (Press release). NASA. July 2014. Retrieved September 2, 2018.
  69. ^ Page Module:Citation/CS1/styles.css has no content."ISS Commercial Resupply Services Mission (Orb-2)". Orbital Sciences Corporation. 2014. Archived from the original on April 7, 2014. Retrieved July 13, 2014.
  70. ^ Page Module:Citation/CS1/styles.css has no content."ISS Commercial Resupply Services Mission (Orb-3): Mission Update – October 22, 2014". Orbital Sciences Corporation. October 22, 2014. Archived from the original on October 25, 2014. Retrieved October 24, 2014.
  71. ^ Page Module:Citation/CS1/styles.css has no content."Orbital CRS-3 Mission to the International Space Station: Media Press Kit" (PDF) (Press release). NASA. October 2014. Retrieved September 2, 2018.
  72. ^ Page Module:Citation/CS1/styles.css has no content.Wilhelm, Steve (October 16, 2014). "First step toward asteroid mining: Planetary Resources set to launch test satellite". Puget Sound Business Journal. Retrieved October 19, 2014.
  73. ^ Page Module:Citation/CS1/styles.css has no content."RACE Mission". Jet Propulsion Laboratory. Archived from the original on October 19, 2014. Retrieved October 28, 2014.
  74. ^ Page Module:Citation/CS1/styles.css has no content."S.S. Alan Poindexter: Orbital ATK freighter named for late shuttle astronaut". collectSPACE. June 7, 2015.
  75. ^ Page Module:Citation/CS1/styles.css has no content."OA-5 Fact Sheet" (PDF). Orbital ATK. Archived from the original (PDF) on October 20, 2016. Retrieved October 10, 2016.
  76. ^ Page Module:Citation/CS1/styles.css has no content."Orbital ATK Team on Track for Fall 2015 Cygnus Mission and Antares Return to Flight in 2016". Orbital ATK. August 12, 2015. Retrieved August 12, 2015.
  77. ^ Page Module:Citation/CS1/styles.css has no content."Launch Manifest". Orbital Sciences Corporation. Archived from the original on December 11, 2013. Retrieved December 8, 2013.
  78. ^ Page Module:Citation/CS1/styles.css has no content."Orbital Announces Go-Forward Plan for NASA's Commercial Resupply Services Program and the Company's Antares Launch Vehicle". orbital.com. Orbital Sciences Corporation. November 5, 2014. Retrieved November 5, 2014.
  79. ^ Page Module:Citation/CS1/styles.css has no content.Clark, Stephen (October 17, 2016). "Spaceflight Now — Live coverage: Antares rocket returns to flight Monday". Spaceflight Now. Retrieved October 17, 2016.
  80. ^ Page Module:Citation/CS1/styles.css has no content."Cygnus "S.S. Gene Cernan" En-Route to Space Station after Sunday Morning Commute to Orbit". Spaceflight101.com. November 12, 2017. Archived from the original on May 18, 2022. Retrieved May 24, 2018.
  81. ^ Page Module:Citation/CS1/styles.css has no content."Overview – Orbital ATK CRS-8 Mission" (PDF) (Press release). NASA. 2017. Retrieved September 2, 2018.
  82. ^ Page Module:Citation/CS1/styles.css has no content.Clark, Stephen (May 18, 2018). "Antares rocket rolls to Virginia launch pad, liftoff delayed to Monday". Spaceflight Now. Retrieved May 21, 2018.
  83. ^ a b Page Module:Citation/CS1/styles.css has no content."Overview: Orbital ATK CRS-9 Mission" (PDF). NASA. 2018. Retrieved May 23, 2018.
  84. ^ Page Module:Citation/CS1/styles.css has no content.Foust, Jeff (May 21, 2018). "Antares launches Cygnus cargo spacecraft to ISS". spacenews.com. Retrieved May 21, 2018.
  85. ^ Page Module:Citation/CS1/styles.css has no content."Upgraded Antares ready to launch first CRS2 NASA flight of Cygnus". NASASpaceFlight.com. November 1, 2019. Retrieved November 2, 2019.
  86. ^ a b Page Module:Citation/CS1/styles.css has no content.Gohd, Chelsea (October 2, 2020). "Antares rocket launches new astronaut toilet and more to space station for NASA". Space.com. Retrieved October 3, 2020.
  87. ^ Page Module:Citation/CS1/styles.css has no content."NASA Science, Cargo Heads to Space Station on Northrop Grumman Resupply Mission". nasa.gov. October 2, 2020. Retrieved October 3, 2020.
  88. ^ Page Module:Citation/CS1/styles.css has no content."Northrop Grumman CRS-15 Overview" (PDF). NASA. Retrieved August 11, 2021.
  89. ^ Page Module:Citation/CS1/styles.css has no content.Powers, Kelly. "Worm muscles, artificial retinas, space laptops: NASA Wallops launches rocket to ISS". Dover Post. Retrieved February 20, 2021.
  90. ^ Page Module:Citation/CS1/styles.css has no content."Overview for Northrop Grumman's 16th Commercial Resupply Mission". NASA. July 26, 2021. Archived from the original on August 10, 2021. Retrieved August 11, 2021.
  91. ^ Page Module:Citation/CS1/styles.css has no content."Overview for Northrop Grumman's 17th Commercial Resupply Mission". ISS Program Office. NASA. February 14, 2022. Archived from the original on February 14, 2022. Retrieved February 20, 2022. Public Domain This article incorporates text from this source, which is in the public domain.
  92. ^ Page Module:Citation/CS1/styles.css has no content.Navin, Joseph (November 5, 2022). "SS Sally Ride Cygnus launches to ISS on NG-18 mission". NASASpaceFlight. Retrieved November 7, 2022.
  93. ^ Page Module:Citation/CS1/styles.css has no content.Josh, Dinner (August 2, 2023). "Antares rocket makes its final launch, sending cargo to the International Space Station". space.com. Retrieved August 2, 2023.
  94. ^ Page Module:Citation/CS1/styles.css has no content."Northrop/CRS NG-22". Next Spaceflight. Retrieved May 10, 2026.
  95. ^ Page Module:Citation/CS1/styles.css has no content."Solid rocket stages and how they perform mission-precise orbit insertions". December 3, 2020. Retrieved August 1, 2023.

Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.

Template:Cygnus spaceflights Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.

Template:DMCA