Europipe II

From Wikipedia, the free encyclopedia

Template:Short description Script error: No such module "about". Template:DMCA Template:DMCA

Page Module:Infobox/styles.css has no content.

Europipe II gas pipeline
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
Europipe II at Kårstø
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
Location of Europipe II gas pipeline
Script error: No such module "Infobox mapframe".
Location
CountryNorway, Germany
General directionnorth–south
FromKårstø, Norway
Passes throughNorth Sea
ToDornum, Germany
General information
Typenatural gas
OwnerGassled
OperatorGassco
Technical service providerStatoil
Commissioned1999
Technical information
LengthScript error: No such module "ConvertIB".
Maximum discharge24 billion m3/a (850 billion cu ft/a)
DiameterScript error: No such module "ConvertIB".

Script error: No such module "Check for conflicting parameters".

Europipe II is a natural gas pipeline from the Kårstø processing plant north of Stavanger, Norway, to a receiving terminal at Dornum in Germany. It came on stream on 1 October 1999.[1]

Route

Europipe II is a natural gas pipeline from the Kårstø plant north of Stavanger, Norway and runs about 13 kilometres (8.1 mi) onshore from Kårstø to Vestre Bokn. From there, the 642-kilometre (399 mi) offshore pipeline runs through Norwegian, Danish and German sectors of the North Sea. The German onshore section is 15 kilometres (9.3 mi) long.[2] At Dornum the gas is supplied into the Netra (Norddeutsche Erdgas Transversale) gas pipeline, which runs to Salzwedel in eastern Germany.

Technical description

The diameter of pipeline is 1,100 millimetres (42 in) and the capacity is 24 billion cubic metres (850 billion cubic feet) of natural gas per year.[3] Most of the gas is supplied from Equinor's Åsgard, Sleipner East/West, Gullfaks and Statfjord fields.

The Europipe II pipeline was laid by Semac I, Castoro Sei and Solitaire pipe-laying ships.[4] Europipe II was commissioned in 1999 and cost 9.6 billion NOK. The pipeline is operated by Gassco, the technical service provider is Equinor. It was built with an option to branch out to a separate pipeline to Denmark. A pipeline end manifold was installed in April 2022 for the Baltic Pipe to Poland.[5]

See also

Lua error in mw.title.lua at line 404: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

References

Page Template:Reflist/styles.css has no content.

  1. ^ Page Module:Citation/CS1/styles.css has no content."Europipe II on stream" (Press release). Statoil. 1 October 1999. Retrieved 29 January 2010.
  2. ^ Page Module:Citation/CS1/styles.css has no content.Scuchardt, B. (July 1998). "Environmental Impact Assessment. Europipe II in Germany: Onshore Section" (PDF). Bioconsult Schuchardt & Scholle. Statoil: 4. Retrieved 29 January 2010.
  3. ^ Page Module:Citation/CS1/styles.css has no content.Gilardoni, Andrea; Antonioli, Barbara; Carta, Marco (2008). The World Market for Natural Gas: Implications for Europe. Springer. p. 64. ISBN 978-3-540-68200-4. Retrieved 29 January 2010.
  4. ^ Page Module:Citation/CS1/styles.css has no content."Europipe II fully laid" (Press release). Statoil. 4 June 1999. Archived from the original on 9 June 2011. Retrieved 29 January 2010.
  5. ^ Page Module:Citation/CS1/styles.css has no content."Baltic Pipe Ready to Ship Norwegian Gas to Denmark". Offshore Engineer Magazine. 29 April 2022.