Dunkettle Interchange
Template:Short description Template:DMCA Template:Use Irish English Page Template:Infobox road/styles.css has no content.Template:Short description
Page Template:Plainlist/styles.css has no content.Page Module:Infobox/styles.css has no content.
| Dunkettle Interchange | |
|---|---|
| Script error: No such module "Infobox mapframe". | |
| Location | |
| Cork City, Ireland 51°54'11.4"N 8°22'57.2"W | |
| Coordinates | Lua error: callParserFunction: function "#coordinates" was not found. |
| Roads at junction | |
| Construction | |
| Opened | Script error: No such module "Date time". |
| Reconstructed | 1999 (flyover and 4th arm), 2024 (free-flow interchange) |
The Dunkettle Interchange (Template:Langx) is a major road junction in Cork City, Ireland. It forms a junction between the M8, N25 and the N40, and further serves the R623 and local roads L2998 and L3004. On average, 95,000 vehicles use the junction on a daily basis.[citation needed]
The junction was originally an at-grade roundabout, with a flyover in the west-east direction constructed later. In 2018, a further civil engineering upgrade to make the interchange work on a free-flow basis was undertaken by Sisk.[1] In February 2024 the rebuilt interchange costing €215 million was officially opened.[2]
It should not be confused with the Dunkettle Roundabout which is around 750m to the west.
History
Initial developments
The Dunkettle Interchange was constructed in order to link the N25 to the newly constructed Glanmire bypass which formed part of the N8 at Dunkettle. The junction opened in 1992 along with the Glanmire bypass. At the time, the junction had three arms, along with two access sliproads to allow access to and from Glounthaune.[citation needed]
A further significant upgrade came in 1999 when, in the order to facilitate the opening of the new Jack Lynch Tunnel, a fourth arm heading southbound was added. At the same time, a flyover of the roundabout was added to accommodate increased traffic levels. Access slip roads into and out of Little Island were also added along with access to the tunnel management building.[citation needed]
A further upgrade was completed in 2006. This involved installing traffic lights on the roundabout in order to increase the capacity of the junction.[citation needed]
Further changes
Due to the volumes of traffic using the junction on a daily basis, the National Roads Authority (NRA) and Cork County Council decided that the junction was unfit for purpose. Jacobs Engineering was appointed by the NRA to create plans to make the junction free-flow in all movements. In June 2011, the NRA presented five different solutions to create a free-flow junction,[3] and in 2013, a scheme was approved by the planning board.[4][5][6]
By September 2015, a Capital Investment Plan was unveiled by the Irish government, which secured funding for the interchange. By July 2018, Sisk had been selected by Transport Infrastructure Ireland (TII) as the main contractor.[7][1]
The rebuilt Dunkettle Interchange was officially opened by Tánaiste Micheál Martin on the 12 February 2024.[2] The new development includes four roundabouts.[8] The upgrade has also involved the installation of digital signage on the approach to the interchange and the N40 to provide information to drivers around journey times and traffic issues.[9]
Proposed railway station
Script error: No such module "Labelled list hatnote". In the mid-2020's Irish Rail announced plans to develop a park and ride railway station in the area.[10][11]
References
Page Template:Reflist/styles.css has no content.
- ^ a b Page Module:Citation/CS1/styles.css has no content.O'Halloran, Barry (26 June 2018). "Builder Sisk reports profit jump of 73% to €24.7m for 2017". IrishTimes.com.
- ^ a b Page Module:Citation/CS1/styles.css has no content.Power, Amy (12 February 2024). "'Great day' as final links of Dunkettle Interchange Upgrade to open today". Echo Live.
- ^ Page Module:Citation/CS1/styles.css has no content."€100m plan to end Cork traffic nightmare". IrishExaminer.ie. 6 April 2011.
- ^ Page Module:Citation/CS1/styles.css has no content.O'Riordan, Sean (16 May 2013). "€100m Dunkettle interchange project given green light". IrishExaminer.com.
- ^ Page Module:Citation/CS1/styles.css has no content.O'Riordan, Sean (6 March 2015). "'No funds' for easing Cork tunnel gridlock". Irish Examiner. Retrieved 27 August 2015.
- ^ Page Module:Citation/CS1/styles.css has no content.English, Eoin (8 July 2015). "'Focus on road projects that can support recovery'". Irish Examiner. Retrieved 27 August 2015.
- ^ Page Module:Citation/CS1/styles.css has no content."Capital Investment Plan 2016-2021: The main points". IrishTimes.com. 29 September 2015.
- ^ Page Module:Citation/CS1/styles.css has no content.Maguire, Mairead (12 February 2024). "Dunkettle interchange €215m revamp to officially open today". TheJournal.ie.
- ^ Page Module:Citation/CS1/styles.css has no content."Intelligent Transport Systems". Dunkettle.ie.
- ^ Page Module:Citation/CS1/styles.css has no content.Fitzgerald, Cormac (24 May 2024). "Planning underway for 8 new commuter train stations in Cork". TheJournal.ie. Journal Media. Retrieved 24 May 2024.
- ^ Page Module:Citation/CS1/styles.css has no content."Two new train stations for Cork set to enter planning phase". IrishRail.ie. Retrieved 6 May 2026.
External links
Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.