REK Bitola

From Wikipedia, the free encyclopedia

Template:Short description

Page Module:Infobox/styles.css has no content.

REK Bitola
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
Script error: No such module "Infobox mapframe".
Script error: No such module "Infobox mapframe".
Official nameTemplate:If first display both
CountryTemplate:If first display both
LocationTemplate:If first display both
CoordinatesLua error: callParserFunction: function "#coordinates" was not found.
StatusOperational
Construction beganTemplate:If first display both
Commission dateTemplate:If first display both
Decommission dateTemplate:If first display both
Construction costTemplate:If first display both
Template:Pluralize from textTemplate:If first display both
Template:Pluralize from textTemplate:If first display both
EmployeesTemplate:If first display both
Geothermal power station
Min. source temp.Template:If first display both
WellsTemplate:If first display both
Max. well depthTemplate:If first display both
Hot water outputTemplate:If first display both
Nuclear power station
ReactorsScript error: No such module "WikidataIB".
Reactor supplierTemplate:If first display both
Solar farm
CollectorsScript error: No such module "WikidataIB".
Total collector areaTemplate:If first display both
Site resourceTemplate:If first display both
Thermal power station
Primary fuelTemplate:If first display both
Secondary fuelTemplate:If first display both
Tertiary fuelTemplate:If first display both
Tidal power station
Barrage heightTemplate:If first display both
Barrage lengthTemplate:If first display both
Barrage widthTemplate:If first display both
CrossesTemplate:If first display both
Channel speedTemplate:If first display both
Channel volumeTemplate:If first display both
Tidal rangeTemplate:If first display both
Wave power station
Water depthTemplate:If first display both
Distance from shoreTemplate:If first display both
Wind farm
Max. water depthTemplate:If first display both
Distance from shoreTemplate:If first display both
Hub heightTemplate:If first display both
Rotor diameterTemplate:If first display both
Rated wind speedTemplate:If first display both
Site areaTemplate:If first display both
Site elevationTemplate:If first display both
ChimneysTemplate:If first display both
Cooling towersTemplate:If first display both
Cooling sourcePage Template:Plainlist/styles.css has no content.
Feed-in tariffTemplate:If first display both
Annual revenueTemplate:If first display both
Thermal capacityTemplate:If first display both
Power generation
Script error: No such module "Infobox power station".
Nameplate capacityTemplate:If first display both
Capacity factorTemplate:If first display both
Annual net outputTemplate:If first display both
Storage capacityTemplate:If first display both
External links
WebsiteTemplate:If first display both
Commons[[Commons:Category:Script error: No such module "WikidataIB".|Related media on Commons]]
Template:Edit on Wikidata

Script error: No such module "Check for conflicting parameters".

Mining and Energy Combine Bitola (Template:Langx), abbr. MEC Bitola (РЕК Битола, REK Bitola) is an energy company in the city of Bitola, North Macedonia. Its main facility is located in the Novaci Municipality bordering Bitola.[1]

MEC Bitola operates both a coal (lignite) mine, called Suvodol coal mine, and a large coal power plant, situated about 12km from Bitola.

The power plant is the primary source of electrical power in North Macedonia, providing for 70% of the country's electricity production. The plant, which was built from 1982 to 1988, generates around 4.34 million megawatt hours of electricity per year.[2] It is regulated by the Balkan Environmental Regulatory Compliance and Enforcement Network (BERCEN).

History

Production at the plant began in 1980, with the excavation of tailings from the first BTO system (excavator, track, delayer), and the first kilowatt-hours of electricity were obtained in 1982 when the first of the three units of the power plant was put into operation. The production is enabled by three blocks whose power with the reconstruction in 1994 has increased by an additional 15 megawatts per block or for a total of 45 megawatts.

In 2009, the modernization of the turbines and generators of REK Bitola (performed by the Russian company "Silovie Machines") began, which was completed in 2013, which increased the installed capacity of 675 megawatt hours by 25 megawatt hours. At the same time, in 2011 an agreement was signed with the German company "Babkok Borsig" for revitalization of the boilers in order to extend the life of the thermal power plant for 120,000 working hours, but this project was not completed due to a dispute between the two parties. Although a loan of 80 million euros was provided for this project, ELEM terminated the contract with Babcock Borsig, so that the modernization of the boilers remained unfinished. Only, during 2012 and 2013, boilers 2 and 3 were modernized, reducing nitrogen oxide emissions, in accordance with EU environmental standards. However, this modernization did not achieve the planned increase in their capacity.

In 2023, REK Bitola thermal plant (TPP) was reconnected to the 233-megawatt grid after being in maintenance since 2020.[3]

Production

All this potential in REK Bitola enables over 70% participation of the plant in the total production of electricity in the power system. In 2005, the production of electricity in REK Bitola reached 5,007 gigawatt hours, but already in the following year the production dropped to 4,691 gigawatt hours, and the bottom was reached in 2015, when the production was only 3,138 gigawatt hours.

References

Page Template:Reflist/styles.css has no content.

  1. ^ Page Module:Citation/CS1/styles.css has no content.kgi-admin (2023-04-29). "Power plant profile: REK Bitola Energy Complex Solar PV Park, Macedonia". Power Technology. Retrieved 2023-08-09.
  2. ^ Page Module:Citation/CS1/styles.css has no content."The thermal power plant rek bitola (general information)" (PDF). Archived from the original (PDF) on 2011-03-04. Retrieved 2012-08-11.
  3. ^ Page Module:Citation/CS1/styles.css has no content."N. Macedonia's REK Bitola reconnects 233 MW unit to grid - report". seenews.com. Retrieved 2023-08-09.

Page Template:Stack/styles.css has no content.

Lua error in mw.title.lua at line 404: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

Template:Asbox Template:Asbox