SR W class

From Wikipedia, the free encyclopedia

Template:Short description Template:DMCA Template:DMCA

Page Module:Infobox/styles.css has no content.

SR Class WLua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
No. 31918 (first batch built June 1935) at Norwood Junction Locomotive Depot 12 March 1960
Page Module:Infobox/styles.css has no content.
Type and origin
Power typeSteam
DesignerRichard Maunsell
BuilderPage Template:Plainlist/styles.css has no content.
Build date1930-1936
Total produced15
Page Module:Infobox/styles.css has no content.
Specifications
Configuration:
 • Whyte2-6-4T
 • UIC1′C2′ h3t
GaugePage Template:Fraction/styles.css has no content.4 ft 8+12 in (1,435 mm) standard gauge
Leading dia.3 ft 1 in (0.940 m)
Driver dia.5 ft 6 in (1.676 m)
Trailing dia.3 ft 1 in (0.940 m)
Length44 ft 0.25 in (13.42 m)
Loco weight90 long tons 14 cwt (203,200 lb or 92.2 t)
92.2 t; 101.6 short tons
Fuel typeCoal
Fuel capacity3 long tons 10 cwt (7,800 lb or 3.6 t)
3.6 t; 3.9 short tons
Water cap.2,000 imp gal (9,100 L; 2,400 US gal)
Boiler pressure200 psi (1.38 MPa)
Cylinders3
Cylinder sizePage Template:Fraction/styles.css has no content.16+12 in × 28 in (419 mm × 711 mm)
Page Module:Infobox/styles.css has no content.
Performance figures
Tractive effort29,452 lbf (131.01 kN)
Page Module:Infobox/styles.css has no content.
Career
OperatorsPage Template:Plainlist/styles.css has no content.
ClassSR: W
Power classBR: 5F, later 6F
NumbersPage Template:Plainlist/styles.css has no content.
  • SR: 1911–1925
  • BR: 31911–31925
LocaleSouthern Region
Withdrawn1963–1964
DispositionAll scrapped

The SR Class W were 3-cylinder 2-6-4T tank engines designed in 1929 by Richard Maunsell for use on the Southern Railway. They were introduced in 1932 and constructed at Eastleigh and Ashford. The class was intended for short distance, inter-company/regional freight traffic transfer in London, and were standardised with parts from the N, N1, U and U1 classes.

Background

From the 1920s London was surrounded by a number of large freight Marshalling yards, where long-distance freight trains were brought and re-organised into new trains for onward transmission to their destinations. Three of these yards, at Feltham, Norwood and Hither Green, were operated by the Southern Railway. The requirement for a fast freight transfer locomotive between these yards, and across London to other railway yards, provided a challenge for Richard Maunsell. The electrified suburban lines were busy with commuter traffic which took priority over freight workings, and the London network abounded with junctions and signal stops. The design brief called for a powerful locomotive with good acceleration and adhesion:Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. one that was able to climb the steep gradients over the flying junctions that were to be found all over the Southern Railway's London network. The ability to operate over tight curves and be able to pull away from a standstill on the aforementioned gradients were also key considerations that needed to be incorporated into the design.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. A tank locomotive design was also preferable since the journeys were relatively short, and the work would involve frequent changes in direction.

Design

The SR Z class was considered at first, but due to the specialist characteristics of the design as a yard engine for marshalling freight, they were not deemed fit for the purpose of hauling loads under the tight timings of London's railway system. The solution was a smaller wheeled version of the ill-fated K1 River class tank engines, with three cylinders to allow for better acceleration and three sets of Walschaerts valve gear.[i] The resultant W class was designed in 1929.

As a result of the rebuilding of the K1 class following the Sevenoaks railway accident, surplus bogies and leading wheels were available for the new design. A Cartazzi axle was used for the leading pair of wheels rather than a swivelling pony truck. The 2-6-4 wheel arrangement was settled upon as being ideal for intensive suburban routes, and the use of parts from the K Class and the same boiler as used on the N, N1 and U1 classes enabled the standardisation of Southern locomotives to continue.[1] The locomotives were provided with heavy braking equipment in order to handle the trains of freight wagons with or without continuous brakes that were in use at the time. With this in mind the class was (unusually) provided with extra braking on the bogie wheels.[1]

Construction history

An initial order was placed with Eastleigh railway works for ten locomotives, with the frames to be constructed at Ashford railway works and the boilers at Brighton railway works.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. However, by the time that Ashford had delivered the first five sets of frames in early 1930 a severe trade recession meant that they were no longer needed. The frames were stored and the boilers used as spares for the N and U class locomotives.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. By mid 1931 trade had recovered to allow construction of the initial five to be completed. These were delivered during January and February 1932. The components for the remaining five locomotives still on order were gathered at Eastleigh during 1932, but once again their construction was delayed pending a more sustained economic recovery, and the boilers were used elsewhere.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found. A second batch consisting of these five locomotives together with a further five ordered in March 1930 were eventually delivered between April 1935 and April 1936.[2] Eastleigh works was then committed to the construction of the Schools class and so the order was transferred to Ashford.

Variations

W class 2-6-4T Nº 31921 (2nd batch) on Stewarts Lane Locomotive Depot 15 February 1958.

The two batches differed from each other because the Eastleigh batch had gravity sanding capability and steam regulators on the right hand side, whilst the Ashford batch had steam sanding and regulators on the left, as was common on most other classes of Southern locomotives.

Modifications

The first batch was modified between 1959 and 1960 to incorporate steam sanding, as this was already present on the Ashford batch. The right hand driving, however, remained.[1]

Livery and numbering

Southern

The first batch was turned out in black livery with green lining, and were numbered 1911–1915 with 'Southern' in yellow on the water tanks. The Ashford batch was outshopped in unlined black livery, and the initial batch were also converted to this new livery. These locomotives were numbered 1916–1925.

Post-1948 (nationalisation)

The locomotives retained their freight black liveries, and the BR crest was placed on the water tank sides. Numbering was per the BR standard numbering system, in the range 31911–31925.[3][page needed]

Operational details

The class was mainly used around London working from Hither Green, Norwood and Feltham yards. They were also used on inter-company/regional transfer freight duties over the West London Line to Old Oak Common, Willesden, Cricklewood and Ferme Park marshalling yards.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.

The class was generally well liked by their crews apart from the fact that the driver was on the right hand side of the Eastleigh batch, which made accurate stopping difficult when signalling was predominantly on the left on the Southern network.[4][page needed] This would have meant that the fireman was frequently utilised as lookout on the left hand side.

In 1948 there was a chronic shortage of large passenger tank locomotives on the un-electrified lines of the former London Brighton and South Coast Railway. As a result, trials of the class were made with passenger stock between Victoria railway station and Tunbridge Wells West railway station via the Oxted Line. However, like the K and K1 classes the W class were found to be unstable at speed and were banned from use on passenger trains.Lua error in package.lua at line 80: module 'Module:Footnotes/anchor_id_list' not found.

Withdrawal

The class began to be withdrawn from service in 1963, with the last removed from the books in 1964. No examples of this class of locomotive survived into preservation.

Table of withdrawals
Year Quantity in
service at
start of year
Quantity
withdrawn
Locomotive numbers
1963 15 10 31911/15–16/18–23/25.
1964 5 5 31912–14/17/24.

References

Page Template:Reflist/styles.css has no content.

  1. ^ The three cylinder K1s had used Holcroft's conjugated valvegear to drive three cylinders from just two sets of Walschaerts gear.


Page Template:Reflist/styles.css has no content.

  1. ^ a b c Page Module:Citation/CS1/styles.css has no content."Maunsell W class 2-6-4T". Southern E-Group. 2004. Retrieved 20 April 2007.
  2. ^ Page Module:Citation/CS1/styles.css has no content.Railway Magazine. 70 (152). 1932. {{cite journal}}: Missing or empty |title= (help)[full citation needed] For information on the introduction of the class in 1932.
  3. ^ Page Module:Citation/CS1/styles.css has no content.Ian Allan ABC of British Railways Locomotives (Winter 1958–59 ed.).
  4. ^ Page Module:Citation/CS1/styles.css has no content.Reflections on Southern Steam. Strathwood, Boat of Garten.[full citation needed]

Page Template:Refbegin/styles.css has no content.

Page Module:Side box/styles.css has no content.Page Template:Sister project/styles.css has no content.

Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.