Gotemba Line

From Wikipedia, the free encyclopedia

Template:Short description

Page Module:Infobox/styles.css has no content.

Gotemba Line
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
JR Central 313 series train with Mount Fuji in the background, April 2022
Overview
OwnerTemplate:Ric
TerminiPage Template:Plainlist/styles.css has no content.
Stations19
Color on mapTemplate:Rcb Olive (#Template:Rcr)
Service
TypePassenger/freight
Operator(s)Template:Ric JR Central
JR Freight
Rolling stock315 series
313 series
211 series
Odakyu 60000 series MSE
History
Opened1 February 1889; 137 years ago (1889-02-01)
Technical
Line lengthScript error: No such module "ConvertIB".Template:Cvt
Track lengthScript error: No such module "ConvertIB".
Number of tracksEntirely single-track
Track gauge1,067 mm (3 ft 6 in)
Minimum radiusScript error: No such module "ConvertIB".
ElectrificationTemplate:1,500 V DC (overhead line)
Operating speedScript error: No such module "ConvertIB".Template:Cvt
Train protection systemATS-PT
Highest elevationScript error: No such module "ConvertIB".
Maximum incline2.5%
Route map
Template:Switcher

Script error: No such module "Check for conflicting parameters".

The Script error: No such module "Nihongo". is a railway line in Japan operated by the Central Japan Railway Company (JR Central). It connects Kōzu Station in Odawara to Numazu via Gotemba.

The Mt. Fuji limited express service runs between Tokyo's Shinjuku Station and Gotemba via Matsuda.

Stations

No. Station
name
Japanese Distance from
Kōzu
Transfers Location
Town/city Prefecture
Template:JRCSN Kōzu 国府津 0.0 km (0 mi) Template:Ric Odawara Kanagawa
Template:JRCSN Shimo-Soga 下曽我 3.8 km (2.4 mi)
Template:JRCSN Kami-Ōi 上大井 6.5 km (4.0 mi) Ashigarakami District,
Ōi
Template:JRCSN Sagami-Kaneko 相模金子 8.3 km (5.2 mi)
Template:JRCSN Matsuda 松田 10.2 km (6.3 mi) Template:Ric Ashigarakami District,
Matsuda
Template:JRCSN Higashi-Yamakita 東山北 13.1 km (8.1 mi) Ashigarakami District,
Yamakita
Template:JRCSN Yamakita 山北 15.9 km (9.9 mi)
Template:JRCSN Yaga 谷峨 20.0 km (12.4 mi)
Template:JRCSN Suruga-Oyama 駿河小山 24.6 km (15.3 mi) Suntō District,
Oyama
Shizuoka
Template:JRCSN Ashigara 足柄 28.9 km (18.0 mi)
Template:JRCSN Gotemba 御殿場 35.5 km (22.1 mi) Gotemba
Template:JRCSN Minami-Gotemba 南御殿場 38.2 km (23.7 mi)
Template:JRCSN Fujioka 富士岡 40.6 km (25.2 mi)
Template:JRCSN Iwanami 岩波 45.3 km (28.1 mi) Susono
Template:JRCSN Susono 裾野 50.7 km (31.5 mi)
Template:JRCSN Nagaizumi-Nameri 長泉なめり 53.5 km (33.2 mi) Suntō District,
Nagaizumi
Template:JRCSN Shimo-Togari 下土狩 55.6 km (34.5 mi)
Template:JRCSN Ōoka 大岡 57.8 km (35.9 mi) Numazu
Template:JRCSN Numazu 沼津 60.2 km (37.4 mi) Template:Ric

Rolling stock

Local services

Limited express Mt. Fuji (formerly named Asagiri) services

Past

History

The present-day Gotemba Line was built as part of the original route of the Tōkaidō Main Line connecting Tokyo with Osaka. The portion between Kōzu and Numazu was opened on February 1, 1889, although it was not officially named the "Tokaido Line" until 1896. Portions were double tracked from 1891 and the double tracking was completed by 1901.

The line took an indirect route between Kōzu and Numazu in order to avoid the Hakone Mountains, which affected the potential journey time between Tokyo and Osaka. A more direct route had been planned as early as 1909, but technical difficulties delayed the completion of the Tanna Tunnel until December 1, 1934. With the opening of the tunnel, the route of the Tōkaidō Main Line became via Atami Station, leaving the section between Kōzu Station and Numazu Station as a spur line renamed as the Gotemba Line.

In 1943, due to the reduced traffic on the Gotemba line, and the urgent requirement for steel in World War II, the line was returned to a single track railway. Diesel multiple units replaced steam locomotive-hauled passenger trains in 1955, and a cooperative agreement was reached with the privately owned Odakyu Electric Railway to operate express trains directly from Shinjuku Station in Tokyo in the same year. The line was electrified from 1968, and regularly scheduled freight services were discontinued at most stations by 1982.

A new centralized traffic control system was installed in December 1989, with a programmed route control system implemented from March 1990. Installation for the TOICA automated turnstile system was completed at all stations in 2010.[citation needed]

Former connecting lines

  • Gotemba station - A 19 km 762mm gauge horse tramway opened to Kawaguchiko in 1898, closed in 1905 but was reopened in 1909. It connected to the Tsuru horse tramway, providing a connection to Otsuki station on the Chuo Main Line until 1919, when it was truncated by 9 km, completely closing 10 years later.
  • Shimo-Togari station - The Izu Railway Co. opened a line to Shuzenji in 1898, electrifying the line at 1500V DC in 1918. In 1934 following the opening of the Tanna Tunnel and associated realignment, the line was truncated to Mishima-Hirokoji station on the Tokaido Main Line.

References

Page Template:Reflist/styles.css has no content.

  1. ^ Page Module:Citation/CS1/styles.css has no content.Odakyu Electric Railway (16 December 2011). 2012年3月17日(土) ダイヤ改正を実施します。 [Saturday 17 March 2012 Timetable Revision] (PDF) (Press release) (in 日本語). Japan. Retrieved 13 April 2012.
  2. ^ Page Module:Citation/CS1/styles.css has no content.ハスラートラ. "静岡車両区211系廃車・譲渡状況". tokaido-unyo-shizuoka.com (in 日本語). Retrieved 2025-09-02.

Page Template:Refbegin/styles.css has no content.

Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.

Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.

Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.