Launch Control Center
Script error: No such module "about". Template:Short description
Template:Short descriptionPage Module:Infobox/styles.css has no content.
| Page Module:Infobox/styles.css has no content. | |
| <div class="skin-nightmode-reset-color" style="width:100%; font-size:110%; font-weight:bold;color: var(--color-base); background:Script error: No such module "Designation".; line-height:1.5">Launch Control Center | |
| <div style="width:100%; text-align:center; line-height:1.5;color: var(--color-base); background:Script error: No such module "Designation".;">U.S. National Register of Historic Places | |
| Script error: No such module "Designation". | |
| Script error: No such module "Designation". | |
| Script error: No such module "Designation". | |
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. LC-39 Launch Control Center | |
| Lua error in Module:Location_map at line 526: Unable to find the specified location map definition: "Module:Location map/data/Florida" does not exist. | |
| Script error: No such module "Infobox mapframe". | |
| Nearest city | Titusville, Florida |
|---|---|
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Area | 12,047 m2 |
| Built | 1967 |
| MPS | John F. Kennedy Space Center MPS |
| NRHP reference No. | 99001645[1] |
| Added to NRHP | Template:Dts |
Script error: No such module "Check for conflicting parameters".
The Rocco A. Petrone Launch Control Center (commonly known as just the Launch Control Center or LCC) is a four-story building at NASA's Kennedy Space Center on Merritt Island, Florida, used to manage launches of launch vehicles from Kennedy Space Center Launch Complex 39. Attached to the southeast corner of the Vehicle Assembly Building, the LCC contains offices; telemetry, tracking, and instrumentation equipment; and firing rooms.
LCC has conducted launches since the unmanned Apollo 4 (Apollo-Saturn 501) launch on November 9, 1967. LCC's first launch with a human crew was Apollo 8 on December 21, 1968. NASA's Space Shuttle program also used LCC. NASA has renovated the center for Space Launch System (SLS) missions, which began in 2022 with Artemis 1. In February 2022, the center was renamed after former director of launch operations Rocco A. Petrone.[2]
Firing rooms



Launch operations are supervised and controlled from several control rooms known as "firing rooms". The controllers are in control of pre-launch checks, the booster and spacecraft. Once the rocket has cleared the launch tower (usually within the first 10–15 seconds), control is switched over to the mission's mission control center (the Christopher C. Kraft Jr. Mission Control Center at the Johnson Space Center in Houston, Texas for NASA launches or SpaceX Mission Control Center in Hawthorne, California for SpaceX launches.)
Extensive renovation of Firing Room 4 was finished in 2006.[3]
Firing Room 4 was leased by SpaceX and serves as their launch control center for Launch Complex 39A until August 2023 when the company moved into its own facility just before the launch of the Crew-7 mission.[4][5]
Key personnel
Launch Director (LD)
The Launch Director is the head of the launch team, and is responsible for making the final "go" or "no go" decision for launch after polling the relevant team members. There have been eight different Space Shuttle launch directors between 1981 and 2011.[6]
Flow Director (FD)
The Flow Director is responsible for the preparation of the spacecraft for launch, and remains in the LCC in an advisory capacity.
NASA Test Director (NTD)
The NASA Test Director is responsible for all pre-launch testing, whether involving the flight crew, the orbiter, the external tank/solid rocket booster, or ground support equipment. The NTD is also responsible for the safety of all personnel on the pad after fuelling has occurred. Reports to the Launch Director.
Orbiter Test Conductor (OTC)
The Orbiter Test Conductor is in charge of all pre-flight checkout and testing of the orbiter, and manages the engineers in the firing room who monitor the orbiter's systems. OTC is an employee of a contractor rather than of NASA.
Tank/Booster Test Conductor (TBC)
Page Module:Message box/ambox.css has no content.
This section is empty. You can help by adding to it. (June 2025) |
Payload Test Conductor (PTC)
The Payload Test Conductor is responsible for the pre-flight test and checkout of payloads carried by the orbiter and manages the engineering and test teams responsible for monitoring and controlling payload ground operations. PTC is a contractor member of the Space Shuttle Team.
Launch Processing System Coordinator (LPS)
The LPS Coordinator monitors and oversees the LPS System; specifically, the desired launch rate, Space Shuttle stacking (assembly), and all safety requirements. This is made possible by the Launch Processing System, or LPS — a highly automated, computer-controlled system that oversees the entire checkout and launch process.[7]
Support Test Manager (STM)
Page Module:Message box/ambox.css has no content.
This section is empty. You can help by adding to it. (June 2025) |
Safety Console Coordinator (SAFETY)
Page Module:Message box/ambox.css has no content.
This section is empty. You can help by adding to it. (June 2025) |
Shuttle Project Engineer (SPE)
Page Module:Message box/ambox.css has no content.
This section is empty. You can help by adding to it. (June 2025) |
Landing and Recovery Director (LRD)
Page Module:Message box/ambox.css has no content.
This section is empty. You can help by adding to it. (June 2025) |
No Landing and Recovery Director (NLRD)
Page Module:Message box/ambox.css has no content.
This section is empty. You can help by adding to it. (June 2025) |
Superintendent of Range Operations (SRO)
The Superintendent of Range Operations ensures that all tracking and communications systems are ready to support the launch operation as well as ensuring that downrange airspace and splashdown areas remain clear for launch, and monitors weather near the launch site.
Ground Launch Sequencer Engineer (CGLS)
The Ground Launch Sequencer Engineer is responsible for monitoring the operation of the automated Ground Launch Sequencer system, which controls the countdown from T−9 minutes until launch. After this point through to T−31 seconds, they are in charge of implementing a manual hold if necessary. After T−31 seconds only an automatic cutoff is available. The automatic cutoff recycles the countdown clock to T−20 minutes. Usually this will extend the launch time beyond the launch window causing a scrub and a 24-hour turnaround.
Gallery
-
Interior of the recently renovated firing room 1 in 2018.
Script error: No such module "wide image".
See also
References
Page Template:Reflist/styles.css has no content.
- ^ Page Module:Citation/CS1/styles.css has no content."National Register Information System". National Register of Historic Places. National Park Service. July 9, 2010.
- ^ Page Module:Citation/CS1/styles.css has no content.Cawley, James (22 February 2022). "NASA Kennedy's Control Center Named for Apollo-Era Launch Director". NASA (Press release). Retrieved 3 April 2022.
- ^ Page Module:Citation/CS1/styles.css has no content."Firing Rooms at Kennedy Space Center" (PDF). 2019-09-24.
- ^ Page Module:Citation/CS1/styles.css has no content."NASA Astronauts Launch from America in Historic Test Flight of SpaceX Crew Dragon" (Press release). NASA. May 30, 2020. Retrieved June 1, 2020.
- ^ Script error: No such module "cite tweet".
- ^ Page Module:Citation/CS1/styles.css has no content."History of Space Shuttle Launch Directors" (PDF). NASA. Retrieved November 7, 2022.
- ^ Page Module:Citation/CS1/styles.css has no content."NASA: KSC Launch Control Center". Archived from the original on 2020-09-24. Retrieved 2009-08-12.
Sources
- Launch Control Center Script error: No such module "webarchive".
- Launch Control Center Script error: No such module "webarchive". Main page.
- Launch Team Script error: No such module "webarchive".
External links
Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.
- History of the Firing Rooms at the Launch Control Center
- Floor plan layout of the Firing Rooms at the Launch Control Center
- New Launch Control Room Ready for STS-121 Liftoff Script error: No such module "webarchive".
- KSC Launch Processing System Script error: No such module "webarchive".
Template:Kennedy Space Center Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Template:DMCA