Trinity Health Arena
Template:Short description Template:DMCA
Page Module:Infobox/styles.css has no content.
| Lua error in Module:Location_map at line 526: Unable to find the specified location map definition: "Module:Location map/data/Michigan" does not exist. | |
| Script error: No such module "Infobox mapframe". | |
Former names | L. C. Walker Arena (1960–2019) |
|---|---|
| Location | 470 W Western Ave, Muskegon, Michigan 49440 |
| Coordinates | Lua error: callParserFunction: function "#coordinates" was not found. |
| Capacity | Hockey: 4,000 Basketball: 4,900 Concerts: 5,200 |
| Surface | Multi-surface |
| Construction | |
| Groundbreaking | 1958 |
| Opened | October 27, 1960 |
| Renovated | 2010,2016-2019,2020-2022 |
Construction cost | $2 million ($10.9 million in Template:Inflation-year dollarsTemplate:Inflation-fn) |
| Architect | Ralph Legeman Associates[1] |
| Tenants | |
| Muskegon Zephyrs/Mohawks/Lumberjacks (IHL) (1960–1992) Michigan Mayhem (CBA) (2004–2006) Muskegon Thunder (CIFL) (2007–2009) Muskegon Fury/Lumberjacks (IHL) (2007–2010) Muskegon Lumberjacks (USHL) (2010–present) West Michigan Ironmen (AIF/CIF/MPIF/AAL/APFL/GLAF) (2016–present) Muskegon Risers SC (PASL/M2) (2016–2019) | |
Script error: No such module "Check for conflicting parameters".
The Trinity Health Arena (formerly the L.C. Walker Arena) is a 5,200-seat multi-purpose arena in Muskegon, Michigan, United States. It was built in 1960 in partnership with philanthropist and industrialist Louis Carlisle Walker at a cost of $2 million, and on October 27, 1960, was formally gifted to the City of Muskegon. Mr. Walker provided $1 million and the City provided $1 million toward the cost. It is currently home to the Muskegon Lumberjacks of the United States Hockey League, and the West Michigan Ironmen indoor football team. The Arena will change its name to Trinity Health Arena after a corporate decision to rename Mercy Health facilities Trinity Health.[2]
The arena was built on a site of a former supermarket, and in addition to sports is also used for concerts, trade shows, conventions and other events. The arena measures 39 feet (12 m) from the arena floor to the ceiling. The arena contains 17,000 square feet (1,600 m2) of arena floor space, and can seat up to 4,000 for basketball, up to 4,500 for concerts, and 3,500 for ice shows and wrestling. The Arena has gone through several renovations, with the most recent occurring in 2018. The renovation included removing seats from the arena, which once had more than 6,000 seats. The most recent renovation includes the addition of Rad Dads restaurant on the building's east side. A new sports bar and restaurant called Carlisle's has since opened on the west side of the building. Carlisle's offers high end stadium food in a sports-themed atmosphere. The name Carlisle's comes from Louis Carlisle Walker, who originally spearheaded the arena construction.
A portion of a former Plumb's grocery store, built in 1936, was actually incorporated into the Arena; it was known as the LC Walker Arena annex, used for conventions, banquets, meetings and other special events. Now, the area is used by Peak Performance, an athletic training and rehabilitation center.
VanDyk Mortgage Convention Center
The VanDyk Mortgage Convention Center is a convention center which is attached to the Trinity Health Arena. The venue broke ground in May 2019 and opened on April 12, 2021.[3]
Louis Carlisle Walker
Louis Carlisle Walker (1875–1963) was a furniture maker, an 1896 graduate of the University of Michigan and founder of the Shaw-Walker company which revolutionized the office furniture industry. His success in business was matched by his generosity to the community, and the arena bore his name until 2019.
References
Page Template:Reflist/styles.css has no content.
- ^ Page Module:Citation/CS1/styles.css has no content."Hidden Gyms: Legeman's Court Vision". 6 June 2011.
- ^ Page Module:Citation/CS1/styles.css has no content."Mercy Health Arena in Muskegon will change names again". 15 April 2022.
- ^ Page Module:Citation/CS1/styles.css has no content."Muskegon officially opens $34 million convention center". April 12, 2021.
External links
Template:USHL Arenas Template:CIF Lua error in package.lua at line 80: module 'Module:Authority control/config' not found.