Ring Rail Line

From Wikipedia, the free encyclopedia

Template:Short description

Page Module:Infobox/styles.css has no content.

Ring Rail Line
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
The Ring Rail Line. Dashed line indicates tunnel.
Overview
LocaleVantaa, Southern Finland
TerminiPage Template:Plainlist/styles.css has no content.
Stations5 (+ 3)
History
Opened1 July 2015
Technical
Line lengthScript error: No such module "ConvertIB".18 km (11 mi)
Track lengthScript error: No such module "ConvertIB".
Number of tracksDouble track
Track gauge1,524 mm (5 ft)
Minimum radiusScript error: No such module "ConvertIB".
Electrification25 kV @ 50 Hz
Operating speedScript error: No such module "ConvertIB".120 km/h (75 mph)
Highest elevationScript error: No such module "ConvertIB".
Route map
Ring Rail LinePage Template:Routemap/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Navbar/configuration' not found.

Script error: No such module "Check for conflicting parameters".

The Ring Rail Line (Template:Langx, Template:Langx; formerly Marjarata) is a railway route in the area of the city of Vantaa, in the Greater Helsinki Metropolitan Area of Finland. It connects Helsinki-Vantaa Airport and the adjacent Aviapolis business and retail district to the Helsinki commuter rail network. The line fills the gap between Vantaankoski and Tikkurila railway stations, travelling in tunnel underneath the airport.

The line started operating on 1 July 2015.

History

File:Paikallisjuna Louhelan rautatieasemalla; Myyrmäki, Vantaa, 1970-luku.jpg
A commuter train on line M at the Louhela railway station in the 1970s. The last commuter train on line M travelled on the rail on 30 June 2015, one day before the Ring Rail Line opened.[1]

The founding stone of the line was laid on 3 March 2009,[2] and construction was started on 13 May 2009 with the excavation of service tunnels. The excavation of a 300 m-long (980 ft) tunnel station under the airport was completed in March 2010, as the construction was proceeding on schedule.[3]

In February 2011, a video on the project's official website stated that the project would be open by June 2014. It announced various new details, including that the station at Tikkurila would be entirely rebuilt as an integrated travel centre, as well as details on the trains that would serve the airport.[4] In September 2012, the opening date was pushed back to July 2015, due to the unexpected need to re-design and reinforce the airport station tunnel to withstand the acidic products of propylene glycol decay by bacteria within the ground. Propylene glycol is used as a de-icing agent for the planes.[5][6]

The Ring Rail Line started operating on 1 July 2015. The station at the Helsinki Airport opened later, with the Tietotie entrance opening on 10 July and the direct connection to the terminal opening in December 2015.[7]

Route

File:P train to the airport.jpg
The P train (shown here) travels from central Helsinki to the airport via Myyrmäki and Martinlaakso in western Vantaa. The I train does the same via Tikkurila in eastern Vantaa.

The new line creates a connection from the airport to Helsinki Central railway station, as well as the suburban areas on the route. The new railway leaves the mainline going north from Helsinki after Tikkurila station in the east, travel via the airport and into Vantaankoski station to the west, joining the existing the branch line for western Vantaa which was previously served by the "M" train. Five new stations were built, with space reserved for three more in the future.[5][8]

The line is served by the "P" and "I" trains which travel the ring clockwise and anticlockwise respectively. The journey time from the airport to Helsinki Central Railway Station is 27 minutes ("P" train) or 32 minutes ("I" train), whilst the time to Tikkurila, to connect with long-distance trains going north or east, is 8 minutes. Both trains operate every 10 minutes in the daytime.[9]

Stations

File:Leinelän rautatieasema 2015-07-01.JPG
Leinelä, one of the new stations, in 2015.

In the first phase, five new stations were built at Vehkala, Kivistö, Aviapolis, Helsinki-Vantaa Airport and Leinelä. Out of these, the Aviapolis and Airport stations are located in a tunnel. Reservations have been made for three additional stations: Petas (surface), Viinikkala (tunnel) and Ruskeasanta (tunnel).

Cost

The projected cost of the construction is €655 million as of September 2012,[5] up from €605 million in March 2010.[3] The estimated cost of the project in December 2014 was €738.5 million.[10] The current estimated cost of the project is €773.8 million[10]

Future development

Separate proposals exist to extend the Helsinki Metro to the airport,[11] and to move long-distance services from the current main North-South corridor to a new railway between Pasila and Kerava, passing through the airport. This new route, known as Lentorata, would travel in a long tunnel under the airport and allow direct access from long-distance trains, as well as free the rail capacity taken up by long-distance traffic in the current main corridor for the increasing local commuter traffic.[12]

See also

References

Page Template:Reflist/styles.css has no content.

  1. ^ Karlsson, Stella: Viisi vuotta sitten lakkautetusta M-junasta on monella länsivantaalaisella muistoja – Museon tallenteista löytyy haikeutta: "Kyllä tuolla junalla tulee aina olemaan paikka meikäläisen sydämessä", Vantaan Sanomat 15 November 2020. Accessed on 13 April 2022.
  2. ^ Page Module:Citation/CS1/styles.css has no content."Laying of Ring Rail Linecornerstone in Vantaa today". Kehärata. 6 March 2009. Retrieved 6 February 2011.
  3. ^ a b Page Module:Citation/CS1/styles.css has no content."Vantaan Kehärata-projekti etenee kuin juna". YLE Helsinki. 17 March 2010. Archived from the original on 28 February 2011. Retrieved 6 February 2011.
  4. ^ Page Module:Citation/CS1/styles.css has no content."Kehärata". Archived from the original on 2 February 2010. Retrieved 6 February 2011.
  5. ^ a b c Page Module:Citation/CS1/styles.css has no content."Archived copy". Archived from the original on 2014-10-24. Retrieved 2012-09-06.{{cite web}}: CS1 maint: archived copy as title (link)
  6. ^ Page Module:Citation/CS1/styles.css has no content."Lentokentän juna-aseman seinästä tihkuu glykolia – sama aine viivästytti kehärataa vuodella - Kehärata - Kaupunki - Helsingin Sanomat". Archived from the original on 2015-08-22.
  7. ^ Page Module:Citation/CS1/styles.css has no content."Ring Rail Line opens to traffic on 1 July – travel to the airport via the Aviapolis station". HSL. 25 June 2015. Archived from the original on 2 March 2019. Retrieved 1 July 2015.
  8. ^ Page Module:Citation/CS1/styles.css has no content."Kehäradan reitti ja asemat". Kehärata. Retrieved 6 February 2011.
  9. ^ Page Module:Citation/CS1/styles.css has no content."Ring Rail Line trains will stop at all stations". HSL. 14 April 2015. Archived from the original on 4 March 2016. Retrieved 1 July 2015.
  10. ^ a b Page Module:Citation/CS1/styles.css has no content."Liikennevirasto: Kehärata". Liikennevirasto. Archived from the original on 2011-09-15. Retrieved 2012-09-06.
  11. ^ Page Module:Citation/CS1/styles.css has no content."Lentokenttämetro, Toiminnalliset tarkastelut" (PDF). Helsinki Regional Transport Authority. 2006. p. 3. Retrieved 13 January 2016.
  12. ^ Page Module:Citation/CS1/styles.css has no content."Lentoaseman kaukoliikennerata, Ratayhteysselvitys" (PDF). Finnish Transport Agency. 2010. p. 7. Archived from the original (PDF) on 4 March 2016. Retrieved 13 January 2016.

Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.

[[Category:Template:Resolve category redirect]]Template:Coord missing/CheckCat Template:Railway lines in Finland