Anthony Dam
Template:Short description Template:DMCA Template:DMCA Script error: No such module "about".
Script error: No such module "Type in location".Page Module:Infobox/styles.css has no content.
| Anthony Dam | |
|---|---|
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. | |
| Lua error in Module:Location_map at line 526: Unable to find the specified location map definition: "Module:Location map/data/Australia Tasmania" does not exist. | |
| Script error: No such module "Infobox mapframe". | |
| Country | Australia |
| Location | Western Tasmania |
| Coordinates | Lua error: callParserFunction: function "#coordinates" was not found. |
| Purpose | Power |
| Status | Operational |
| Opening date | Script error: No such module "Date time". |
| OwnerTemplate:Pluralize from text | Hydro Tasmania |
| Dam and spillways | |
| Type of dam | Rock-fill dam |
| Impounds | Anthony River |
| Height | Template:Cvt |
| Length | Template:Cvt |
| Dam volume | Template:Cvt |
| Spillways | 1 |
| Spillway type | Uncontrolled |
| Spillway capacity | Template:Cvt |
| Reservoir | |
| Creates | Lake Plimsoll |
| Total capacity | Template:Cvt |
| Catchment area | Template:Cvt |
| Surface area | Template:Cvt |
| Normal elevation | Template:Cvt Template:AHD |
| Tribute Power Station | |
| Coordinates | Lua error: callParserFunction: function "#coordinates" was not found. |
| OperatorTemplate:Pluralize from text | Hydro Tasmania |
| Commission date | Script error: No such module "Date time". |
| Type | Conventional |
| Hydraulic head | Template:Cvt |
| Turbines | 1 x Template:Cvt Fuji Francis-type |
| Installed capacity | Template:Cvt |
| Capacity factor | 0.9 |
| Annual generation | Template:Cvt |
| Website hydro.com.au | |
| [1] | |
Expression error: Unexpected < operatorScript error: No such module "Check for conflicting parameters".
The Anthony Dam is a concrete-faced rock-fill embankment dam across the Anthony River, located in the West Coast region of Tasmania, Australia. Completed in 1993, the resultant reservoir, Lake Plimsoll, was established for the purpose of generation of hydroelectricity via the below-ground Tribute Power Station, a conventional hydroelectric power station. The dam, its reservoir, and the power station are owned and operated by Hydro Tasmania.
Dam and reservoir overview
The concrete-face rockfill dam wall is 40 metres (130 ft) high and 124 metres (407 ft) long. When full, Lake Plimsoll has capacity of 36.18 gigalitres (29,330 acre⋅ft) and covers 38.4 hectares (95 acres), drawn from a catchment area of 37 square kilometres (14 sq mi). The uncontrolled spillway has a flow capacity of 227 cubic metres per second (8,000 cu ft/s).[1]
Located adjacent to the main concrete-faced dam is the off-stream Anthony Levee, an earth core rock-fill saddle embankment that is 23 metres (75 ft) high and 95 metres (312 ft) long. The levee also impounds Lake Plimsoll.[1]
Hydroelectric power station
The Tribute Power Station is part of the Anthony Power Development scheme (which is part of the Pieman Power Development scheme). The proposed Anthony scheme comprised four hydroelectric power stations and five dams. However, due to political and legal considerations due to the Franklin Dam controversy, not all the dams or power stations were completed.[2][3]
The Tribute Power Station is the first station in the scheme, being the highest upstream, yet the most-recent major hydro-electric power development completed in Tasmania.[4] Located underground within the main dam wall, the power station receives water from the lake via a 7-kilometre (4.3 mi) headrace tunnel.[5]
The power station was commissioned in 1994 by the Hydro Electric Corporation (TAS), in the aftermath of the Franklin Dam controversy, and the station has one Fuji Francis-type turbine, with a generating capacity of 84 megawatts (113,000 hp) of electricity. The station output, estimated to be 265 gigawatt-hours (950 TJ) annually,[1] is fed to TasNetworks' transmission grid via a 13.8 kV/220 kV Fuji surface generator transformer to the outdoor switchyard.[6]
Announced in 2008, the 1,000 GWH Project resulted in upgrades to component parts of existing superstructure operated by Hydro Tasmania.[7][8][9]
See also
Page Template:Stack/styles.css has no content.
References
Page Template:Reflist/styles.css has no content.
- ^ a b c d Page Module:Citation/CS1/styles.css has no content."Register of Large Dams Australia-2015" (Excel. Requires download. Rows 5-6). ANCOLD. January 2022. Retrieved 5 March 2026.
- ^ Page Module:Citation/CS1/styles.css has no content.Environmental plan: Hydro-Electric Commission Tasmania, Anthony Power Development. Natural Systems Research. 1984. ISBN 978-0-7246-1209-3.
- ^ Page Module:Citation/CS1/styles.css has no content.Tasmania. Hydro-Electric Commission. Survey Section; Tasmania. Hydro-Electric Commission. Report on the Anthony Power Development and the King River Power Development (1983), Anthony power development and the King River power development, Hydro-Electric Commission], retrieved 23 February 2015
- ^ Page Module:Citation/CS1/styles.css has no content."Anthony Power Development". Australian Year Book (87). Australian Bureau of Statistics: 552. 1995.
- ^ Page Module:Citation/CS1/styles.css has no content."Pieman". Energy. Hydro Tasmania. Retrieved 4 July 2015.
- ^ Page Module:Citation/CS1/styles.css has no content."Tribute Power Station: Technical fact sheet" (PDF). Mersey-Forth Catchment. Hydro Tasmania. Archived from the original (PDF) on 24 September 2015. Retrieved 4 July 2015.
- ^ Page Module:Citation/CS1/styles.css has no content."Australia utility to upgrade hydro system to add 1000 GWh". Hydroworld. 2008.
- ^ Page Module:Citation/CS1/styles.css has no content."Carbon neutral target part response climate change" (Press release). Hydro Tasmania. May 2008. Archived from the original on 21 February 2011. Retrieved 2 January 2011.
- ^ Page Module:Citation/CS1/styles.css has no content."Our performance". Annual Report. Hydro Tasmania. 2009. p. 2. Archived from the original on 21 February 2011. Retrieved 2 January 2011.
External links
- Page Module:Citation/CS1/styles.css has no content."Pieman Sustainability Review: Information review of the Anthony-Pieman hydropower scheme" (PDF). Hydro Tasmania. February 2015. Archived from the original (PDF) on 6 July 2015.
Template:Dams in Tasmania Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.