Wheeler station
Page Module:Message box/ambox.css has no content.
This article relies largely or entirely on a single source. (September 2021) |
Page Module:Infobox/styles.css has no content.Page Template:Infobox station/styles.css has no content.
Wheeler | |||||
|---|---|---|---|---|---|
| Lua error in package.lua at line 80: module 'Module:InfoboxImage/data' not found. Wheeler Station | |||||
| General information | |||||
| Location | 4500½ Main Street, Houston, TX | ||||
| Coordinates | Lua error: callParserFunction: function "#coordinates" was not found. | ||||
| Owned by | METRO | ||||
| LineTemplate:Pluralize from text | File:Houston METRORail Red Line icon.svg Red Line
University/Blue Line (future) | ||||
| Platforms | 2 side platforms | ||||
| Tracks | 2 | ||||
| Connections | 5, 25, 65, 152, 153 | ||||
| Construction | |||||
| Structure type | At grade | ||||
| Platform levels | 1 | ||||
| Cycle facilities | Racks located at station; bicycles allowed on Metrorail during off-peak hours | ||||
| Accessible | yes | ||||
| Other information | |||||
| Fare zone | 1 Local | ||||
| History | |||||
| Opened | January 1, 2004 | ||||
Page Module:Infobox/styles.css has no content.
| |||||
Script error: No such module "Parameter validation".Script error: No such module "Check for conflicting parameters".
Wheeler Station is a station on the METRO Red Line in Houston. The station is located at the intersection of Main Street and Wheeler Street in Midtown.[2]
This station will also be a transfer station for the METRORapid University Line, when it is built.
Prior to the construction of the METRORail Purple Line, Wheeler Station was the only station in the system that had platforms that faced each other. UH South/University Oaks station became the second station to implement this platform configuration.
References
Page Template:Reflist/styles.css has no content.
- ^ Page Module:Citation/CS1/styles.css has no content."METRORapid University Corridor | Bus Rapid Transit | METRO | Houston, TX". Ride Metro.
Construction is now expected to begin summer 2026. It's anticipated that construction will last about four years with a start of service now planned for 2030.
- ^ There are separate boundaries for the Midtown Super Neighborhood and the Midtown Management District. See City of Houston maps: Midtown Super Neighborhood and Management district map. Retrieved on June 4, 2019. - Also see: 2006 Midtown Management District Land Use Map and "SERVICE AND IMPROVEMENT PLAN AND ASSESSMENT PLAN FOR FISCAL YEARS 2015-2024 Script error: No such module "webarchive".." Midtown Houston Management District. Retrieved on April 4, 2009. Map on page 25/25 of the PDF.
Lua error in mw.title.lua at line 404: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
Template:Redstations Lua error in package.lua at line 80: module 'Module:Navbox/configuration' not found.
Lua error in package.lua at line 80: module 'Module:Navbar/configuration' not found.
Template:Asbox
Template:Asbox