The Newhaven ERF (Energy Recovery Facility) is an incinerator, in the town of Newhaven in the English county of East Sussex, for the treatment of up to 210,000 tonnes per annum of the county's municipal solid waste. The facility, built by Veolia Environmental Services, was approved by planners at the Conservative-controlled East Sussex County Council.[1]
The facility treats household waste that cannot be reused, composted or recycled and generates electricity from it. The electricity produced is sold to the National Grid and is enough to supply 25,000 homes. 88 tonnes of steam are produced per hour which is used to turn the generator and create electricity; the steam is cooled back into water and reused in a closed loop system.[2]
Construction
Construction of the facility began in April 2008 and was completed in late 2011. The facility became operational in 2012.[3] The building itself is Template:Cvt tall, but the chimneys are Template:Cvt tall.[4] It is the first of its kind to be built in the South Downs area and cost around £175 million to complete, including a unique ‘floating caisson’ which was used to house 20 metres of the plant underground and reduce the proposed height to meet planning requirements.[2]Template:R/superscript
See also
References
Page Template:Reflist/styles.css has no content.
- ^ Page Module:Citation/CS1/styles.css has no content."Provisional green light for Newhaven incinerator". letsrecycle.com. 21 February 2007. Archived from the original on 27 September 2007. Retrieved 19 October 2009.
- ^ a b Page Module:Citation/CS1/styles.css has no content."Industry Insight Tours – Newhaven ERF". Sustainable Business. Retrieved 18 January 2025.
- ^ Page Module:Citation/CS1/styles.css has no content."Newhaven Energy Recovery Facility".
- ^ Page Module:Citation/CS1/styles.css has no content."Behind the scenes at the Newhaven incinerator". The Argus. 5 July 2012. Retrieved 26 October 2022.
Lua error in mw.title.lua at line 404: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal'). Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found. Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.