Sandringham line

From Wikipedia, the free encyclopedia

Template:Short description Template:DMCA Template:DMCA

Page Module:Infobox/styles.css has no content.

Sandringham line
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found.
An Alstom Comeng train operating a Sandringham service at Middle Brighton station, February 2026
Overview
Service typeCommuter rail
SystemMelbourne railway network
StatusOperational
LocaleMelbourne, Australia
PredecessorPage Template:Plainlist/styles.css has no content.
  • Windsor – North Brighton (1859–1860)
  • Princes Bridge – Cremorne (1859–1860)
  • Princes Bridge – North Brighton (1860–1861)
  • Brighton Beach (1861–1887)
First service19 December 1859; 166 years ago (1859-12-19)
Current operatorTemplate:Pluralize from textMetro Trains
Former operatorTemplate:Pluralize from textPage Template:Plainlist/styles.css has no content.
Route
TerminiFlinders Street
Werribee or Williamstown
Stops14
Distance travelled18.090 km (11.241 mi)
Average journey time30 minutes
Service frequency

After Mid 2026
LineTemplate:Pluralize from text usedSandringham
Technical
Rolling stockComeng, Siemens
Track gauge1,600 mm (5 ft 3 in)
Electrification1500 V DC overhead
Track ownerTemplate:Pluralize from textVicTrack
Page Module:Infobox/styles.css has no content.

Script error: No such module "Parameter validation".Script error: No such module "Check for conflicting parameters".

The Sandringham line is a commuter railway line in the city of Melbourne, Australia.[1] Operated by Metro Trains Melbourne, it is the city's fourth shortest metropolitan railway line at 17.9 kilometres (11.1 mi). The line runs from Flinders Street station in central Melbourne to Sandringham station in the south-east, serving 14 stations via South Yarra, Balaclava, Elsternwick, and Brighton.[2] It operates from approximately 5am to 12am, daily, with 24 hour service available on Friday and Saturday nights.[3] Trains on the Sandringham line run as six car formations, composed of two three-car sets of Comeng or Siemens Nexas trainsets.[4]

Sections of the Sandringham line opened as early as 1859, with the line fully extended to Sandringham in 1887. A limited number of stations were operational when the line first opened, with infill stations progressively constructed between 1860 and 1912.[5] The line was built to connect Melbourne with the suburbs of Balaclava, Elsternwick, Brighton, and Sandringham, amongst others. Minor upgrades have occurred since its opening, including historical level crossing removal works and regular infrastructure upgrades.[6]

History

19th century

The Melbourne and Suburban Railway Company opened their line from Princes Bridge (later amalgamated with Flinders Street station) to a temporary station on Punt Road in February 1859, then to Cremorne (now closed) in December of that year. Shortly after, the St Kilda and Brighton Railway Company opened their railway line from St Kilda to Bay Street (now North Brighton) in December 1859. Twelve months after that, the Melbourne and Suburban Railway Company extended their line from Cremorne to Chapel Street (now Windsor) station, on the St Kilda and Brighton Railway Company's line, providing a second route to the city from the Brighton line. The following year, again in December, the St Kilda and Brighton Railway Company extended their line to Beach (now Brighton Beach).

The link between St Kilda and Windsor, disused since 1862, was dismantled in 1867, although part of it at the Windsor end was used as a siding for some time afterwards. In 1865, the Melbourne and Hobson's Bay Railway Company, who owned the St Kilda line, purchased the Melbourne Suburban Railway Company and became the Melbourne and Hobson's Bay United Railway Company, and subsequently bought the St Kilda and Brighton Railway Company, which was in financial difficulties, for £99,500. The Victorian Government acquired the United railway company in July 1878.

In September 1887, the Brighton line was extended to Sandringham.

20th century

Old signals with a level crossing in the background
The new signalling system present at Windsor station, 1918

The Sandringham line became the first line in the state of Victoria to be provided with automatic signals, with the line as far as Elsternwick converted in stages from 1915 to 1918. Then in 1919, the Sandringham line became, with the line to Essendon, the first line in the country to be electrified (apart from a test installation on the Flemington Racecourse line).[7] Automatic signalling was provided the rest of the way to Sandringham in two stages in during 1926.[7]

When the underground City Loop line was designed, it was not intended to cater for trains on the Port Melbourne, St Kilda, and Sandringham lines. However, a crossover was installed near Richmond to allow Sandringham trains to cross to the tracks used by the Frankston, Pakenham, and Cranbourne line trains, which had access to the underground loop. In 1985, two Sandringham trains each way were altered to run via the underground loop, and in 1987, with the Port Melbourne and St Kilda lines converted to light rail operation, all off-peak and many peak trains were routed via the underground loop.[citation needed] The commencement of operations involved the service stopping at three new stations—Parliament, Melbourne Central (formally Museum), and Flagstaff.[8] The Loop follows La Trobe and Spring Streets along the northern and eastern edges of the Hoddle Grid.[9] The Loop connects with Melbourne's two busiest stations, Flinders Street and Southern Cross, via the elevated Flinders Street Viaduct.[9] This would be until 1996 when timetable changes saw the Sandringham line taken out of the City Loop on weekdays and instead began running direct to and from Flinders Street. All weekend services still ran via the loop at this time.[10]

21st century

Sandringham station in August 2025

In 2021, the metropolitan timetable underwent a major rewrite, resulting in all Sandringham line trains terminating at Flinders Street without operating through the City Loop.[11]

With the opening of the Metro Tunnel, corridor reorganisation of the Melbourne rail network was completed, with the Sandringham line through-running services to Werribee and Williamstown for the first time.[12]

Stage 4 of the Network Development Plan – Metropolitan Rail proposed that the Upfield and Sandringham lines be joined via a reconfigured City Loop sometime in the 2030s.[13]

Network and operations

Services

Services on the Sandringham line operates from approximately 5:00am to 12:00am (midnight) daily and all night on Friday and Saturday nights.[14] Services run every 7–8 minutes during peak hour, with services running every 15 minutes during the inter-peak period on weekdays, and every 20 minutes at night and during the day on weekends (with the exception of early Sunday mornings when services run every 40 minutes until 10:00am). Additionally, services run every 60 minutes overnight on Friday and Saturday nights as part of the Night Network.[3] Services don't run via the City Loop, instead they run direct to Flinders Street.[15]

As of December 2024, one express train operates during weekdays on the Sandringham line. This being the 6:05pm Flinders Street service from Sandringham.

From late April 2026, services on the Sandringham line will through run with the Werribee and Williamstown lines instead of terminating at Flinders Street.

Stopping patterns

Legend — Station status

  • Premium Station – Station staffed from first to last train
  • Host Station – Usually staffed during morning peak, however this can vary for different stations on the network.

Legend — Stopping patterns
Services do not operate via the City Loop

  • ● – All trains stop
  • ◐ – Some services do not stop
  • ▲ – Only inbound trains stop
  • | – Trains pass and do not stop

Select services continue beyond Flinders Street to Werribee.

colspan="5" style="background:#Template:Rcr;" |Sandringham Services[16]
Station Zone Local Ltd Express Middle Brighton
Flinders Street 1
Richmond
South Yarra
Prahran
Windsor
Balaclava
Ripponlea
Elsternwick
Template:Htxt Gardenvale |
North Brighton 1/2 |
Middle Brighton |
Brighton Beach |
Template:Htxt Hampton 2 |
Sandringham

Operators

The Sandringham line has had a total of 11 operators since its opening in 1859. The line was initially operated by the Melbourne and Suburban Railway Company, the St Kilda and Brighton Railway Company, the Melbourne Railway Company, and the Melbourne and Hobson's Bay Railway Company over the course of 19 years from 1859 till nationalisation in 1878. The majority of operations throughout its history have been government run: from 1878 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line.[17] These operators, Victorian Railways, the Metropolitan Transit Authority, the Public Transport Corporation and Bayside Trains have a combined operational length of 121 years.[17]

Bayside Trains was privatised in August 1999 and later rebranded M>Train. In 2002, M>Train was placed into receivership and the state government regained ownership of the line, with KPMG appointed as receivers to operate M>Train on behalf of the state government.[18][19][20] Two years later, rival train operator Connex Melbourne took over the M>Train operations including the Sandringham line. Metro Trains Melbourne, the current private operator, then took over the operations in 2009. These private operators have had a combined operational period of 27 years.[21]

Past and present operators of the Sandringham line:
Operator Assumed operations Ceased operations Length of operations
Melbourne and Suburban Railway Company* 1859 1862 3 years
St Kilda and Brighton Railway Company*
Melbourne Railway Company 1862 1865 3 years
Melbourne and Hobson's Bay Railway Company 1865 1878 13 years
Victorian Railways 1878 1983 105 years
Metropolitan Transit Authority 1983 1989 6 years
Public Transport Corporation 1989 1998 9 years
Bayside Trains (government operator) 1998 1999 1 years
M>Train 1999 2004 5 years
Connex Melbourne 2004 2009 5 years
Metro Trains Melbourne 2009 incumbent 16 years (ongoing)

*Operated part of the route

Route

Template:Sandringham LineTemplate:MaplinkPage Module:Infobox/styles.css has no content.

Sandringham (physical track)
Overview
StatusOperational with passenger services from Flinders Street to Sandringham
OwnerPage Template:Plainlist/styles.css has no content.
LocaleMelbourne, Victoria, Australia
TerminiPage Template:Plainlist/styles.css has no content.
Connecting linesAll metropolitan and Bairnsdale/Traralgon
StationsPage Template:Plainlist/styles.css has no content.
  • 14 current stations
  • 2 former stations
Service
ServicesSandringham
History
CommencedScript error: No such module "Date time".
OpenedPage Template:Plainlist/styles.css has no content.
  • Princes Bridge to Richmond on Script error: No such module "Date time".
  • Richmond to Cremorne on Script error: No such module "Date time".
  • Windsor to North Brighton on Script error: No such module "Date time".
  • Cremorne to Windsor on Script error: No such module "Date time".
  • Flinders Street to Princes Bridge on Script error: No such module "Date time".
  • North Brighton to Brighton Beach on Script error: No such module "Date time".
  • Brighton Beach to Sandringham on Script error: No such module "Date time".
CompletedScript error: No such module "Date time".
ElectrifiedScript error: No such module "Date time".
Technical
Line lengthScript error: No such module "ConvertIB".
Track lengthScript error: No such module "ConvertIB".
Number of tracksPage Template:Plainlist/styles.css has no content.
  • Twelve tracks: Flinders Street to Richmond
  • Six tracks: Richmond to South Yarra
  • Double track: South Yarra to Sandringham
Track gauge1,600 mm (5 ft 3 in)
Minimum radiusScript error: No such module "ConvertIB".
Electrification1500 V DC overhead
Operating speedScript error: No such module "ConvertIB".70 km/h (43 mph)
SignallingAutomatic block signalling
Highest elevationScript error: No such module "ConvertIB".
Maximum inclineTemplate:Incline

Script error: No such module "Check for conflicting parameters".

The Sandringham line forms a somewhat linear route with minor curves from the Melbourne central business district to its terminus in Sandringham. The route is 17.9 kilometres (11.1 mi) long and is predominantly doubled tracked, however between Flinders Street station and Richmond, the track is widened to 12 tracks, narrowing to 6 tracks between Richmond and South Yarra before again narrowing to 2 tracks between South Yarra and Sandringham.[22] After departing from its terminus at Flinders Street, the Sandringham line traverses mainly flat country with few curves and fairly minimal earthworks for most of the line. However, sections of the line have been elevated or lowering into a cutting to eliminate level crossings.[6] Despite historical removals, there are numerous level crossings still present on the line with no current plans to remove them.[23]

The line follows the same alignment as the Cranbourne, Pakenham, and Frankston lines with the four services splitting onto different routes at South Yarra. The Sandringham line continues on its south eastern alignment, whereas the Cranbourne, Pakenham, and Frankston lines takes an eastern alignment towards their final destinations.[24] From Balaclava, the line is never more than ~2 kilometres (1.2 mi) from the eastern shore of Port Phillip. All of the rail line goes through built-up suburbs towards its terminus in Sandringham.[24]

Stations

The line serves 14 stations across 17.9 kilometres (11.1 mi) of track. The stations are a mix of elevated, lowered, and ground level designs. The majority of stations are at ground level, with elevated or lowered stations constructed in conjunction with historical level crossing removals works.[25]

Station Image Accessibility Opened Terrain Train connections Other connections
Flinders Street Yes—step free access 1854[5] Lowered Trams Buses
Richmond No—steep ramp 1859[5] Elevated Trams Buses
South Yarra 1860[5] Lowered
1 connection
Trams
Prahran Yes—step free access 1860[5] Ground level
Windsor No—steep ramp 1859[5]
Balaclava Yes—step free access Elevated
Ripponlea File:Ripponlea railway station Platform 2 (south-eastern view)(28 February 2026).jpg 1912[5] Ground level Trams Buses
Elsternwick File:Elsternwickwinter.jpg 1859[5] Lowered Trams Buses Buses
Gardenvale File:Gardenvale Southbound View b.jpg No—steep ramp 1906[5] Elevated Buses
North Brighton File:North Brighton railway station Platform 1 (southern view)(21 March 2026).jpg Yes—step free access 1859[5] Ground level Buses Buses
Middle Brighton File:Middle Brighton railway station Platform 1 (south-western view)(28 February 2026).jpg 1861[5] Buses
Brighton Beach File:Brighton Beach2026.jpg
Hampton File:Hampton Railway Station b.jpg 1887[5]
Sandringham File:Sandringham railway station main entrance and building (9 October 2025) (cropped).jpg
Station Histories
Station Opened[26] Closed[26] Age Notes[26]
Parliament Template:TAC2
  • Not a stop since 2021
Melbourne Central Template:TAC2
  • Formerly Museum[26]
  • Not a stop since 2021
Flagstaff Template:TAC2
  • Not a stop since 2021
Southern Cross Template:TAC2
  • Formerly Batman's Hill
  • Formerly Spencer Street
  • Not a stop since 2021
Flinders Street Template:TAC2
  • Formerly Melbourne Terminus
Princes Bridge Template:TAC2
Template:TAC2
Botanic Gardens Template:TAC2
Punt Road Template:TAC2
  • Replaced by Swan Street (200m further along line)
Richmond Template:TAC2
  • Formerly Swan Street
Cremorne Template:TAC2
South Yarra Template:TAC2
  • Formerly Gardiner's Creek Road
Prahran Template:TAC2
  • Formerly Greville Street
Windsor Template:TAC2
  • Formerly Chapel Street
Balaclava Template:TAC2
Ripponlea Template:TAC2
Elsternwick Template:TAC2
Gardenvale Template:TAC2
North Brighton Template:TAC2
  • Formerly Bay Street
Middle Brighton Template:TAC2
  • Formerly Church Street
Brighton Beach Template:TAC2
  • Formerly Beach
Hampton Template:TAC2
  • Formerly Hampton
  • Formerly Retreat
Sandringham Template:TAC2

Infrastructure

Rolling stock

Script error: No such module "Labelled list hatnote".

File:Siemens Nexas 711M up Sandringham service at Balaclava railway station (28 February 2026).jpg
Siemens Nexas trains are widely used across the Sandringham line.

The Sandringham line uses two different types of electric multiple unit (EMU) trains that are operated in a split six-car configuration. The primary rolling stock featured on the line is the Comeng EMUs contain three doors per side on each carriage and can accommodate up to 556 seated passengers in each six-car configuration.[27] These trains were originally built between 1981 and 1988 and were later refurbished by Alstom & EDi Rail between 2000 and 2003 and UGL Rail between 2017 and 2021. Since 2021, Comeng EMUs are progressively being retired as new rolling stock is introduced to the rail network.[28] The second type of rolling stock is the Siemens Nexas EMUs contain two doors per side on each carriage and can accommodate up to 432 seated passengers in each six-car configuration.[29] The trains were originally built between 2002 and 2005 with a total of 72 three-car sets constructed.[30]

Alongside the passenger trains, Sandringham line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.[31] Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains, and the Southern Shorthaul Railroad.[31]

Former rolling stock

When the line was electrified, the Sandringham line initially used a fleet of Swing Door and Tait EMUs. Until the 2000s, the line generally used all types of EMUs operating in Melbourne.

From 1982, as the Comeng EMUs entered service, the remaining Tait stock were cascaded onto the Sandingham line, as well as on the Port Melbourne and St Kilda lines as they were banned from running in the City Loop. At the same time, the refurbished Harris trains were put into service on those said three lines. From 1991, the line went back to using the regular Hitachi and Comeng trains until its displacement with the Siemens EMU.

Hitachi EMUs were removed from the line in December 2013.

Accessibility

In compliance with the Disability Discrimination Act of 1992, all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.[32] The majority of stations on the corridor are fully accessible, however, there are some stations that haven't been upgraded to meet these guidelines.[33] These stations do feature ramps, however, they have a gradient greater than 1 in 14.[33] Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.[33] These stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.[33][34]

Individual upgrade projects designed around improving station accessibility have occurred in recent years, with works making significant strides in improving network accessibility, with more than 71% of Sandringham line stations classed as fully accessible.[35]

Signalling

The Sandringham line uses three position signalling which is widely used across the Melbourne train network.[36] Three position signalling was first introduced in 1915, with the final section of the line converted to the new type of signalling in 1926.[37] The Sandringham line was the first line in Victoria to be equipped with this technology and was also the first (along with part of the Craigieburn line) to have a regular electric service.[38]

References

Page Template:Reflist/styles.css has no content.

  1. ^ Page Module:Citation/CS1/styles.css has no content."Sandringham Line". Public Transport Victoria. Archived from the original on 7 September 2018. Retrieved 16 February 2023.
  2. ^ Page Module:Citation/CS1/styles.css has no content."Metro's paper timetables mess". Daniel Bowen. 3 September 2017. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  3. ^ a b Page Module:Citation/CS1/styles.css has no content."New timetable train line information – Public Transport Victoria". 1 March 2021. Archived from the original on 1 March 2021. Retrieved 18 December 2022.
  4. ^ Page Module:Citation/CS1/styles.css has no content.Carey, Adam (7 November 2014). "Trains are working better but seating not guaranteed". The Sydney Morning Herald. Archived from the original on 6 February 2023. Retrieved 6 February 2023.
  5. ^ a b c d e f g h i j k l Page Module:Citation/CS1/styles.css has no content."What year did your railway station open? | Public Transport Users Association (Victoria, Australia)". 3 August 2018. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  6. ^ a b Page Module:Citation/CS1/styles.css has no content.Wong, Marcus (10 May 2021). "Level crossing removals in 1920s Melbourne". Waking up in Geelong. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  7. ^ a b Fisher, Peter (2007). Victorian Signalling: by Accident or Design?. Australian Railway Historical Society (Victorian Division). Template:Isbn
  8. ^ Page Module:Citation/CS1/styles.css has no content."City Loop closure". Public Transport Victoria. Archived from the original on 14 January 2023. Retrieved 14 January 2023.
  9. ^ a b Page Module:Citation/CS1/styles.css has no content."Guide to navigating the City Loop | Public Transport Users Association (Victoria, Australia)". Archived from the original on 12 December 2022. Retrieved 14 January 2023.
  10. ^ Page Module:Citation/CS1/styles.css has no content."Melbourne public transport – Significant service changes". Daniel Bowen. 23 April 2015. Retrieved 13 November 2025.
  11. ^ Page Module:Citation/CS1/styles.css has no content."New timetable train line information". Public Transport Victoria. Archived from the original on 4 February 2021. Retrieved 31 January 2021.
  12. ^ Page Module:Citation/CS1/styles.css has no content.Planning, Department of Transport and Planning. "Transport strategies and plans". dtp.vic.gov.au. Archived from the original on 12 February 2023. Retrieved 7 February 2023.
  13. ^ Page Module:Citation/CS1/styles.css has no content."Growing Our Rail Network 2018–2025". Public Transport Victoria. Archived from the original on 12 August 2019. Retrieved 8 February 2023.
  14. ^ Page Module:Citation/CS1/styles.css has no content."More Melburnians could hop on a train or tram every 10 minutes under ambitious Greens proposal". ABC News. 22 August 2022. Archived from the original on 17 December 2022. Retrieved 18 December 2022.
  15. ^ Page Module:Citation/CS1/styles.css has no content."Growing Our Rail Network 2018–2025". Public Transport Victoria. Archived from the original on 12 August 2019. Retrieved 6 February 2023.
  16. ^ Page Module:Citation/CS1/styles.css has no content."Sandringham Line". Public Transport Victoria. Archived from the original on 20 December 2022. Retrieved 26 December 2022.
  17. ^ a b "Melbourne's Rail Network to be Split" Railway Digest November 1997 page 12
  18. ^ National Express walks out of Australian rail service The Daily Telegraph (London) 17 December 2002
  19. ^ Receivers take over train, tram group The Age 24 December 2002
  20. ^ Victorian passenger services get new managers Rail Express 28 January 2003
  21. ^ Page Module:Citation/CS1/styles.css has no content.Cooper, Mex (25 June 2009). "New train, tram operators for Melbourne". The Age. Archived from the original on 1 January 2023. Retrieved 1 January 2023.
  22. ^ Page Module:Citation/CS1/styles.css has no content.Carey, Adam (4 June 2015). "Multimillion-dollar Richmond railway station revamp in limbo". The Age. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  23. ^ Page Module:Citation/CS1/styles.css has no content.Anderton, Gary (20 November 2020). "Key level crossing removals must feature in this year's State Budget – Michael O'Brien MP, Member for Malvern". Michael O'Brien MP. Archived from the original on 15 February 2023. Retrieved 15 February 2023.
  24. ^ a b Page Module:Citation/CS1/styles.css has no content.Wray, Tyson (19 January 2017). "Melbourne's train lines definitively ranked from best to worst". Time Out Melbourne. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  25. ^ Page Module:Citation/CS1/styles.css has no content.Woodcock, Ian; Stone, John (2016). "The Benefits Of Level Crossing Removals. Lessons from Melbourne's historical experience" (PDF). p. 18. Archived (PDF) from the original on 9 January 2023. Retrieved 9 January 2023.
  26. ^ a b c d Template:Anderson-All Stations
  27. ^ Page Module:Citation/CS1/styles.css has no content."VICSIG". vicsig.net. Retrieved 1 September 2023.
  28. ^ Page Module:Citation/CS1/styles.css has no content.Thum, Max (25 November 2021). "Comeng… Retirement Plans". The Gauge - Archived. Retrieved 1 September 2023.
  29. ^ Train Franchise Agreement Volume 2 Script error: No such module "webarchive". Public Transport Victoria
  30. ^ Page Module:Citation/CS1/styles.css has no content."Media Release: New Train Hits the Tracks". Minister for Public Transport. 4 October 2005. Archived from the original on 31 August 2007.
  31. ^ a b Page Module:Citation/CS1/styles.css has no content."NETWORK SERVICE PLAN | Addenda". 1 February 2011. Archived from the original on 7 March 2011.
  32. ^ Page Module:Citation/CS1/styles.css has no content."Accessibility – Public Transport Ombudsman Victoria". www.ptovic.com.au. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
  33. ^ a b c d Page Module:Citation/CS1/styles.css has no content."Station accessibility features". Metro Trains Melbourne. 2023. Archived from the original on 8 December 2022. Retrieved 3 January 2023.
  34. ^ Page Module:Citation/CS1/styles.css has no content."Accessing public transport". City of Melbourne. n.d. Archived from the original on 6 December 2022. Retrieved 3 January 2023.
  35. ^ Page Module:Citation/CS1/styles.css has no content."Left behind: the fight for accessible public transport in Victoria". the Guardian. 12 June 2022. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
  36. ^ Page Module:Citation/CS1/styles.css has no content."A walk around Gunning". vrhistory.com. Archived from the original on 15 August 2022. Retrieved 7 February 2023.
  37. ^ Page Module:Citation/CS1/styles.css has no content."National Code 3-Position Speed Signalling" (PDF). Archived (PDF) from the original on 7 February 2023. Retrieved 12 February 2023.
  38. ^ Page Module:Citation/CS1/styles.css has no content."Safety First on line for Passengers | Kingston Local History". localhistory.kingston.vic.gov.au. Archived from the original on 12 February 2023. Retrieved 12 February 2023.

Template:Victorian Railway Lines Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.