Intact Centre
Page Module:Infobox/styles.css has no content.
| Intact Centre | |
|---|---|
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. Intact Centre with the Leslie L. Dan Pharmacy Building to the right | |
| Script error: No such module "Infobox mapframe". | |
| Former names | Page Template:Plainlist/styles.css has no content.
|
| General information | |
| Type | Office building |
| Architectural style | International |
| Location | Template:Csv |
| Coordinates | Lua error: callParserFunction: function "#coordinates" was not found. |
| Completed | 1976 |
| Opened | 1976 |
| Owner | KingSett Capital Inc. |
| Technical details | |
| Floor count | 20 |
| Floor area | 113,898 m2 (1,225,990 sq ft) |
| Lifts/elevators | 17 |
| Design and construction | |
| ArchitectTemplate:Pluralize from text | Kenneth Raymond Cooper, Kenneth H. Candy |
| Architecture firm | Gordon S. Adamson and Associates |
| Awards and prizes | BOMA Canada 2020 TOBY |
| Designations | LEED Gold, Fitwel 1 Star, BOMA BEST Gold, WiredScore Platinum, WELL, Rick Hansen Foundation Accessibility |
| Other information | |
| Public transit access | Script error: No such module "Adjacent stations". Queen's Park |
Script error: No such module "Check for conflicting parameters".
The Intact Centre is an office building located in Toronto, Ontario, Canada that serves as the head offices of Ontario Power Generation (OPG) and Intact Financial. The University of Toronto's Department of Statistical Science and Department of Sociology are also located inside.[1][2] It was originally built in 1975 for Ontario Hydro (of which OPG is a successor company) and has been previously known as Hydro Place, Ontario Hydro Building and Ontario Power Building. The building was designed by Kenneth R. Cooper, Adamson Associates served as the architect of record.[3] The building is owned by Triovest.[citation needed]
In 2015 the Minister of Energy directed OPG to sell 700 University Avenue and the parking garage at 40 Murray Street. The sale took place in January 2017. Proceeds were deposited in Ontario's Trillium Trust, which funds various infrastructure projects in Ontario.[4][5]
See also
References
Page Template:Reflist/styles.css has no content.
- ^ Page Module:Citation/CS1/styles.css has no content."Contact Us | Department of Sociology". www.sociology.utoronto.ca. Retrieved 2024-12-19.
- ^ Page Module:Citation/CS1/styles.css has no content."Contact the Department". Department of Statistical Sciences. 2017-10-25. Retrieved 2024-12-19.
- ^ Page Module:Citation/CS1/styles.css has no content.Mitanis, Marc (24 August 2020). "Office, Retail, and Residential Expansion Proposed at Ontario Power Building | UrbanToronto". urbantoronto.ca. Retrieved 23 December 2024.
- ^ Page Module:Citation/CS1/styles.css has no content."KingSett Canadian Real Estate Income Fund LP Agrees to Purchase OPG Head Office Property" (PDF). OPG.com. OPG. Retrieved 16 December 2024.
- ^ Page Module:Citation/CS1/styles.css has no content."OPG sells two properties in Toronto to KingSett Canadian Real Estate Income Fund | Work | Torys LLP". www.torys.com. Torys LLP. Retrieved 16 December 2024.
External links
Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.