Interstate 74
Template:Short description Lua error in package.lua at line 80: module 'Module:Hatnote list' not found. Template:DMCA Template:DMCA
Page Template:Hlist/styles.css has no content.Page Template:Plainlist/styles.css has no content.Page Module:Infobox/styles.css has no content.Page Template:Infobox road/styles.css has no content.
| Script error: No such module "Infobox road/route". | |
|---|---|
| Lua error in package.lua at line 80: module 'Module:Road data/util' not found. | |
I-74 highlighted in red | |
| Script error: No such module "Infobox mapframe". | |
| Lua error in package.lua at line 80: module 'Module:Road data/util' not found. | |
| Lua error in package.lua at line 80: module 'Module:Road data/util' not found. | |
| Lua error in package.lua at line 80: module 'Module:Road data/util' not found. | |
| Lua error in package.lua at line 80: module 'Module:Road data/util' not found. | |
| Length | Lua error: expandTemplate: template "cvt" does not exist. |
| Existed | Lua error in package.lua at line 80: module 'Module:Road data/util' not found. |
| Lua error in package.lua at line 80: module 'Module:Road data/util' not found. | |
| NHS | Entire route |
| Page Template:Plainlist/styles.css has no content.Page Module:Infobox/styles.css has no content.Original segment | |
| West end | Template:Jct in Davenport, IA |
| Major intersections | Page Template:Plainlist/styles.css has no content. |
| East end | Template:Jct in Cincinnati, OH |
| Mount Airy segment | |
| West end | Template:Jct at the Virginia state line near Pine Ridge, NC |
| East end | Template:Jct in Mount Airy, NC |
| Central North Carolina segment | |
| West end | Template:Jct in Winston-Salem, NC |
| Major intersections | Page Template:Plainlist/styles.css has no content. |
| East end | Template:Jct near Hamlet, NC |
| Eastern North Carolina segment | |
| West end | Template:Jct in Maxton, NC |
| Major intersections | Template:Jct in Lumberton, NC |
| South end | Template:Jct near Lumberton, NC |
| Page Module:Infobox/styles.css has no content.Location | |
| Country | United States |
| States | Iowa, Illinois, Indiana, Ohio; North Carolina |
| Lua error in package.lua at line 80: module 'Module:Road data/util' not found. | |
| Script error: No such module "Infobox road/browselinks". | |
| Lua error in package.lua at line 80: module 'Module:Road data/util' not found. | |
| Lua error in package.lua at line 80: module 'Module:Road data/util' not found. | |
Script error: No such module "Infobox road/errors".[[Category:Infobox road instances Template:Infobox road/meta/mask/category]]
Interstate 74 (I-74) is an Interstate Highway in the Midwestern and Southeastern United States. Its western end is at an interchange with I-80 in Davenport, Iowa; the eastern end of its Midwest segment is at an interchange with I-75 in Cincinnati, Ohio. The major cities that I-74 connects to include Davenport, Iowa; Peoria, Bloomington, and Champaign, Illinois; Indianapolis, Indiana; and Cincinnati, Ohio. I-74 also exists as several disconnected sections of highways in North Carolina.
Route description
| mi[1] | km | |
|---|---|---|
| IA | 5.36 | 8.63 |
| IL | 220.34 | 354.60 |
| IN | 171.54 | 276.07 |
| OH | 19.47 | 31.33 |
| WV | ||
| VA | ||
| NC | 124.91 | 201.02 |
| SC | ||
| Total | 541.62 | 871.65 |
Iowa
Script error: No such module "Labelled list hatnote".

In the state of Iowa, I-74 runs south from I-80 for 5.36 miles (8.63 km) before crossing into Illinois on the I-74 Bridge. North of the Mississippi River, I-74 bisects Bettendorf and Davenport.
Illinois
Script error: No such module "Labelled list hatnote".

In the state of Illinois, I-74 runs south from Moline to Galesburg; from this point, it runs southeast through Peoria to the Bloomington–Normal area and I-55. I-74 continues southeasterly to the Champaign–Urbana metropolitan area, intersecting I-57. The Interstate then runs east past Danville at the Illinois–Indiana state line. U.S. Route 150 (US 150) parallels I-74 in Illinois for its entire length, save the last few miles on the eastern end (in Danville, when US 150 turns south on Illinois Route 1 [IL 1]), where it parallels US 136.
Indiana
Script error: No such module "Labelled list hatnote". In the state of Indiana, I-74 runs east from the Illinois state line to the Crawfordsville area before turning southeasterly. It then runs around the city center of Indianapolis along I-69 and I-465. Once I-74 reaches the southeast side of Indianapolis, it diverges from I-69 and I-465 and continues to the southeast. It then enters Ohio at Harrison.
Ohio
Script error: No such module "Labelled list hatnote". In the state of Ohio, I-74 runs southeast from the Indiana border to the western segment's current eastern terminus at I-75 just north of Downtown Cincinnati. It is also signed with US 52 for its entire length. While planned to continue through West Virginia and Virginia to the I-74 section in North Carolina, the route remains unsigned or unbuilt past Cincinnati. At this point, I-74 would follow US 52 or more likely follow State Route 32 (SR 32), east from Cincinnati.
North Carolina
Script error: No such module "Labelled list hatnote". In the state of North Carolina, as of January 2025[update], I-74 exists in several segments, starting with a concurrency with I-77 at the Virginia border. This includes the most western portion from I-77 to US 52 just south of Mount Airy, a segment first opened to traffic as a bypass of High Point then extended west to I-40 east of Winston-Salem and east to I-73 near Randleman, then another along the southern segment of I–73 and US 220 from just north of Asheboro to northwest of Rockingham, and finally a more eastern segment that runs from Laurinburg to an end at NC 41 near Lumberton.[citation needed] One of the latest segments to be signed, from I-40 to High Point, occurred after the federal government approved signing this section as I-74 in mid-2013, despite the highway not being up to current Interstate Highway standards. It was uncertain why the Federal Highway Administration (FHWA) made an exception, but this might have been the result of a misinterpretation when a state highway administrator asked for Interstate designation for another section and "Future Interstate" for the section already completed that did not meet standards.[3] The Rockingham bypass was completed and opened to traffic on January 28, 2025.[4]
Future
Long-range plans call for I-74 to continue east and south of Cincinnati to North Carolina using SR 32 from Cincinnati to Piketon, Ohio, and then the proposed I-73 from Portsmouth, Ohio, through West Virginia (along parts of current US 52 and WV Route 108) to I-77. It would then follow I-77 through Virginia into North Carolina, where I-74 splits from I-77 near the Virginia state line and runs eastward to northwest US 52, which it will eventually follow to Winston-Salem, then through High Point to I-73. I-73 and I-74 overlap to Rockingham.[citation needed]
In 1996, the American Association of State Highway and Transportation Officials (AASHTO) approved the signing of highways as I-74 along its proposed path east (south) of I-81 in Wytheville, Virginia, where those highways meet Interstate Highway standards. North Carolina started putting up I-74 signs along its roadways in 1997. As of December 2008[update], I-74 is proposed to follow the path of I-77 through the state of Virginia but remains unsigned from the West Virginia border to the North Carolina border.[citation needed]
Ohio
The 1991 plan to build I-73 soon included an extension of I-74 from where it ended in Hamilton County to I-73 at Portsmouth, Ohio, possibly along SR 32.[5]
In November 1991, Congress passed the $151-billion (equivalent to $Format price error: cannot parse value "Error when using Template:Tl: |index=US-GDP (parameter 1) not a recognized index." in 2024[6]) Intermodal Surface Transportation Efficiency Act (ISTEA) that included the I-73/74 North-South Corridor and made I-73 a priority and included an extension of I-74 from Hamilton County to I-73 at Portsmouth.[7]
On August 31, 1992, the Ohio Turnpike Commission passed a resolution to study making the extension of I-74 a toll road. Congress had authorized paying for 80 percent of the cost, but the state would have to pay the remainder of the $56 million (equivalent to $Format price error: cannot parse value "Error when using Template:Tl: |index=US-GDP (parameter 1) not a recognized index." in 2024[6]).[8]
The Ohio Turnpike Commission proposed that the extension run along SR 32;[9] while Representative Jim Bunning of Kentucky wanted the road to begin in the west as part of a greater Cincinnati/Northern Kentucky bypass, returning to Ohio near Maysville, Kentucky.[10]
West Virginia
Script error: No such module "Labelled list hatnote". As of October 2009[update], I-74 remains unbuilt in the state of West Virginia. The West Virginia Department of Transportation (WVDOT) is currently upgrading the Tolsia Highway to four lanes but not to Interstate Highway standards.
It was estimated that improving US 52 to Interstate standards in West Virginia would cost $2 billion (equivalent to $Format price error: cannot parse value "Error when using Template:Tl: |index=US-GDP (parameter 1) not a recognized index." in 2024[6]).[11] Still, by 1994, improvements to US 52 were planned, and future plans called for I-73 to follow that route. The I-74 extension seemed more certain.[12]
North Carolina
A section of I-74 in North Carolina is currently under construction. This is the eastern half of the Winston-Salem Northern Beltway.
The proposed path of I-74 east of I-95 in North Carolina is still being debated. The current plan takes the route along US 74 to NC 211 near Bolton then south along US 17 to near the South Carolina border. These sections are not currently proposed to be built perhaps for another 20 to 30 years. The North Carolina Turnpike Authority—at the request of officials in Brunswick County—are studying whether a toll road could get the section of I-74 in that county built faster.[13][self-published source]
Starting west of Rockingham and from Laurinburg to Maxton and to the east, I-74 runs concurrent with US 74. This was the first time that a U.S. Route and Interstate Highway with the same number have been designated on the same highway.[14][self-published source] A similar situation occurred more recently in June 2015 when Wisconsin started routing I-41 along the route of US 41.
South Carolina
Script error: No such module "Labelled list hatnote". On February 11, 2005, the North Carolina Department of Transportation (NCDOT) and South Carolina Department of Transportation (SCDOT) came to an agreement over where I-74 (and I-73) would cross the border between the two states. It was decided that I-74 would cross the line as a northern extension of South Carolina Highway 31 (SC 31). SC 31 is being used a temporaily placeholder designation until the I-74 from North Carolina connect the South Carolina proposed route. I-74 is then proposed to end south of Myrtle Beach at SC 707. In the 1990s, both I-73 and I-74 were to end at Georgetown but funding cannot allow for the possible extensions to Georgetown or Charleston.[citation needed] In November 2019, both NCDOT and SCDOT released maps of where I-74 could go to from South Carolina to North Carolina.[citation needed]
Junction list
- Iowa[15]
- Template:Jct in Davenport
- Template:Jct on the Davenport–Bettendorf city line. The highways travel concurrently to Moline, Illinois.
- Template:Jct in Bettendorf
- Illinois[15]
- Template:Jct in Moline. I-74/I-280 travels concurrently to Colona.
- Template:Jct in Colona
- Template:Jct in Galesburg
- Template:Jct east of Knoxville
- Template:Jct west of Peoria
- Template:Jct in Peoria
- Template:Jct in East Peoria
- Template:Jct in East Peoria
- Template:Jct in Morton
- Template:Jct north-northwest of Yuton
- Template:Jct in Normal, Illinois
- Template:Jct northwest of Normal. I-55/I-74 travels concurrently to Bloomington. I-74/US 51 travels concurrently to south of Bloomington.
- Template:Jct in Bloomington
- Template:Jct south-southeast of Le Roy
- Template:Jct in Champaign
- Template:Jct in Urbana
- Template:Jct east-northeast of Oakwood
- Template:Jct in Tilton
- Indiana[15]
- Template:Jct in Veedersburg
- Template:Jct in Crawfordsville
- Template:Jct on the Indianapolis–Speedway line. I-74/I-465 travels concurrently into Indianapolis proper.
- Template:Jct in Indianapolis. The highways travel concurrently through Indianapolis.
- Template:Jct in Indianapolis. The highways travel concurrently through Indianapolis.
- Template:Jct in Indianapolis
- Template:Jct in Indianapolis. I-69/I-74 travel concurrently until I-74 leaves I-465.
- Template:Jct in Indianapolis. The highways travel concurrently through Indianapolis.
- Template:Jct in Indianapolis
- Template:Jct in Indianapolis. I-74/US 421 travels concurrently to northwest of Greensburg.
- Template:Jct west-northwest of West Harrison. The highways travel concurrently to Cincinnati, Ohio.
- Ohio[15]
- Template:Jct west-northwest of Miamitown. The highways travel concurrently to northwest of Dent.
- Template:Jct in Cincinnati
- Template:Jct in Cincinnati
- Template:Jct in Cincinnati
- Gap in route
- North Carolina[15]
- Template:Jct at the Virginia state line north-northwest of Pine Ridge. The highways travel concurrently to west-southwest of Pine Ridge.
- Template:Jct in White Plains
- Template:Jct east of White Plains
- Gap in route
- Template:Jct in Winston-Salem
- Template:Jct in High Point
- Template:Jct east-northeast of Archdale
- Template:Jct in Randleman. I-73/I-74 travels concurrently to northwest of Rockingham. I-74/US 220 travels concurrently to Emery.
- Template:Jct northwest of Rockingham
- Gap in route
- Template:Jct southeast of Maxton. I-74/US 74 travels concurrently to Lumberton.
- Template:Jct west-southwest of Lumberton
- Template:Jct in Lumberton
Auxiliary routes
- Template:Jct: A partially completed bypass of Winston-Salem, North Carolina, planned to follow the western half of the Winston-Salem Northern Beltway.
- Template:Jct: A southwestern bypass loop of Peoria, Illinois.
See also
- Script error: No such module "portal-inline".
References
Page Template:Reflist/styles.css has no content.
- ^ a b Page Module:Citation/CS1/styles.css has no content.Starks, Edward (June 27, 2023). "Table 1: Main Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways as of December 31, 2021". Route Log and Finder List. Federal Highway Administration. Retrieved April 18, 2022.
- ^ Page Module:Citation/CS1/styles.css has no content.Public Roads Administration (August 14, 1957). Official Route Numbering for the National System of Interstate and Defense Highways as Adopted by the American Association of State Highway Officials (Map). Washington, DC: Public Roads Administration. Archived from the original on July 19, 2017. Retrieved June 14, 2018 – via Wikimedia Commons.
- ^ Page Module:Citation/CS1/styles.css has no content.Young, Wesley (August 29, 2014). "Mistaken Identity". Winston-Salem Journal.
- ^ Page Module:Citation/CS1/styles.css has no content."NCDOT: Rockingham bypass to open Tuesday". The Richmond Observer. KCL Media. January 27, 2025. Retrieved January 28, 2025.
- ^ Page Module:Citation/CS1/styles.css has no content.Hunter, Ginny (March 28, 1991). "I-73 Plan Would Link I-74 with Ohio 32". The Cincinnati Post. p. 1.
- ^ a b c Page Module:Citation/CS1/styles.css has no content.Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
- ^ Page Module:Citation/CS1/styles.css has no content.Condo, Adam (November 30, 1991). "Congress Puts I-74 on Fast Lane to Coast". The Cincinnati Post. p. 7A.
- ^ Page Module:Citation/CS1/styles.css has no content.Penix, Len (September 17, 1992). "Linkup May Take Toll". The Cincinnati Post. p. 1.
- ^ Page Module:Citation/CS1/styles.css has no content.Penix, Len (September 21, 1995). "State: No new I-74 leg Project could use Ohio 32 instead". The Cincinnati Post. p. 1.
- ^ Page Module:Citation/CS1/styles.css has no content.Dias, Monica (March 26, 1998). "I-74 extension through N. Kentucky is still alive". The Cincinnati Post. p. 6A.
- ^ Page Module:Citation/CS1/styles.css has no content."Police Close to Arrest in N. Limestone Slaying". Lexington Herald-Leader. June 10, 1991. p. B2.
- ^ Page Module:Citation/CS1/styles.css has no content.Harris, Sheryl (April 18, 1994). "Interstate System in Ohio to Grow". Akron Beacon Journal. p. A1.
- ^ Page Module:Citation/CS1/styles.css has no content.Malme, Robert H. (2015). "I-74 Segment 17". Gribble Nation. Retrieved May 30, 2015.[self-published source]
- ^ Page Module:Citation/CS1/styles.css has no content.Malme, Robert H. (2009). "I-74 Segment 16". Archived from the original on October 8, 2011. Retrieved November 26, 2011.[self-published source]
- ^ a b c d e Page Module:Citation/CS1/styles.css has no content.Rand McNally (2014). The Road Atlas (Walmart ed.). Chicago: Rand McNally. pp. 32, 36–37, 39, 74, 80. ISBN 978-0-528-00771-2.
External links
Script error: No such module "Attached KML".
Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.
- File:Openstreetmap logo.svg Geographic data related to Interstate 74 at OpenStreetMap
- I-74 in NC Progress Page
- SCDOT - Carolina Bays Parkway Phase II Script error: No such module "webarchive". (part of I-74)
- High Priority Corridor 5 (I-73/74) Script error: No such module "webarchive".
- Upgrade 74 Renovation Project Script error: No such module "webarchive".
- I-74 on Cincinnati-Transit.net
- Interstate 74 Cincinnati to Piketon Corridor
- I-74 Iowa-Illinois Corridor Study
- Illinois Highway Ends: Interstate 74
- Indiana Highway Ends: Interstate 74
- AA Roads - Interstate 74 Script error: No such module "webarchive".
- National I-73/I-74/I-75 Corridor Association
- Interstate 74 Construction, Moline, Illinois Script error: No such module "webarchive".
Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.