Changyon Line
Page Module:Infobox/styles.css has no content.
| Changyŏn Line | |||
|---|---|---|---|
| Overview | |||
| Native name | 장연선(長淵線) | ||
| Status | Operational | ||
| Owner | Chosen Railway (1937–1944) Chosen Government Railway (1944-1945) Korean State Railway (since 1945) | ||
| Locale | South Hwanghae | ||
| Termini | Page Template:Plainlist/styles.css has no content. | ||
| Stations | 4 | ||
| Service | |||
| Type | Heavy rail, Passenger rail Regional rail | ||
| Operator(s) | Korean State Railway | ||
| History | |||
| Opened | 21 January 1937 | ||
| Technical | |||
| Line length | Script error: No such module "ConvertIB". | ||
| Track length | Script error: No such module "ConvertIB". | ||
| Number of tracks | Single track | ||
| Track gauge | 1,435 mm (Page Template:Fraction/styles.css has no content.4 ft 8+1⁄2 in) standard gauge | ||
| Old gauge | 762 mm (2 ft 6 in) | ||
| Minimum radius | Script error: No such module "ConvertIB". | ||
| Operating speed | Script error: No such module "ConvertIB". | ||
| Highest elevation | Script error: No such module "ConvertIB". | ||
| |||
Script error: No such module "Check for conflicting parameters".
Template:Infobox Korean name/auto
The Changyŏn Line is a non-electrified standard-gauge secondary line of the Korean State Railway running from Sugyo on the Ŭnnyul Line to Changyŏn, South Hwanghae Province, North Korea.[1]
History
Script error: No such module "Labelled list hatnote".
This line was originally opened on 21 January 1937 as part of the Chosen Railway's 762 mm (30.0 in) narrow gauge Hwanghae Line network,[2] as an extension to the Sariwŏn—Sanghae (renamed Samgang after nationalisation)—Sugyo line. The entirety of the Hwanghae Line network was nationalised on 1 April 1944 and absorbed by the Chosen Government Railway, which then split the Hwanghae Line network into separate lines, with the Sariwon—Sugyo—Changyŏn line becoming the Changyŏn Line.[3]
After the end of the Pacific War, the Changyŏn Line ended up in North Korea as a result of the subsequent partition of Korea. After the end of the Korean War the Railway Ministry of the DPRK began to expand and improve its network, including in South Hwanghae, leading to the opening of a line from Sugyo to Ch'ŏlgwang in 1961.[4] With the opening of the new line, the Sariwŏn—Sugyo—Ch'ŏlgwang line was named Ŭnnyul Line, leaving the Changyŏn Line as just the short branch from Sugyo to Changyŏn. This line was converted to standard gauge in 1971.[4]
Services
Semi-express passenger trains 138-139/140-141 operating between Manp'o and Changyŏn serve the entirety of this line from Sugyo to Changyŏn.[1]
Route
A yellow background in the "Distance" box indicates that section of the line is not electrified.
| Distance (km) | Station Name | Former Name | ||||
|---|---|---|---|---|---|---|
| Total | S2S | Transcribed | Chosŏn'gŭl (Hanja) | Transcribed | Chosŏn'gŭl (Hanja) | Connections |
| 0.0 | 0.0 | Sugyo | Script error: No such module "Lang". | Ŭnnyul Line | ||
| 4.7 | 4.7 | Songhwa Onch'ŏn | Script error: No such module "Lang". | |||
| 10.3 | 5.6 | Ragyŏn | Script error: No such module "Lang". | Naksan | Script error: No such module "Lang". | |
| Nakto | 낙도 (樂道) | Closed | ||||
| 17.7 | 7.4 | Changyŏn | Script error: No such module "Lang". | |||
References
Page Template:Reflist/styles.css has no content.
- ^ a b Kokubu, Hayato (2007), Script error: No such module "Lang"., Shinchosha, Tokyo, Template:ISBN
- ^ Script error: No such module "Lang". (The Public Journal of the Governor-General of Korea), Showa Nr. 3009, 28 January 1937
- ^ Script error: No such module "Lang". (The Public Journal of the Governor-General of Korea), Showa Nr. 5143, 29 March 1944
- Page Module:Citation/CS1/styles.css has no content.Japanese Government Railways (1937). 鉄道停車場一覧. 昭和12年10月1日現在 [The List of the Stations as of 1 October 1937]. Tokyo: Kawaguchi Printing Company. p. 508.
Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.