West of England line
Template:Short description Script error: No such module "Distinguish". Template:DMCA Template:DMCA
Page Module:Infobox/styles.css has no content.
| West of England line | |||
|---|---|---|---|
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. Templecombe station in February 2010 | |||
| Overview | |||
| Status | Operational | ||
| Owner | Network Rail | ||
| Termini | Page Template:Plainlist/styles.css has no content. | ||
| Stations | 21 (Basingstoke to Exeter St Davids) | ||
| Service | |||
| Type | Suburban rail, Heavy rail | ||
| System | National Rail | ||
| Operator(s) | South Western Railway | ||
| Depot(s) | Salisbury TMD | ||
| Rolling stock | Class 158 "Express Sprinter" Class 159 "South Western Turbo" | ||
| Technical | |||
| Line length | Script error: No such module "ConvertIB".120 mi 77 ch (194.67 km) [Basingstoke to Exeter St Davids] 172 mi 12 ch (277.05 km) [London to Exeter St Davids via SWML] | ||
| Track length | Script error: No such module "ConvertIB". | ||
| Number of tracks | Page Template:Plainlist/styles.css has no content.
| ||
| Track gauge | 1,435 mm (Page Template:Fraction/styles.css has no content.4 ft 8+1⁄2 in) standard gauge | ||
| Minimum radius | Script error: No such module "ConvertIB". | ||
| Operating speed | Script error: No such module "ConvertIB".90 mph (140 km/h) maximum | ||
| Highest elevation | Script error: No such module "ConvertIB". | ||
| |||
Script error: No such module "Check for conflicting parameters".
Template:West of England Main Line The West of England line (also known as the West of England Main Line) is a railway line from Basingstoke, Hampshire, to Exeter St Davids in Devon, England. Passenger services run between London Waterloo station and Exeter via the South West Main Line; the line intersects with the Wessex Main Line at Salisbury.
The line was constructed by the London and South Western Railway (L&SWR) and the Salisbury and Yeovil Railway between 1854 and 1860, with the L&SWR eventually gaining full operation. Although it was once a significant connection from London to Southwest England, it has declined in importance since the years following the 1963 Beeching Report. Exeter can be reached more quickly from London Paddington via the Reading–Taunton line, with this route providing the only direct route to destinations west of Exeter since 2009. However, the West of England line is still important as a freight and diversionary route.
Route
Trains between London Waterloo and Exeter run on the South West Main Line as far as Basingstoke. The West of England Line diverges at Worting Junction, a short distance west.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. North of Worting Junction, stopping services from London Waterloo and CrossCountry services to the North of England via Reading use the outer pair of tracks, while Waterloo express services use the inner pair of tracks. The inner pair of tracks are unelectrified through the junction and continue west to Salisbury and Exeter.[1]
Beyond Worting Junction, the route heads generally westwards to Salisbury, where there is a connection with the Wessex Main Line, then over the Heart of Wessex Line without a junction just before Yeovil Junction. There is a connection to the Avocet Line just before Exeter. The line passes through Exeter Central before ending at Exeter St Davids. Overall, it passes through five counties – Hampshire, Wiltshire, Dorset, Somerset and Devon.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
Network Rail splits the line into two sections: the first section from the line's start at Worting Junction to Wilton Junction (near Salisbury) is classified as "London & SE commuter", while the rest is a "secondary" route. The secondary route west of Salisbury is predominantly single track, but has three sections of double track and four passing loops.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. The double track sections and passing loops are: a loop just outside Tisbury, a loop at Gillingham, double track from Templecombe to Yeovil Junction, a loop at the former Chard Junction station, 3 miles of double track centred on Axminster, a loop at Honiton station, and double track from Pinhoe to Exeter.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
The line has a similar route to the parallel A303 road, which runs from Basingstoke to Honiton.[2]
The line's speed limit is mainly at 80 miles per hour (130 km/h) or above over its whole length from Basingstoke to Exeter.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. Speed is further limited around the junctions. The first section to Wilton Junction has a listed line speed of 50–90 mph, and the secondary section to Exeter has a line speed of mainly 85 mph with parts at 70 mph.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
There are two depots on the line operated by the South Western Railway. The traincare depot is at Salisbury, while the traincrew depot is at Yeovil Junction.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
History
Construction
The line was constructed in stages completed between 1854 and 1860, and eventually was wholly operated by the London and South Western Railway (L&SWR).Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. There had been plans to construct a direct line from London to Exeter since the beginning of railways. Although the Great Western Railway (GWR) were the first to construct a line to Exeter in 1844, this went via Bristol.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. The L&SWR had opened a line to Salisbury on 1 March 1847, which ran via Southampton.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. They had agreed with the Southampton & Dorchester Railway that they would not construct any lines west of Salisbury or Dorchester, but changed their stance following the opening of the GWR route.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. The section from Basingstoke to Andover opened on 3 July 1854, followed by an extension to Salisbury on 1 May 1857.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
The section from Salisbury to Yeovil was originally constructed by the Salisbury and Yeovil Railway.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. The first section to open was Salisbury to Gillingham on 2 May 1859, followed by extensions to Sherborne on 7 May 1860, Yeovil Junction on 1 June, and Exeter Central on 19 July.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. To allow an easy transfer at Salisbury, the original station at Milford was closed and rerouted to its current site at Fisherton at the same time as the Gillingham extension.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. The section from Yeovil to Exeter involved a lengthy tunnel near Honiton, constructed from 11 million bricks. The tunnel has since been closed on occasion because of drainage problems owing to nearby natural springs.[3] A branch to Yeovil Town, connecting with the GWR services, opened on 11 September 1866.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. A further extension of the mainline to Exeter St Davids opened on 1 February 1862.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
Later history

The line was upgraded from single to double track in stages during the 1860s; most bridges had been built to accommodate two tracks. This work was complete by 1 July 1870.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. Further branch lines opened to Exmouth on 1 May 1861, Chard on 11 September 1866, Seaton on 16 March 1868, Sidmouth on 6 July 1874, and Lyme Regis on 24 August 1903.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
Worting Junction was originally constructed as a flat junction[4] which required that down trains for the West of England line and up trains from Southampton crossed each other's paths. This was not a great concern at the time, but as traffic and speeds increased the junction became a bottleneck. To relieve this, a flying junction was provided to the south, opening on 30 May 1897.[5] This changed the arrangement so that up trains from the Southampton line now crossed over the up and down Salisbury lines on Battledown Flyover, west of Basingstoke.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
A rail motor service was introduced between Exeter and Honiton in 1906, but was soon cancelled.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. The Amesbury and Military Camp Light Railway branch from Grateley opened in 1 June 1906.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
The GWR line from Chippenham and Bristol Temple Meads via Westbury had its own terminus at Salisbury from where the L&SWR continued the route southeast towards Southampton. The two stations were amalgamated on 12 September 1932 when passenger trains were diverted into the Southern Railway station. This route is known now as the Wessex Main Line.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
Following nationalisation in 1948, the line initially saw heavy investment from British Railways, with services including the Atlantic Express service from Waterloo to various points past Exeter,Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. and a regular service from Brighton to Plymouth.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. The line speed past Salisbury was increased to 85 miles per hour (137 km/h) in 1949.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
The section west of Salisbury was transferred from the Southern Region of British Railways to the Western Region in 1963, which led it into direct comparisons with the Paddington–Taunton–Exeter service and concerns over its viability.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. The Beeching Report of 1963 identified duplication of routes from London to the West Country, and concluded the West of England line was secondary, as it carried 20% of the overall traffic between London and Exeter compared to the route via Paddington and the Reading–Taunton line.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. A complete closure west of Salisbury was rumoured. Instead, the proposal was to reduce long sections west of Salisbury to single track, close minor stations, and reduce services to one train every two hours.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.[6] All branch lines between Salisbury and Exeter had closed by 1967, including Chard on 10 September 1962, Lyme Regis on 29 November 1965 and Yeovil on 3 October 1966,Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. and all through services beyond Exeter had been withdrawn by 1968.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. The proposal was toned down after concerns with overcrowding, and a 10-mile (16 km) section between Templecombe and Yeovil Junction was retained as double track.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. A passing loop at Tisbury opened on 24 March 1986.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
The line has never been considered for electrification, and consequently all rolling stock has been steam, then diesel.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. Pinhoe station re-opened in 1982, followed by Templecombe a year later.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. By the 1980s, the line was clearly in decline, with limited traffic and unsatisfactory locomotive stock. However, services began to improve after the introduction of British Rail Class 159s in 1993.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. Through services began running beyond Exeter again in 1992, and continued until 2009.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. Additional Class 159s and British Rail Class 158s were introduced from 2006, having previously been used on the TransPennine Express route.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
The 2006 Network Rail South West Main Line Route Utilisation Strategy recommended building additional sections of double track so the timetable could be improved,[7] however Network Rail's 2008 Route Plan did not mention this.[8] An additional passing loop was constructed at Axminster in 2009, allowing hourly services to run between Waterloo and Exeter St David's.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
Current operations
Passengers
Passenger services are operated by South Western Railway using Class 158 and Class 159 trains.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. There are generally two trains each hour between London Waterloo and Salisbury, one of which continues to and from Exeter St Davids. A few Salisbury services continue to and from Yeovil Junction. Journey time between London and Exeter is under 3 hours and 30 minutes; between London and Salisbury takes about 1 hour 30 minutes.[9]
Freight
There is a freight branch line to the Ministry of Defence site at Ludgershall. Other freight from Southampton Docks is sometimes routed over the eastern part of this route when the South Western Main Line through Winchester is closed.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
The line carried a significant amount of milk from Chard until March 1980.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
Future
There have been proposals to electrify the line.[10] In 2025, train operator South Western Railway estimated that their Class 159 and 158s would reach the end of their life by 2030. As an alternative to replacement by diesels or electrification, a proposal has been made for battery-operated trains with intermittent third rail charging points.[2]
Following the 2024 general election, the incoming Labour government cancelled the A303 Stonehenge road tunnel; study group Greengauge 21 recommended improving the West of England line instead. The single track sections have particularly affected growth to the east of Exeter, and re-dualling the track between there and Axminster would allow a Devon Metro service to operate, with more frequent short-distance trains.[2] In reply to a written question in Parliament in May 2025, Lilian Greenwood, the Parliamentary Under-Secretary of State for Transport, responded that there were no plans to improve the West of England line at that time.[11]
See also
- Exeter to Plymouth railway of the LSWR
- Rail services in the West of England
- Southern Railway routes west of Salisbury
References
Page Template:Reflist/styles.css has no content.
- ^ Page Module:Citation/CS1/styles.css has no content.Padgett, David; Kelman, Leanne (November 2019) [1994]. Munsey, Myles (ed.). Railway Track Diagrams 5: Southern & TfL (4th ed.). Frome: Trackmaps. map 30B. ISBN 978-1-9996271-2-6.
- ^ a b c Page Module:Citation/CS1/styles.css has no content."Railway sorely in need of investment, study finds". BBC News. 17 January 2025. Retrieved 25 June 2025.
- ^ Page Module:Citation/CS1/styles.css has no content."West of England line reopens after important renewal work". Network Rail. 25 November 2024. Retrieved 26 June 2025.
- ^ Page Module:Citation/CS1/styles.css has no content.The Railway Handbook ... Railway Publishing Company Limited. 1945. p. 16.
... the railway to Southampton at Worting Junction, near Basingstoke, and was opened to Andover in 1854, to Salisbury in ...
- ^ Page Module:Citation/CS1/styles.css has no content.Verrall, Charlie (2017). Steam Around Basingstoke and Salisbury. Amberley. p. 20. ISBN 978-1-445-66393-7.
- ^ Page Module:Citation/CS1/styles.css has no content.Sedgwick, Cathy (2021). "Dinton Railway Station" (PDF). Wiltshire OPC Project. Retrieved 24 February 2022.
- ^ Page Module:Citation/CS1/styles.css has no content.South West Main Line Route Utilisation Strategy (PDF). Network Rail (Report). March 2006. pp. 18, 20. Retrieved 10 April 2026.
- ^ Page Module:Citation/CS1/styles.css has no content."Route 4: Wessex Routes" (PDF). Route Plans. Network Rail. 2008. Archived from the original (PDF) on 7 June 2011. Retrieved 6 August 2008.
- ^ Page Module:Citation/CS1/styles.css has no content."20: Exeter, Yeovil, Salisbury to London Waterloo (17 May until 19 September 2026)" (PDF). Timetables. South Western Railway. Retrieved 5 May 2026.
- ^ Page Module:Citation/CS1/styles.css has no content."Discontinuous third rail idea for West of England Line". Rail Magazine. 26 September 2024. Retrieved 25 June 2025.
- ^ Page Module:Citation/CS1/styles.css has no content."West of England Line: Standards". Hansard. 19 May 2025. Retrieved 27 June 2025.
Bibliography
Page Template:Refbegin/styles.css has no content.
- Page Module:Citation/CS1/styles.css has no content."Route Plan C Wessex" (PDF). Network Rail. March 2010. Archived from the original (PDF) on 2 April 2015. Retrieved 11 March 2015.
- Page Module:Citation/CS1/styles.css has no content.Network Rail (2020). "West of England Line Study 2020" (PDF). Line Study. Archived from the original (PDF) on 31 January 2021.
{{cite web}}: CS1 maint: ref duplicates default (link) - Page Module:Citation/CS1/styles.css has no content.White, H.P. (1982) [1961]. Thomas, David St John; Patmore, J. Allan (eds.). A Regional History of the Railways of Great Britain, volume 2: Southern England. David & Charles. ISBN 978-0-715-34733-1.
- Page Module:Citation/CS1/styles.css has no content.Thomas, David St John (1981). A Regional History of the Railways of Great Britain, volume 1: The West Country. David & Charles. ISBN 978-0-715-38210-3.
- Page Module:Citation/CS1/styles.css has no content.Maggs, Colin (2017). A History of the Southern Railway. Amberley. ISBN 978-1-445-65272-6.
- Page Module:Citation/CS1/styles.css has no content.Reed, David (2022). Trains in the Southern Region: The Late 1960s and 1970s. Amberley. ISBN 978-1-398-11016-8.
- Page Module:Citation/CS1/styles.css has no content.R.V.J. Butt (1995). The Directory of Railway Stations. Sparkford: Patrick Stephens. ISBN 9781852605087.
- Page Module:Citation/CS1/styles.css has no content.Quick, Michael (2000). Railway Passenger Stations in Great Britain : A chronology (PDF). Railway and Canal Historical Society. Archived from the original (PDF) on 4 July 2021.
- Page Module:Citation/CS1/styles.css has no content.J.H. Lucking (1968). Railways of Dorset: an outline of their establishment, development and progress from 1825. Lichfield: Railway Correspondence and Travel Society. OCLC 31916.
Further reading
- Page Module:Citation/CS1/styles.css has no content.Network Rail. "Route 3 – South West Main Line" (PDF). Business Plan 2006. Archived from the original (PDF) on 6 February 2012.
- Page Module:Citation/CS1/styles.css has no content.Network Rail. "Route 12 – Reading to Penzance" (PDF). Business Plan 2006. Archived from the original (PDF) on 26 September 2006.
- Page Module:Citation/CS1/styles.css has no content.Johnston, Howard (22 April – 5 May 1998). "Unlocking the potential to Exeter". RAIL. No. 329. EMAP Apex Publications. pp. 20–24. ISSN 0953-4563. OCLC 49953699.
External links
- Page Template:Sister-inline/styles.css has no content.Script error: No such module "Sister project logo". Media related to Script error: No such module "Commons link". at Wikimedia Commons
- I visited every station on the West of England line – Jen on the Move, via YouTube
Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.