Holbrook Superconductor
Location
CountryUnited States
StateNew York
Ownership information
OwnerLong Island Power Authority
OperatorPSEG Long Island
Construction information
Construction startedJuly 4, 2006
CommissionedJune 25, 2008
Technical information
TypeSuperconductor transmission line
Total lengthScript error: No such module "ConvertIB".

The Holbrook Superconductor Project is the world's first production superconducting transmission power cable.[1] The lines were commissioned in 2008.[2] The suburban Long Island electrical substation is fed by a 2,000-foot (610 m) tunnel containing approximately 509,000 feet (155,000 m) of high-temperature superconductor wire manufactured by American Superconductor, installed underground and chilled to superconducting temperature with liquid nitrogen.[3]

Project

The project was funded by the United States Department of Energy, and operates as part of the Long Island Power Authority (LIPA) power grid.[1] The project team comprised American Superconductor, Nexans, Air Liquide and LIPA. It broke ground on July 4, 2006, was first energized April 22, 2008, and was commissioned on June 25, 2008.[4] Between commissioning and March 2009 refrigeration events impacted normal operation.[4]

Specifications

The superconductor is bismuth strontium calcium copper oxide (BSCCO) which superconducts at liquid nitrogen temperatures(nitrogen is a liquid between −210 °C (−346 °F; 63 K) and Template:Cvt). Other parts of the system include a 13,000 U.S. gallons (49,000 L) liquid nitrogen storage tank, a Brayton cycle Helium refrigerator, and a number of cryostats which manage the transition between cryogenic and ambient temperatures.[1] The system capacity is 574 MVA with an operating voltage of 138 kV at a maximum current of 2400 A.

See also

References

Page Template:Reflist/styles.css has no content.

  1. ^ a b c Page Module:Citation/CS1/styles.css has no content.Frank SCHMIDT (2007), Development and demonstration of a long length transmission voltage cold dielectric superconducting cable to operate in the Long Island Power Authority grid (PDF)
  2. ^ Page Module:Citation/CS1/styles.css has no content.Maguire, J.F.; Yuan, J. (2009), "Status of high temperature superconductor cable and fault current limiter projects at American Superconductor", Physica C: Superconductivity, 469 (15–20): 874, Bibcode:2009PhyC..469..874M, doi:10.1016/j.physc.2009.05.089
  3. ^ Page Module:Citation/CS1/styles.css has no content.Gelsi, Steve (2008-07-10). "Power firms grasp new tech for aging grid". Market Watch. Retrieved 2008-07-11.
  4. ^ a b Page Module:Citation/CS1/styles.css has no content."Holbrook Substation Superconductor Cable System, Long Island, New York Final Report" (PDF). American Superconductor Corporation. Executive Summary.

Template:Long Island power