Interstate 189

From Wikipedia, the free encyclopedia

Template:Short description Template:DMCA Template:DMCA

Page Template:Hlist/styles.css has no content.Page Template:Plainlist/styles.css has no content.Page Module:Infobox/styles.css has no content.Page Template:Infobox road/styles.css has no content.

Script error: No such module "Infobox road/route".
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
I-189 highlighted in red
Script error: No such module "Infobox mapframe".
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
Auxiliary route of Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
LengthLua error: expandTemplate: template "cvt" does not exist.
ExistedLua error in package.lua at line 80: module 'Module:Road data/util' not found.
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
NHSEntire route
Page Module:Infobox/styles.css has no content.Major junctions
West endTemplate:Jct at the South BurlingtonBurlington city line
East endTemplate:Jct in South Burlington
Lua error: expandTemplate: template "Country name" does not exist.
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
Script error: No such module "Infobox road/browselinks".
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.
Lua error in package.lua at line 80: module 'Module:Road data/util' not found.

Script error: No such module "Infobox road/errors".[[Category:Infobox road instances Template:Infobox road/meta/mask/category]]

Interstate 189 (I-189) is an auxiliary Interstate Highway in Chittenden County, Vermont. The spur extends for 1.49 miles (2.40 km) from I-89 exit 13 in South Burlington to US Route 7 (US 7) at the Burlington city limit. I-189 is the only auxiliary route of I-89 and the only auxiliary Interstate Highway in Vermont.

Route description

I-189 serves as an Interstate-grade connector between I-89 and a commercial district along US 7 (Shelburne Road). It is signed as an east–west highway. Prior to 2010, only one directional sign had been posted on the highway, on the eastbound side after the on-ramp from US 7. Sign replacements and additions in late 2010 added directional signs on both the eastbound and westbound sides of the route.

History

File:Ghostramp189.JPG
Unused section of the Champlain Parkway to the west of US 7; the current interchange is visible in the distance. Construction has begun on this segment since then.

The concept of I-189, known as the Southern Connector, and the Champlain Parkway into the city of Burlington along the waterfront and service an industrial area was first made in the mid-1960s. The construction of the C-1 Section (I-189/U.S. Route 7 interchange to Home Avenue), began construction sometime in the late 1980s, It was nearly completed in 1989, but the remediation plan development for the Pine Street Barge Canal Superfund Site delayed the construction of the C-2 Section (Home Avenue to Lakeside Avenue) and the C-8 Section (Lakeside Avenue to Battery Street through the Pine Street Barge Canal Superfund Site), and due to continued legal challenges. These challenges mostly came from the Pine Street Coalition, who argued the project was unnecessary and too costly as well as discriminatory due to the increased traffic in the low-income and minority residents of King and Maple streets neighborhood.[2] The original Southern Connector project was eventually canceled as the city largely left behind its industrial past in favor of tourism in the 1980s and the roadway was abandoned just beyond the US 7 interchange. As a result, Jersey barriers are in place on I-189 west directing traffic onto the US 7 offramp, orphaning approximately 0.65 miles (1.05 km) of road, along with a few ramps. More support of the project in recent years has led to a resumption of construction.[3]

Future

The federal government previously gave the state a deadline to make a final decision on building the extension or they would lose matching funds. In early 2012, consensus settled on a two-lane parkway named the "Champlain Parkway" that will run northerly from Home Avenue for about 0.7 miles (1.1 km), then curve onto existing city streets in order to funnel traffic into downtown away from US 7.[4] I-189 will extend westward, then turn to the north, terminate at Home Avenue, and connect to the parkway. In August 2014, the parkway received its land use permit, clearing the way for the project to begin.[5] Opposition to the $30-million project and changes to its design led to delays in construction,[6][7] which finally began in June 2022.[8] The segment of the parkway between Home and Lakeside Avenues opened in August 2024, with the entire highway going into service in 2026.[9][10]

Exit list

The entire route is in [[South Burlington, Template:Jct/statename|South Burlington]], [[Chittenden County, Template:Jct/statename|Chittenden County]]. All exits are unnumbered.

Script error: No such module "Jctint/USA". Script error: No such module "Jctint/USA". Script error: No such module "Jctint/USA". Script error: No such module "Jctint/USA".

mi[11]kmDestinationsNotes
Page Module:Jctbtm/styles.css has no content.1.000 mi = 1.609 km; 1.000 km = 0.621 mi
Page Template:Hlist/styles.css has no content.

Images

References

Page Template:Reflist/styles.css has no content.

  1. ^ Page Module:Citation/CS1/styles.css has no content.Starks, Edward (January 27, 2022). "Table 2: Auxiliary Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. Retrieved September 10, 2022.
  2. ^ Page Module:Citation/CS1/styles.css has no content."Pine Street Canal Superfund". Retrieved October 5, 2014.{{cite web}}: CS1 maint: deprecated archival service (link)
  3. ^ Page Module:Citation/CS1/styles.css has no content.Crowley, Patrick (May 17, 2023). "Federal judge rules in favor of Burlington in Champlain Parkway lawsuit". VTDigger. Retrieved May 21, 2023.Page Module:Citation/CS1/styles.css has no content.WCAX News (May 17, 2023). "Ruling paves the way for part of Champlain Parkway to open next year". Retrieved May 18, 2023.
  4. ^ Page Module:Citation/CS1/styles.css has no content."Champlain Parkway project map". Archived from the original on November 28, 2015. Retrieved December 7, 2015.
  5. ^ Page Module:Citation/CS1/styles.css has no content.WCAX News (August 26, 2014). "Champlain Parkway Wins Act 250 Permit". Retrieved October 5, 2014.{{cite web}}: CS1 maint: deprecated archival service (link)
  6. ^ Page Module:Citation/CS1/styles.css has no content.Liguori, Priscilla (November 16, 2017). "Will construction for the Champlain Parkway finally begin?". WCAX. Retrieved July 16, 2018.
  7. ^ Page Module:Citation/CS1/styles.css has no content.Battipaglia, Helena (May 21, 2018). "Residents ask planners to reconsider long-delayed Champlain Parkway project". NBC5. Retrieved July 16, 2018.
  8. ^ Page Module:Citation/CS1/styles.css has no content.WCAX News (June 21, 2022). "Champlain Parkway Construction Resumes". Retrieved June 25, 2022.
  9. ^ Page Module:Citation/CS1/styles.css has no content.McDonald, Corey (August 20, 2024). "Burlington cuts the ribbon on 'middle segment' of Champlain Parkway". VTDigger. Retrieved November 13, 2024.
  10. ^ Page Module:Citation/CS1/styles.css has no content.Bewlay, Sid (August 20, 2024). "Phase 1 of the Champlain Parkway Project opens, after more than 50 years of back and forth". WPTZ. Retrieved November 13, 2024.
  11. ^ Page Module:Citation/CS1/styles.css has no content."2006 (Route Log) AADTs – State Highways" (PDF). Vermont Agency of Transportation. June 2007. Archived from the original (PDF) on March 26, 2009. Retrieved May 16, 2009.

Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.

Script error: No such module "Attached KML".

Template:3di Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.