Transwa
Template:Short description Script error: No such module "Unsubst". Script error: No such module "Infobox".Script error: No such module "Check for unknown parameters".
Transwa is Western Australia's regional public transport provider, linking 240 destinations, from Kalbarri in the north to Augusta in the south west to Esperance in the south east.
The Transwa system provides transport between Perth and the major regional towns of Bunbury, Kalgoorlie, Northam, Geraldton and Albany.
Transwa is a part of the Public Transport Authority and was launched on 28 May 2003, replacing the former Western Australian Government Railways Commission.
Services


Rail services
Transwa operate four rail services:
- Australind: Perth to Bunbury[1]
- AvonLink: Midland to Northam[2]
- MerredinLink: East Perth to Merredin[2]
- The Prospector: East Perth to Kalgoorlie[3]
Coach services
In 2003/04, Transwa introduced 21 Volgren bodied Scania K124EB coaches aimed at revitalising the country coach fleet, which travel to many destinations across southern Western Australia including Albany, Augusta, Pemberton, Esperance, Geraldton, Kalbarri and Meekatharra. In 2015, an order was placed for 23 Irizar i6 3700-bodied Volvo B11R coaches to replace the Scanias.[4]
There are 17 routes:[5]
- GE1: Perth to Esperance via Jerramungup/Dumbleyung
- GE2: Perth to Esperance via Kulin/Hyden
- GE3: Kalgoorlie to Esperance
- GE4: Albany to Hopetoun via Ravensthorpe
- GS1: Perth to Albany via Williams/Kojonup
- GS2: Perth to Albany/Gnowangerup/Katanning via Northam/Narrogin
- GS3: Bunbury to Albany via Walpole
- N1: Perth to Geraldton/Kalbarri via Eneabba
- N2: Perth to Geraldton via Moora/Kalbarri
- N3: Perth to Geraldton via Northam/Mullewa
- N4: Geraldton to Meekatharra
- N5: Perth to Geraldton via Jurien Bay
- SW1: Perth to Augusta/Pemberton via Bunbury
- SW2: Perth to Pemberton via Bunbury and Donnybrook
- SW3: Perth to Pemberton via Bunbury, Collie, Boyup Brook and Bridgetown
- SW4: Bunbury to Boyup Brook via Brunswick and Collie
- SW5: Perth to Collie via Bunbury
Fleet
Railcars
| Class | Image | Manufacturer | Entered service | Number built | Track gauge (mm) | Top speed (km/h) | Service(s) | Notes |
|---|---|---|---|---|---|---|---|---|
| ADP/ADQ | Comeng | 1987 | 5 | 1,067Script error: No such module "string".narrow gauge | 110 | Australind | To be replaced by 12 Alstom-built railcars | |
| WDA/WDB/WDC | United Goninan | 2004 | 7 | 1,435Script error: No such module "string".standard gauge | 160 | Prospector | ||
| WEA/WEB | 2005 | 2 | AvonLink MerredinLink |
Coaches
- 23 Volvo B11R coaches[6]
Ridership
| Service | Ridership[7] | |||||
|---|---|---|---|---|---|---|
| 2024-25[8] | 2023-24 | 2022-23[9] | 2021–22 | 2020–21 | 2019–20 | |
| Road coach | 183,783 | 178,292 | 168,689 | 132,944 | 143,348 | 149,638 |
| The Prospector | 82,601 | 81,713 | 77,926 | 68,497 | 75,781 | 69,843 |
| Australind | 47,413 | 63,041 | 77,810 | 60,507 | 62,149 | 70,973 |
| AvonLink | 9,400 | 8,877 | 7,480 | 7,057 | 6,520 | 7,542 |
| MerredinLink | 8,127 | 7,696 | 7,009 | 6,039 | 6,351 | 5,902 |
See also
References
Page Template:Reflist/styles.css has no content.
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ New road coaches for regional passengers Script error: No such module "webarchive". Government of Western Australia 16 June 2015
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
Script error: No such module "Check for unknown parameters".
External links
Script error: No such module "Navbox".
Template:Public Transport Authority of Western Australia railway stations Script error: No such module "Authority control".