Valley View Bridge
Page Module:Infobox/styles.css has no content.
Valley View Bridge | |
|---|---|
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. Valley View Bridge as viewed from the east, 2012 | |
| Coordinates | Script error: No such module "WikidataIB". |
| OS grid reference | Script error: No such module "Ordnance Survey coordinates". |
| Carries | Script error: No such module "WikidataIB". |
| Crosses | Script error: No such module "WikidataIB". |
| Locale | Script error: No such module "WikidataIB". |
| Official name | Script error: No such module "WikidataIB". |
| Named for | Script error: No such module "WikidataIB". |
| Owner | Script error: No such module "WikidataIB". |
| Maintained by | Script error: No such module "WikidataIB". |
| Heritage status | Script error: No such module "WikidataIB". |
| ID number | Script error: No such module "WikidataIB". |
| Website | Template:URL2 |
| Next upstream | Script error: No such module "WikidataIB". |
| Next downstream | Script error: No such module "WikidataIB". |
| Characteristics | |
| Design | steel multi-stringer highway girder bridges |
| Material | Lua error in package.lua at line 80: module 'Module:GetParameters' not found. |
| Total length | Script error: No such module "WikidataIB". |
| Width | Script error: No such module "WikidataIB". |
| Height | Script error: No such module "WikidataIB". |
| Longest span | Script error: No such module "WikidataIB". |
| No. of spans | Script error: No such module "WikidataIB". |
| Clearance below | Script error: No such module "WikidataIB". |
| Diameter | Script error: No such module "WikidataIB". |
| Rail characteristics | |
| Track gauge | Script error: No such module "WikidataIB". |
| History | |
| Architect | Script error: No such module "WikidataIB". |
| Designer | Script error: No such module "WikidataIB". |
| Constructed by | Script error: No such module "WikidataIB". |
| Construction start | 1972 (outer spans), 2018 (middle span) |
| Construction end | 1975 (outer spans),[1] 2020 (middle span)[2] |
| Construction cost | Script error: No such module "WikidataIB". |
| Opened | Script error: No such module "WikidataIB". |
| Inaugurated | Script error: No such module "WikidataIB". |
| Closed | Script error: No such module "WikidataIB". |
| Demolished | Script error: No such module "WikidataIB". |
| Replaces | Script error: No such module "WikidataIB". |
| Replaced by | Script error: No such module "WikidataIB". |
| Statistics | |
| Daily traffic | 180000 |
| Toll | Script error: No such module "WikidataIB". |
| Location | |
| Script error: No such module "Infobox mapframe". | |
The Valley View Bridge is a trio of steel multi-stringer highway girder bridges that carry Interstate 480 over the Cuyahoga River valley in Valley View and Independence, Ohio. They are 215 feet (66 m) high and 4,150 feet (1,260 m) long.[3][5]
History
In 1971, construction of the Outerbelt South Freeway (I-480) began on both sides of the Cuyahoga River valley, in Valley View and Independence. To join the sections, two parallel bridge decks (one for westbound traffic and the other for eastbound traffic) were constructed. Each section consists of 93-foot (28 m) long beams connected by steel bolts, and the bridge supports are in concrete. The support pillars were completed within two years, and the decking within four years.[<span title="Script error: No such module "decodeEncode".">citation needed] The bridges opened in 1977 providing access to the nearby Willow Freeway (I-77).
In 1999,[citation needed] the Ohio Department of Transportation painted the bridge a red-primer color, replacing the original gray.
In 2010, the bridge received the honorary name "Union Workers Memorial Bridge".[6]
In 2011, ODOT began a project to retrofit the bridge's parapets. The work includes installing new fences and moving the overhead lighting to the outside of the structures. The estimated cost of construction was $4.4 million.[7][8]
In 2016, ODOT announced that a third bridge would be built in between the two outer bridges, which then would undergo extended repairs.[9] The third bridge, which had been planned along with the other two bridges in the 1970s,[10] was constructed from 2018 to 2020[2] and was retained after the bridge replacement phase ended in 2022, creating a bypass of the interchanges on each end of the bridge while functioning as express lanes.[3][11] The ribbon cutting for the middle bridge occurred on June 12, 2023.[12]
A pair of peregrine falcons nests under the bridge.[13]
Accidents
The city of Valley View has jurisdiction over the bridge, and they have been assisted by the police and fire departments from Garfield Heights and Independence.[citation needed]
- On February 17, 1986, a driver was rescued when his semi-truck partially left the bridge.[14]
- In February 1996, a car fell from the bridge, killing the driver.[15][16]
- In March 1997, police and the fire department responded to a dangling semi-truck. The driver was safely rescued.[7][17]
- On February 22, 2011, a semi-truck driver was killed when his cab fell off the bridge.[4]
- On June 25, 2013, during a severe storm, a couple of highway signs fell down hitting two cars and injuring one person.[18]
- On December 14, 2017, while attempting to elude police, a man drove down the steep embankment that separates the two spans of the bridge.[19]
- In March 2024, A fire broke out at a landscaping company located on Canal Road. The fire was started in a mulch bed that quickly grew sending flames and smoke straight up to the bridge during the morning rush hour.
See also
- Script error: No such module "portal-inline".
- Script error: No such module "portal-inline".
- Script error: No such module "portal-inline".
- List of crossings of the Cuyahoga River
- List of bridges in the United States by height
References
Page Template:Reflist/styles.css has no content.
- ^ Page Module:Citation/CS1/styles.css has no content."Valley View Bridge Fact Sheet" (PDF). Ohio Department of Transportation. 2020. Retrieved March 7, 2022.
- ^ a b c Page Module:Citation/CS1/styles.css has no content.Staff (September 13, 2020). "New I-480 Valley View Bridge Open to Eastbound Traffic" (Press release). Ohio Department of Transportation. Retrieved March 6, 2022.
- ^ a b c Page Module:Citation/CS1/styles.css has no content.Rudder, John (January 6, 2020). "Upon completion, I-480 Valley View bridge will carry 12 lanes of traffic across Cuyahoga River Valley". WEWS-TV. Retrieved January 7, 2020.
At any given time, 180,000 vehicles use the I-480 Valley View bridges which sit high above the Cuyahoga River Valley at 215 feet. [...] [Amanda McFarland, spokesperson, Ohio Department of Transportation District 12:] This middle bridge is going remain and it's going to carry two lanes in each direction. It will kind of serve as like an express lane and it will help motorists who don't want to access the 77 interchange to bypass it.
- ^ a b Page Module:Citation/CS1/styles.css has no content.Sangiacomo, Michael (February 22, 2011). "Driver dies when truck cab falls 200 feet from I-480 bridge". The Plain Dealer. Advance Ohio. Archived from the original on March 3, 2016. Retrieved November 7, 2016.
- ^ Page Module:Citation/CS1/styles.css has no content."Interstate 480".[self-published source]
- ^ Ohio Revised Code 5533.93
- ^ a b Page Module:Citation/CS1/styles.css has no content.Farkas, Karen (August 25, 2009). "Valley View I-480 bridge barrier replacement put off for two years". The Plain Dealer. Retrieved August 27, 2009.
- ^ "Retrofit Parapets of I-480 Bridges in Valley View and Independence Script error: No such module "webarchive".". Northeast Ohio Areawide Coordinating Agency, 2006. Retrieved on August 27, 2009.
- ^ Page Module:Citation/CS1/styles.css has no content.Christ, Ginger (July 6, 2016). "Valley View Bridge will be repaired two years earlier than planned". The Plain Dealer. Retrieved January 7, 2020.
- ^ Page Module:Citation/CS1/styles.css has no content.Ohio Department of Transportation (@OhioTransportation) (February 28, 2024). Replacing Bridge Decks on the Valley View Bridge ‐ Walsh Construction & ODOT D12. Event occurs at 0:45. Retrieved October 6, 2025 – via YouTube.
- ^ Page Module:Citation/CS1/styles.css has no content."I-480 Valley View bridge deck replacement set to begin" (Press release). Ohio Department of Transportation District 12. November 30, 2017.
Upon completion of the westbound bridge deck in fall 2022, the new bridge will remain in operation and carry two lanes in each direction. The two westbound lanes on the new bridge will bypass the I-77 interchange for those motorists wanting to continue on I-480. In the eastbound direction, the two lanes on the new bridge will by-pass the Transportation Blvd. exit.
- ^ Page Module:Citation/CS1/styles.css has no content."Ribbon Cut For New Valley View Bridge" (Press release). Ohio Department of Transportation. June 12, 2023. Retrieved June 29, 2023.
- ^ Page Module:Citation/CS1/styles.css has no content."I-480 Bridge, Cleveland/Valley View". Ohio's Peregrine Falcons. Ohio Department of Natural Resources. Archived from the original on January 4, 2009. Retrieved August 12, 2010.
- ^ Page Module:Citation/CS1/styles.css has no content."Safety Council Honors Seat-belt Survivors". The Plain Dealer. March 22, 1986. Archived from the original on February 23, 2011. Retrieved February 28, 2011.
- ^ Page Module:Citation/CS1/styles.css has no content.Fuetsch, Michele (February 28, 1996). "Vehicle Plunges Off I-480 Bridge". The Plain Dealer. Retrieved August 28, 2009.
- ^ Page Module:Citation/CS1/styles.css has no content.Breckenridge, Tom (September 21, 1996). "Driver Cleared in I-480 Collision". The Plain Dealer. Retrieved August 28, 2009.
- ^ Page Module:Citation/CS1/styles.css has no content.Martin, Maggie (March 7, 2007). "Trucker Saved from Perch on I-480 Bridge". The Plain Dealer. Retrieved August 28, 2009.
- ^ Page Module:Citation/CS1/styles.css has no content.Breckenridge, Tom (June 27, 2013). "Fallen sign on I-480 bounced, barreled through traffic, witness says". The Plain Dealer. Retrieved July 7, 2024.
- ^ Page Module:Citation/CS1/styles.css has no content."Man survives driving off I-480 bridge embankment while trying to elude police". WJW-TV. December 15, 2017.
External links
- Page Module:Citation/CS1/styles.css has no content."I-480 Valley View Bridge deck replacements". Ohio Department of Transportation. Retrieved September 13, 2020.
- Page Module:Citation/CS1/styles.css has no content."The Cloverleaf area". Roadfan.com.
Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.