Bittern Line
Page Module:Message box/ambox.css has no content.
This article needs additional citations for verification. (March 2008) |
Page Module:Infobox/styles.css has no content.
| Bittern Line | |||
|---|---|---|---|
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. | |||
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. | |||
| Overview | |||
| Status | Operational | ||
| Owner | Network Rail | ||
| Locale | Norfolk, England | ||
| Termini | Page Template:Plainlist/styles.css has no content. | ||
| Stations | 10 | ||
| Service | |||
| Type | Heavy rail | ||
| System | National Rail | ||
| Operator(s) | Greater Anglia | ||
| Rolling stock | Class 755 | ||
| History | |||
| Opened | 1874–77 | ||
| Technical | |||
| Line length | Script error: No such module "ConvertIB".30 miles 22 chains (48.7 km) | ||
| Track length | Script error: No such module "ConvertIB". | ||
| Number of tracks | 1–2 | ||
| Character | Rural line | ||
| Track gauge | Page Template:Fraction/styles.css has no content.4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||
| Minimum radius | Script error: No such module "ConvertIB". | ||
| Operating speed | Script error: No such module "ConvertIB". | ||
| Highest elevation | Script error: No such module "ConvertIB". | ||
| |||
Script error: No such module "Check for conflicting parameters".
Page Template:Routemap/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Navbar/configuration' not found. The Bittern Line is a railway branch line in Norfolk, England, that links Norwich to Sheringham.[1] It passes through the Broads on its route to an Area of Outstanding Natural Beauty on the north Norfolk coast.[2] It is named after the bittern, a rare bird found in the reedy wetlands of Norfolk.
The line is 30 miles 22 chains (48.7 km) in length and there are 10 stations. It is part of Network Rail Strategic Route 7, SRS 07.11, and is classified as a rural line.[3]
Passenger services are operated by Greater Anglia, which also manages all of the stations.
History
The line was granted permission in 1864[4] and the first stretch was opened between Norwich and North Walsham in 1874 by the East Norfolk Railway. It was extended to Cromer by 1877 before being extended to Sheringham in 1877, using a section of the Midland and Great Northern Joint Railway line. From the early twentieth century until the end of steam services, in 1962, the Great Eastern Railway operated coastal holiday services from London Liverpool Street under names such as the Norfolk Coast Express and The Broadsman.[4]
Following the closure of the majority of the Midland and Great Northern network, the line operated as a single branch between Norwich and Melton Constable before the section between Sheringham and Melton Constable was closed in 1964.[5] The remainder of the line was listed for closure in 1967[6] but survived the proposal after being declined by the Secretary of State for Transport.[7]
The Bittern Line Partnership was set up by Norfolk County Council in 1997. and was designated a community rail line by the Department for Transport in September 2007.
The section of the line between Sheringham and Holt which was closed in the 1960s remains in use as a heritage railway line operated as the North Norfolk Railway (NNR - also known as the Poppy Line). After a period of 36 years, the link between the Bittern line and the North Norfolk Railway was reinstated in 2010 with the opening of a new level crossing at Sheringham.
Sheringham railway station was upgraded in 2019 to accommodate the new Class 755s.[8]
Stations
The following table summarises the line's 10 stations, their distance measured from Norwich, and their estimated number of passenger entries/exits in 2018/19 and 2022/23:[9] Template:Table alignment
| Station | Location | Local authority | Mileage | Passenger numbers | |
|---|---|---|---|---|---|
| 2018/19 | 2022/23[9] | ||||
| Norwich | Norwich | City of Norwich | 0 | 4,250,834 | 3,964,948 |
| Salhouse | Salhouse | Broadland | 6 | 11,778 | 14,006 |
| Hoveton & Wroxham | Hoveton/Wroxham | North Norfolk | Page Template:Fraction/styles.css has no content.8+3⁄4 | 136,414 | 124,804 |
| Worstead | Worstead | North Norfolk | Page Template:Fraction/styles.css has no content.13+1⁄4 | 25,650 | 26,816 |
| North Walsham | North Walsham | North Norfolk | 16 | 265,400 | 243,208 |
| Gunton | Thorpe Market | North Norfolk | Page Template:Fraction/styles.css has no content.19+3⁄4 | 19,188 | 28,446 |
| Roughton Road | Roughton | North Norfolk | 24 | 21,766 | 24,670 |
| Cromer | Cromer | North Norfolk | Page Template:Fraction/styles.css has no content.26+3⁄4 | 219,244 | 244,294 |
| West Runton | West Runton | North Norfolk | Page Template:Fraction/styles.css has no content.28+3⁄4 | 27,212 | 32,918 |
| Sheringham | Sheringham | North Norfolk | Page Template:Fraction/styles.css has no content.30+1⁄4 | 225,894 | 232,222 |
Services
Passenger services are operated by Greater Anglia. The typical service is one train per hour in each direction between Norwich and Sheringham. Calling patterns are varied, with some trains stopping at all stations while others omit some of the lesser-used stations along the line, such as Salhouse, Gunton and Roughton Road.
In 2019, new Class 755 bi-mode trains began to replace the previous mixture of Class 153, Class 156 and Class 170 diesel multiple units.[10]
The line is also used by freight trains which are operated by GB Railfreight. Some trains carry gas condensate from a terminal at North Walsham to Harwich International Port.
Infrastructure
The line is double-track from Norwich to Hoveton & Wroxham, where it becomes single-track with a passing loop at North Walsham, and two platforms at Cromer also allowing passing. The line is not electrified; it has a loading gauge of W8 between Norwich and Roughton Road and W6 from Roughton Road to Sheringham. The maximum speed is 75 miles per hour (121 km/h).[3]
The line was re-signalled in 2000, leading to the closure of a number of mechanical signal boxes and control moving to a panel at the Trowse Swing Bridge control room. This saw the end of one of the few remaining sections of single-track main line controlled by tokens.[citation needed] The Cromer signal box has been preserved.
Proposed developments
Rackheath station
A new station is proposed as part of the Rackheath eco-town.[11] The building of the town may also mean a short freight spur being built to transport fuel to fire an on-site power station. The plans for the settlement received approval from the government in 2009.[12]
References
Page Template:Reflist/styles.css has no content.
- ^ Page Module:Citation/CS1/styles.css has no content."Home". Bittern Line.
- ^ OS Explorer Map 252 – Norfolk Coast East. Template:ISBN
- ^ a b Page Module:Citation/CS1/styles.css has no content."Route 7 – Great Eastern" (PDF). Network Rail. Archived from the original (PDF) on 7 June 2011. Retrieved 20 May 2009.
- ^ a b Page Module:Citation/CS1/styles.css has no content.Holland, Julian; Spaven, David (2012). Britain's Scenic Railways. Fulham Palace Road, London: Times Books Group Ltd. pp. 78–81. ISBN 978-0-00-792671-8.
- ^ Proposed withdrawal of passenger services between Melton Constable – Sheringham. 1963-1964
- ^ Proposed withdrawal of passenger services between Norwich – Sheringham. 1967
- ^ Closures Railway World issue 354 November 1969 page 472
- ^ Page Module:Citation/CS1/styles.css has no content."New, longer Sheringham station platform to be installed ready for new trains -". Greater Anglia. 12 February 2019. Retrieved 28 January 2024.
- ^ a b Page Module:Citation/CS1/styles.css has no content."table-1410-passenger-entries-and-exits-and-interchanges-by-station.ods". ORR (Office of Rail and Road). 14 December 2023. Retrieved 28 January 2024.
- ^ Page Module:Citation/CS1/styles.css has no content.Anderson, Stuart (13 November 2019). "Greater Anglia's new bi-mode trains roll into service on Bittern Line". North Norfolk News. Eastern Daily Press. Archived from the original on 13 November 2019. Retrieved 14 November 2019.
- ^ Page Module:Citation/CS1/styles.css has no content."Transport". Rackheath eco-community. Archived from the original on 15 July 2009. Retrieved 16 July 2009.
- ^ Page Module:Citation/CS1/styles.css has no content."Airfield eco-town plan selected". BBC News. 16 July 2009. Retrieved 19 July 2009.
External links
Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.
Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.