JAGAL
Page Module:Infobox/styles.css has no content.
| JAGAL | |
|---|---|
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. Yamal-Europe pipeline | |
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. Location of JAGAL | |
| Script error: No such module "Infobox mapframe". | |
| Location | |
| Country | Germany |
| State | Brandenburg Thuringia |
| General direction | north–south |
| From | Lebus (connected to Yamal-Europe pipeline) |
| Passes through | Mallnow Baruth/Mark Bernau bei Berlin |
| To | Rückersdorf (connected to STEGAL pipeline) |
| General information | |
| Type | natural gas |
| Operator | Gascade Gastransport GmbH |
| Construction started | 1995 |
| Commissioned | 1999 |
| Technical information | |
| Length | Script error: No such module "ConvertIB". |
| Maximum discharge | 24 billion cubic meters per year |
| Diameter | Script error: No such module "ConvertIB". |
| No. of compressor stations | 1 |
| Compressor stations | Mallnow |
Script error: No such module "Check for conflicting parameters".
JAGAL (Jamal-Gas-Anbindungsleitung) is a German section of the Yamal-Europe pipeline. The pipeline is used for the Russian natural gas import and it is owned and operated by Gascade Gastransport GmbH. It runs from the Polish–German border at Lebus near Frankfurt (Oder) to Rückersdorf. In Rückersdorf JAGAL is connected with STEGAL pipeline carrying gas further west. In Bernau JAGAL is connected with the Verbundnetz Gas AG-operated long-distance gas pipeline No. 302.[1]
Construction of the JAGAL pipeline started in 1995, when a double duct between Lebus and Górzyca in Poland was laid under Oder and 11-kilometre (6.8 mi) long connection from Lebus to Mallnow compressor station was built. This section was completed in 1996. The 97-kilometre (60 mi) second section of JAGAL from Mallnow to Baruth/Mark was completed in 1997. 230-kilometre (140 mi) JAGAL II from Baruth to Rückersdorf was constructed in 1999. The section from the border to Mallnow has a diameter of 1,400 millimetres (55 in) while rest of the pipeline has a diameter of 1,400 millimetres (55 in). It has a capacity of 840 billion cubic feet (24×109 m3) of natural gas per year.
See also
Lua error in mw.title.lua at line 404: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
References
Page Template:Reflist/styles.css has no content.
- ^ Page Module:Citation/CS1/styles.css has no content."Bernau measuring and control station" (PDF). PLEcon Pipeline Engineering Consulting GmbH. Retrieved 2010-07-16.
External links
[[Category:Template:Resolve category redirect]]Template:Coord missing/CheckCat