Cairo Metro Line 1

From Wikipedia, the free encyclopedia

Template:Short description

Page Module:Infobox/styles.css has no content.

Line 1
New Marg - Helwan
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
Mar Girgis station
Overview
Native nameالخط الاول
StatusOperational
OwnerNational Authority for Tunnels (Egyptian state)[1]
LocaleCairo
TerminiPage Template:Plainlist/styles.css has no content.
Stations35[2]
Service
TypeRapid transit
SystemCairo Metro
Operator(s)Cairo Metro - The Egyptian Co. for Metro Management & Operation[3]
Daily ridership1.3 million (FY 2009/2010)[4]
History
Opened1987; 39 years ago (1987)[5]
Last extension1999
Technical
Line lengthScript error: No such module "ConvertIB".44.3 km (27.53 mi)[6]
Track lengthScript error: No such module "ConvertIB".
CharacterMixed Underground and At-grade street running
Track gauge1,435 mm (Page Template:Fraction/styles.css has no content.4 ft 8+12 in)
Minimum radiusScript error: No such module "ConvertIB".
ElectrificationOverhead catenary
(1.5 kV DC)[7][8]
Operating speedScript error: No such module "ConvertIB".100 km/h (62 mph)
Highest elevationScript error: No such module "ConvertIB".
Route map
Template:Cairo Metro Line 1

Script error: No such module "Check for conflicting parameters".

Cairo Metro Line 1 is the first line of the Cairo Metro in Cairo, Egypt. It is the first metro system in Africa and the Middle East.[9] It was constructed in 1987 and connects Helwan with El Marg, stopping at 35 stations. Line 1, sometimes called the French-built line or simply the French line has a total length of 44.3 kilometres (27.5 mi) with 4.7 kilometres (2.9 mi) of it being underground[2] and has trains that run with 3 units (9 cars), which have a frequency of 2.5 minutes and a maximum speed of 100 km/h (62 mph).[10] The line can carry 60,000 passengers per hour in each direction.[11]

Costs

File:Cairo Metro Line 2 Maadi Jan-2006.jpg
Train of Line 1 of Cairo Metro travelling at high speed between stations Dar El Salam and El Zahraa in Southern Cairo.

The Construction of the project started in 1982 after the French government agreed on giving Egypt the necessary loan. The first New Marg - Helwan line costs 1107 million Francs which were converted into Egyptian currency and divided into multiple stages.[12] The total cost of the first stage from Helwan to Ramsis is Template:EGP divided into the following:

  1. Template:EGP for the tunnel between Sayeda Zeinab and Ramsis Square with a length of 4.7 kilometres (2.9 mi) .[12]
  2. Template:EGP for the movement of 60 km different structures and the improvement of the older railways.[13]
  3. Template:EGP for the creation of a station in Dar El Salam.[13]

The second stage cost in total Template:EGP and connected the (Laymoun Bridge-Marg) railway with the metro.[13] Additional costs were made available as requested by the ministry of transportation:

  1. Template:EGP for completing the (Ramsis-Marg) line.[13]
  2. Template:EGP for the third stage of the (Helwan-Marg) line.[13]
  3. Template:EGP for the (Shubra el Kheima-Ramsis-El Tahrir) line[13]
  4. Template:EGP for the preparation study of the second line Imbaba-El Darasa[13]
File:Alstom Metropolis Cairo Metro.jpg
The first Metropolis train operating on the first line of the Greater Cairo Metro (taken during the trial run, May 2025 )

Construction

The construction of the Helwan-El Marg line was in two stages. The first stage was from Helwan to Sayeda Zeinab and included a tunnel from Helwan to Ramses Square. First the line from Helwan to Sayeda Zeinab, which is 24 kilometres (15 mi) long had the following construction works:

  1. The isolation of the existing railways and the construction of 9 car bridges and 21 people bridges.[14]
  2. The construction of 17 rail lane switcher.[14]
  3. The renovation of the existing railways.[14]
  4. The production of 882 kilometres (548 mi) of cables which satisfy the needs of the rail way from Helwan to Sayeda Zeinab.[15]

Second the line from Helwan to Ramses Square, which would be a subterranean and is 4.5 kilometres (2.8 mi) long. It includes five subterranean stations after the Sayeda Zeinab station:

The Construction of this line consumed the following resources:

  1. 117,000 cubic metres (153,000 cu yd) of concrete works.[15]
  2. 334,550 cubic metres (437,570 cu yd) of digging works.[15]
  3. 3900 concrete walls[15]
  4. 3,800 metres (12,500 ft) other digging works.[15]

In 1987 the line from Helwan to Ramses Square was finished and opened for the public.[16] It had a total length of 28.5 kilometres (17.7 mi).

The second stage of the Helwan El Marg line included the construction of a line from Ramses Square to El marg, which would be 14 kilometres (8.7 mi) long.[16] The operation of the line was aimed for 1988,[16] but due to some difficulties it started operation in 1989.[10] The second stage included also:

  1. The conversion of the Marg line to an electric line.[16]
  2. The acquisition of 48 new units, which would make 100 units available for operation.[16]
  3. The improvement of a workstation to provide maintenance works for 204 Units.[16]
  4. The construction of a 220 kilo-Volt power generator, to provide electricity for the future lines.[16]

Connections

To other Metro lines

Line 1 connects to Line 2 at Al-Shohadaa and Sadat stations and with Line 3 at Nasser station. It will connect to Line 4 at El Malek El Saleh station.

To other forms of transit

Shohadaa Station is immediately next to Ramses Station, providing access to Egyptian National Railways long-haul and short-haul domestic passenger service. Cairo Transport Authority buses and private microbus services are also nearby.

Access to Cairo International Airport is expected via transfer to Line 3 upon completion of Phase 4 in early 2020.[17]

Driving Simulator

A new train driving simulator integrated in Cairo Metro's training center dedicated for Line 1 drivers, which was provided by Transurb Technirail that won the international tender issued by Cairo Metro in December 2011.[18]

Transurb Technirail will provide Cairo Metro with a driving simulator and a computer-assisted learning area to train Line 1 drivers, improving their driving skills and to train them on the elementary functions of the rolling stock and on how to handle malfunctions.[18]

See also

References

Page Template:Reflist/styles.css has no content.

  1. ^ Page Module:Citation/CS1/styles.css has no content."TWINNING PROJECT FICHE - Assistance to the Egyptian Metro Company (ECM) in Reforming Railway Safety Regulations, Procedures and Practices" (PDF). Retrieved 4 August 2014.
  2. ^ a b Page Module:Citation/CS1/styles.css has no content."Line 1". National Authority for Tunnels. Archived from the original on 24 October 2018. Retrieved 24 May 2014.
  3. ^ Page Module:Citation/CS1/styles.css has no content."About Company". Cairo Metro. Archived from the original on 17 August 2014. Retrieved 31 July 2014.
  4. ^ Page Module:Citation/CS1/styles.css has no content."The Development of Passenger Traffic for The Two metro lines since inauguration (the first 87/88, the second 96/97) Until 2009/2010" (in Arabic). Cairo Metro. Archived from the original on 2012-03-23. Retrieved 2014-08-04.{{cite web}}: CS1 maint: unrecognized language (link)
  5. ^ Page Module:Citation/CS1/styles.css has no content."Cairo". metrobits.org. Retrieved 8 August 2014.
  6. ^ Page Module:Citation/CS1/styles.css has no content."First Line Working". Cairo Metro The Egyptian Co. for Metro Management and Operation. Archived from the original on 3 May 2015. Retrieved 24 May 2014.
  7. ^ Page Module:Citation/CS1/styles.css has no content.Barrow, Keith (14 March 2014). "Cairo to order new trains for metro Line 1". International Railway Journal. Simmons-Boardman Publishing Inc. Retrieved 23 January 2015.
  8. ^ Page Module:Citation/CS1/styles.css has no content."Cairo Metro Tender for New Rolling Stock". Mena Rail Post. 16 March 2014. Archived from the original on 2015-01-23. Retrieved 23 January 2015.
  9. ^ Page Module:Citation/CS1/styles.css has no content."Metro Line 1′s 26th Anniversary". Egyptian Railways Diwan. Archived from the original on 2013-10-05. Retrieved 4 August 2014.
  10. ^ a b Page Module:Citation/CS1/styles.css has no content."Greater Cairo Metro Network". Egyptian Tunneling Society. 2007-04-15. Retrieved 2008-10-20.
  11. ^ Metro Al Anfaq 32
  12. ^ a b Metro Al Anfaq 22
  13. ^ a b c d e f g Metro Al Anfaq 23
  14. ^ a b c Metro Al Anfaq 29
  15. ^ a b c d e Metro Al Anfaq 30
  16. ^ a b c d e f g Metro Al Anfaq 31
  17. ^ Page Module:Citation/CS1/styles.css has no content."علن موعد انتهاء محطات المرحلة الرابعة بالخط الثالث للمترو". Masrawy. 24 July 2019. Retrieved 7 July 2023.
  18. ^ a b Page Module:Citation/CS1/styles.css has no content."Transurb Technirail Wins Contract to Develop a Driving Simulator for Cairo Metro in Egypt". railway-technology.com. Retrieved 8 August 2014.

Works cited

Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.